Table of Contents
Available languages

Available languages

Installation Instructions
[]
INSTALL CEILING BRACKET
The ceiling bracket must be installed when the duct
cover is used to spun 24" or more height above the hood.
The bracket will hold the decorative duct cover in place
at the top.
Note: The ceilling bracket is not required when using only
the 12" section of the duct cover.
,
Install the 2 small screws into the sides of the duct
bracket, remove the screws. Pre-tapping the holes will
insue ease of final installation.
,
Hatch center notch on the bracket to the centerline
on the wall and flush against the ceiling.
,
Hark the 2 screw hole locations.
,
Drill 2/8" pilot holes in marked bracket location.
,
If pilot holes do not enterstuds, enlarge the holes to
3/8" and install wall fastener anchors.
,
Secure the bracket to the rear wall with wood screws
and washers. Use wall anchors if needed.
Note: Bracket has 2 sets of holes. Use larger holes
for wall fasheners or wood screws with washers. Use
smaller holes for wood screws with washers.
Install Ceiling
Bracket When_
_
""
i/_-.
Duct Cover is
i'///:'"
Used to Span 24"
_
.,,'"
or more
'
""
See Step
9 to Install
Duct
CONNECT DUCTWORK
,
Push duct over the end of the transition until it
reaches the stop tabs.
,
Install ductwork, making connections in direction of
airflow as illustrated.
,
Secure joints in ductwork with sheetmetal screws.
,
Wrap all duct joints with duct tape for an airlight seal.
,
Use duct tape to seal the flange connection
House
Ductwork
Air Flow
Duct Tape Over
Seam and
Screw
Duct Tape Only for Proper
Ductwork
Operation of Damper
.......
Duct Stops
Transition
Duct Tape Ov_r
Flange
A,-,^,
,-,-,,-,,,,
J;L_,/'_V/I_JI_i:
Do not use sheet metal screws
at the transition to ductwork connection. Doing se will
prevent proper damper operations. Seal connection with
tape only.
15
Table of Contents
loading

This manual is also suitable for:

Jv966Cv936Cv966

Table of Contents