HP ProCurve 1600M Installation Manual page 75

Switches and hubs
Table of Contents
specifications
connectors ... A-2
electrical ... A-1
environmental ... A-1
physical ... A-1
safety ... A-2
straight-through cable
pin-out ... B-6
summary
of cables used with the switch ... 2-4
of switch installation ... 2-2
switch
connecting to a power source ... 2-13
description ... 1-1
electrical specifications ... A-1
environmental specifications ... A-1
features ... 1-7
front panel description ... 1-2
included parts ... 2-1
LED descriptions ... 1-3
mounting in a rack or cabinet ... 2-10
mounting on a wall ... 2-13
mounting on horizontal surface ... 2-12
operation ... 1-8
physical specifications ... A-1
switch modules
booting the switch to initialize new module
type ... 2-6
hot swapping ... 2-20
installing ... 2-6
LEDs description ... 1-4
slot, location on Switch 1600M ... 1-2
slot, location on Switch 2424M ... 1-6
switch operation
address table ... 1-8
description ... 1-8
effect of VLANs ... 1-9
filtering out traffic ... 1-8
flooding traffic ... 1-8
forwarding traffic ... 1-8
network moves and changes ... 1-8
simultaneous network communications ... 1-9
verifying after installation ... 2-8
T
telnet access to the console ... 2-16
terminal configuration ... 2-15
testing
checking the console messages ... 3-8
checking the LEDs ... 3-8
diagnostic tests ... 3-8
end-to-end communications ... 3-10
link test ... 3-9
Ping test ... 3-9
switch operation ... 3-8
switch-to-device communications ... 3-9
twisted-pair cabling ... 3-9
tips for troubleshooting ... 3-2
topologies
effects of improper topology ... 3-2
samples of ... 2-17
troubleshooting ... 3-1
basic tips ... 3-2
checking the console messages ... 3-8
checking the LEDs ... 3-8
common network problems ... 3-2
diagnostic tests ... 3-8
effects of improper topology ... 3-2
effects of non-standard cables ... 3-2
incorrect network connections ... 3-2
link test ... 3-9
Ping test ... 3-9
Proactive Network tools ... 3-7
restoring factory default configuration ... 3-10
testing connections to other devices ... 3-9
testing end-to-end communications ... 3-10
testing the switch ... 3-8
testing the twisted-pair cables ... 3-9
twisted-pair cable
cross-over cable pin-out ... B-6
pin-outs ... B-3, B-6
straight-through cable pin-out ... B-6
switch-to-computer connection ... B-4
switch-to-switch or hub connection ... B-5
testing ... 3-9
twisted-pair cables ... B-2
Index – 5
Table of Contents
loading

Table of Contents