The tower-to-rack conversion kit includes:
•
Rack-mounting hardware kit
•
Rack bezel
•
Front video connector cable
•
T-15 screws (6)
•
Screwlocks (2)
•
This document
In addition to the items supplied in the conversion kit, you will also need the following items:
•
A Torx T-15 screwdriver (clipped to the rear panel of the server)
•
A 3/16-in nut driver
To convert a tower model server to a rack model server:
Power down the server (on page 22).
1.
Disconnect all rear panel cabling.
2.
Remove the feet.
3.
Remove the tower bezel
4.
Remove the access panel (on page 25).
5.
Remove the air baffle (on page 26).
6.
Remove the fan cage (on page 26).
7.
Remove all SFF hard drives
8.
Disconnect all cables from the drive cages.
9.
Remove the SFF drive cages.
10.
For more information, see the server maintenance and service guide.
Remove the hard drive cage blank (on page 28).
11.
Remove the DVD-ROM drive (on page 28), if installed.
12.
Remove the two-bay LFF drive cage, if installed.
13.
("Open or remove the tower
("Removing a hot-plug SAS hard
bezel" on page 22).
drive" on page 54).
Hardware options installation 81