Table 35: Port Loopback test dialog box messages (Continued)
No device detected in selected port yet. Test
will not be run on empty port.
Request to get admin privileges failed.
Request to start loopback test failed.
or
Request to stop loopback test failed.
or
Request for loopback test results failed.
or
Request to reset loopback test results failed.
Switch is currently unreachable. Unable to
accurately report status of port test.
The port selected for online port test must be
online with active login.
Timed out on response notifications. Test
terminated.
Unable to perform loopback test on port...
HP StorageWorks 2/8q Fibre Channel Switch Management User Guide
Message
because port is not in diagnostic state.
because port is a donor port.
because there is already a port test in
progress.
User action
Verify that a loopback device is attached to the
port before starting loopback test.
Verify that the port is online with an active
login before starting the loopback test.
Verify that another user is not currently
modifying the switch configuration, using
either the management application, or a telnet
login, or any application, and then retry the
operation.
Verify that the user has permissions to modify
the configuration on the switch, that the switch
is reachable in the fabric, and that the fabric is
reachable from the user's workstation, and
then retry the configuration change.
The application lost communications with the
switch while the switch was running the
loopback tests, and could not determine
whether the tests completed. If the problem
was temporary, restart the loopback tests.
Verify that the port is online with an active
login before starting the loopback test.
The application lost communications with the
switch while the switch was running the
loopback tests, and could not determine
whether the tests completed. If the problem
was temporary, restart the loopback tests.
Correct the error indicated, and then retry the
loopback test.