8.2.2

Parallel UPS shutdown with load transfer on manual bypass (Q2)

The purpose of this procedure is to supply the load directly by mains through manual bypass Q2.
This procedure is normally performed when the UPS must be completely switched OFF for maintenance
or service purpose, performed by an authorised Service Centre.
1.
Switch OFF the inverter on each unit entering the screen:
MENU/COMMAND MENU/INVERTER OFF
Attention:
to switch OFF permanently the inverter the key
Enter must be pressed 2 times.
The output will be supplied by the mains through all automatic
bypass.
2.
Switch ON the maintenance bypass Q2 (I) on each unit.
3.
Switch OFF the output switch Q1 (0) on each unit.
4.
Perform the command total off on each unit.
5.
Remove the rectifier-input fuses F1, F2, F3 and the battery fuses F9, F10, F11 (remove the external
battery fuses in case of external battery) on each unit.
Modifications reserved
OPM_LPS_33E_10K_30K_4GB_V030.doc
COMMAND MENU
INVERTER ON
INVERTER OFF
LP 33
20kVA P1
APPLICAT. ON UTILITY
= 70%
LP 33
20kVA P1
APPL. ON MANUAL DEV.
= 70%