5.
Use a lift to raise the chassis to the correct level. If installing the chassis in a cabinet, follow the
instructions provided by the rack kit manufacturer.
Installing components into the new chassis
Install the field replaceable units (FRUs) in the chassis.
CAUTION:
Wear a grounded ESD strap when handling DC SAN Director components and port blades. The
chassis provides a grounding connection above the power connectors. Also, store ESD-sensitive
components in antistatic packaging.
1.
Replace the WWN bezel (logo plate) and WWN cards (see
"Installing the WWN bezel (logo plate) and WWN
2.
Replace the blower assemblies (see
3.
Replace the power supplies or filler panels (see
4.
Replace the control processor blades (CP8) (see
"Installing a control processor blade
5.
Replace the core switch blades (CR8) (see
6.
Replace the port blades or filler panels (see
7.
Replace the cable management comb (see
8.
Connect the power cords to the power supplies and the power outlets.
9.
Power-on the DC SAN Director.
10.
The DC SAN Director performs a power-on self-test (POST). The POST takes a minimum of three
minutes and is complete when LED activity returns to standard state.
11.
Verify that the DC SAN Director is powered on and POST is complete (all power LED indicators
on the port, control processor, and core switch blades should be a steady green).
12.
Verify that all components are functioning correctly by checking their LEDs. If the LEDs do not
indicate correct operation, try reinstalling the corresponding component.
Configuring the new chassis serial number
To configure a new chassis serial number:
104
Replacing DC SAN Director field-replaceable units (FRUs)
card" on page 95).
"Installing a blower
assembly" on page 90).
"Installing a power
(CP8)" on page 83).
"Installing a core switch blade
"Installing a Director
"Installing a cable management
supply" on page 88).
(CR8)" on page 87).
blade" on page 77).
comb" on page 75).