Installation Instructions Installation - Redrculating; Step 1. Wiring Locations; Step 2. Wall And Cabinet Preparation - GE Monogram ZV30H Installation Instructions Manual

30" woll-mounted hood
Hide thumbs Also See for Monogram ZV30H:
Table of Contents
Available languages

Available languages

Installation
Instructions
INSTALLATION - RECIRCULATING
[_-IWIRING
LOCATIONS
Determine the exact location of the vent hood.
• Locate the template
packed with the literature.
- Measure 36" from the floor to the top of the cook-
ing surface. Add hood installation
height deter-
mined on previous pages. Mark that location.
- Use a level to drawa
straight pencilline
on the
Wall.
- Tape the template
in position along the penciled
line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.
i
'
7
i
.....................................
ii
HOUSE WIRING LOCATION:
• The junction
box is located on the top right side of
the hood.
• Wiring can enter the cabinet from the ceiling or
from the back wall.
• Route additional
wiring length to reach the junction
box.
[-_IWALL AND CABINET PREPARATION
IMPORTANT
--The
vent hood must be secured
to the cabinet and at least two wall studs and
drywall with anchors. Cabinet must be capable of
supporting
100 Ibs.
• With the template
taped in place, use a punch to
mark all mounting
screw locations
and electrical
holes according
to your application.
• Drill a minimum
3/4" hole for electrical cable in
bottom of the cabinet.
• Drill 1/8" pilot holes at the 4 punched locations on
the bottom of the cabinet.
• Drill 1/8" pilot holes at the 4 punched locations
on
the wall
• Remove the template.
• Enlarge holes that did not enter studs to 5/16".
Tap anchors for wall fasteners into the holes.
Cabinet template
I
Cabinet mounting
screw locutions
holes which alk,n with the studs.
15
Table of Contents
loading

This manual is also suitable for:

Monogram zv3ohs

Table of Contents