Instructions - Right-Hand Unit (Sm0**-1Hz-*R*-**) - Bosch Greensource CDi Series Installation, Operation And Maintenance Manual

Table of Contents
SM Series Heat Pump
12. Reinstall bracket removed in step (#3) using (3)
screws in the same location. (Figure#17)
Figure # 17
13. Reinstall remaining bracket using (2) screws.
(Figure#18)
Figure # 18
14. Connect vertical and horizontal brackets by
installing (4) screws. (Figure#19)
Figure # 19
15. Reconnect blower motor wiring and ground wire.
16. Install the new blower panel from the accessory kit.
Revised 07-17
Instructions - Right-Hand Unit (SM0**-
1HZ-*R*-**)
1.
Remove and retain end and side panels.(Figure#20)
2
1
Figure # 20
2.
Disconnect blower motor wiring and ground wire
fastened to blower housing.(Figure#21)
Figure # 21
3.
Remove and retain (4) screws under the blower
collar. (Figure #22)
Figure # 22
Horizontal Configurability | 9
2
1
8733942411 (2017/06)
Table of Contents
loading

Table of Contents