Quick Links

User Manual
Battery cabinet
for PowerValue 11-31T 10-20kVA
© Copyright 2015 ABB, All rights reserved
loading

Summary of Contents for ABB Battery cabinet for PowerValue 11-31T 10-20 kVA

  • Page 1 User Manual Battery cabinet for PowerValue 11-31T 10-20kVA © Copyright 2015 ABB, All rights reserved...
  • Page 2 Document information File name 4NWP101805R0001_OPM_ABB_PVA11-31-T_BAT_CAB_EN_REV-A.docx : Battery cabinet for PowerValue 11-31T 10-20 kVA Model Date of issue : 21.09.2015 Article number : 4NWP101805R0001 Document number : 4NWD003001 Revision Foreword The battery cabinet operates with mains, battery or bypass power. It contains components that carry high currents and voltages.
  • Page 3 Contents 1 Safety rules ....................4 2 Installation ....................5 3 Electrical drawing ..................10 4 Revision history ..................11 Modifications reserved Page 3/12...
  • Page 4: Safety Rules

    1 Safety rules The battery cabinet operates with batteries that carry high currents and voltages. The properly installed battery cabinet is grounded to earth and IP 20 rated against electrical shock and foreign objects. Installation and service have to be done by the manufacturer’s qualified technicians or their certified service partners −...
  • Page 5 KEEP OUT OF BATTERY POLES WHICH CONTAIN DANGEROUS DC- VOLTAGES CAUSING FATAL ACCIDENTS. NOTE: MANIPULATION ON THE BATTERY SYSTEM SHOULD ONLY BE DONE BY TRAINED SERVICE AND MAINTENANCE PERSONEL OF THE MANUFACTURER OR HIS CERTIFIED SERVICE PARTNERS. INAPPROPRIATE MANIPULATIONS OF THE BATTERIES CAN CAUSE LIGHTNING SPARKS.
  • Page 6: Installation

    2 Installation − PARALLEL BATTERY CABINETS OR UPS INTERNAL BATTERIES MAY PRESENT VOLTAGE AT TERMINALS OF A BATTERY CABINET UNDER SERVICE. MAKE CERTAIN ALL POLES OF THE BATTERY CABINET DISCONNECT DEVICE ARE OPEN BEFORE UNDERTAKING INTERNAL SERVICE ACTIVITY. − MAKE CERTAIN ALL DISCONNECT DEVICES OF INSTALLED WARNING! BATTERIES ARE OPEN BEFORE CONNECTING OR DISCONNECTING AN ADDITIONAL BATTERY CABINET TO BATTERY VOLTAGE BUS’.
  • Page 7 3. Extract the 6 plastic battery trays from the unit one by one. (fig. 3) 4. Take 8 batteries and place them inside the plastic battery tray by taking care of the correct side, please refer to the figure 4. Fig.
  • Page 8 8. Re-insert all the cabled battery trays inside the unit by using the correct shelf how described on the chapter 3 (Electrical drawing). (fig. 7 and fig. 8) Fig. 7 Fig. 8 9. Connect all the shelf’s together how described on the chapter 3 (Electrical drawing).
  • Page 9 11. After have been cabled all the battery trays, use a multimeter to check the correct voltage of the unit that should be approx.. 288V. 12. If the test works fine, you can close the unit by re-assemble all the covers and connect the battery cabinet with a UPS, for more information refer to the chapter 4.3.2 of the user manual.
  • Page 10: Electrical Drawing

    3 Electrical drawing Modifications reserved Page 10/12...
  • Page 11: Revision History

    4 Revision history Revision number Chapter Description Date First release. 15.09.2015 Modifications reserved Page 11/12...
  • Page 12 Contact us www.abb.com/ups © Copyright ABB. All rights reserved. Specification [email protected] subjects to change without notice.