ABB RT G2 5-10 kVA UL User Manual
ABB RT G2 5-10 kVA UL User Manual

ABB RT G2 5-10 kVA UL User Manual

External battery module

Quick Links

U S E R M A N UA L
External battery module
For RT G2 5-10 kVA UL
PREPARED: Elvan Chen
APPROVED: Patricia Kuenzle
OWNING ORGANIZATION:
ABB Switzerland Ltd.
© Copyright 2022 ABB. All rights reserved.
STATUS
Approved
DOCUMENT KIND: Operating manual
DOCUMENT ID: 4NWD005661 REV: A
SECURITY LEVEL: Public
PAGE:
1 / 20
LANG: EN
Table of Contents
loading

Summary of Contents for ABB RT G2 5-10 kVA UL

  • Page 1 — U S E R M A N UA L External battery module For RT G2 5-10 kVA UL STATUS PREPARED: Elvan Chen Approved SECURITY LEVEL: Public APPROVED: Patricia Kuenzle DOCUMENT KIND: Operating manual OWNING ORGANIZATION: PAGE: 1 / 20 ABB Switzerland Ltd.
  • Page 2: Table Of Contents

    Storage ..........19 STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 2 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 3: Important Safety Instructions

    BOOKLET BEFORE STARTING WORK OR BEFORE OPERATING EQUIPMENT OR MACHINERY IS COMPULSORY. DO NOT DISPOSE OF WITH ORDINARY TRASH. STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 3 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 4: Important Safety Warnings

    Servicing of Batteries Should be Performed or Supervised by Trained Personnel with Knowledge of Batteries and the Required Precautions NOTE STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 4 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 5: Ups Disposal And Recycling

    RESOURCES AND PREVENT ANY POTENTIAL NEGATIVE EFFECTS ON HUMAN HEALTH AND THE ENVIRONMENT, WHICH COULD OTHERWISE ARISE FROM INAPPROPRIATE WASTE HANDLING STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 5 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 6: For Disposal In Countries Outside Of The European Union

    IEC 61000-4-8 (Power Frequency Magnetic Field Immunity): level 4. • IEC 61000-2-2 (Low Frequency Signals) • IEC 61000-4-3 (RS): level 3 STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 6 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 7: Introduction

    HDPE Polyvinyl chloride Low-density polyethylene LDPE Polypropylene Polystyrene FOLLOW ALL LOCAL REGULATIONS FOR THE DISPOSAL OF PACKING MATERIALS NOTE STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 7 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 8: General Characteristics

    3 1 Rear Panel View — 3.1-1 Rear Panel View — 3.1-1 Item EBM Breaker Downstream EBM connector(output) Upstream EBM connector(input) STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 8 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 9: Installation

    PACKING MATERIALS MUST BE DISPOSED OF IN COMPLIANCE WITH ALL LOCAL REGULATIONS CONCERNING WASTE. RECYCLING SYMBOLS ARE PRINTED ON THE PACKING MATERIALS TO FACILITATE SORTING. STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 9 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 10: Check The Inside Package

    4. Do not place the unit in a dusty or corrosive environment or near any flammable objects. 5. This unit is not designed for outdoor use. STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 10 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 11: Install In The Rack Position

    Step 2: Place EMBS (optional), UPS, EBM, and ISO TX (optional) on tower feet assembly. Please refer to the below diagram. — 4.4.2-2 STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 11 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 12: Connecting With Ups And Other Battery Pack

    REMOVE THE BATTERY CONNECTOR COVER BEFORE CONNECTING WITH UPS AND OTHER BATTERY PACK. NOTE First battery pack Second battery pack — 4.4.3-1 STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 12 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 13: Battery Installation

    Step 1: Remove the topcover as below diagram. — Step 2: Remove the battery fixing plates from the bottom case as below diagram. — STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 13 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 14 Step 3: Place the battery into the bottom case and then, assemble the battery fixing — plates with screws back on bottom case as below diagram. Step 3 — STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 14 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 15 E X T E R N A L B AT T E R Y M O D U L E F O R R T G 2 5 - 1 0 K VA U L Step 4: Connect the battery wire as below diagram. — Step 4 — STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 15 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 16 8 inches 1pcs AWG10 BLK 200mm 8 inches 1pcs AWG10 BLK 250mm 10 inches 1pcs AWG10 RED 530mm 21 inches STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 16 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 17: Specification

    FCC CFR 47 Part 15 Class A Safety UL 1778, CSA 107.3 Transportation IEC 60068-2-31 IEC 60068-2-64 IEC 60068-2-27 STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 17 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 18: Environmental

    Minimum Clearances from 25cm (1inch) for front and rear side other cabinet 0cm for left and right side IP grade IP20 STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 18 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 19: Storage & Maintenance

    Recharge Frequency Every 3 months (-15°C - 40°C/5°F – 104°F) Every 2 months (40°C - 45°C/104°F-113°F) Charging Duration 1-2 hours STATUS: SECURITY LEVEL: DOCUMENT ID: REV: LANG: PAGE: 19 / 20 Approved Public 4NWD005661 © Copyright 2022 ABB. All rights reserved.
  • Page 20 — ABB Switzerland Ltd. Via Luserte Sud 9 6572 Quartino Switzerland www.abb.com/ups © Copyright 2022 ABB. All rights reserved. Specifications subject to change without notice.

Table of Contents