Hitachi 3090 G2 Hardware Reference Manual
Hitachi 3090 G2 Hardware Reference Manual

Hitachi 3090 G2 Hardware Reference Manual

Nas platform
Hide thumbs Also See for 3090 G2:
Table of Contents

Quick Links

Hitachi NAS Platform
3080 and 3090 G2 Hardware Reference
Release 13.4
MK-92HNAS017-13
March 2018
Table of Contents
loading

Summary of Contents for Hitachi 3090 G2

  • Page 1 Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference Release 13.4 MK-92HNAS017-13 March 2018...
  • Page 2 Materials. “Materials” mean text, data, photographs, graphics, audio, video and documents. Hitachi reserves the right to make changes to this Material at any time without notice and assumes no responsibility for its use. The Materials contain the most current information available at the time of publication.
  • Page 3: Table Of Contents

    Avis de conformité aux normes du ministère des Communications du Canada......................22 Radio Protection for Germany................22 Food and Drug Administration (FDA)..............22 Chinese RoHS Compliance Statement..............22 South Africa: ICASA...................23 Chapter 4: System overview..............24 System components..................24 Contents Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 4 USB ports..................... 48 Management interfaces..................48 RS-232 serial management port ..............49 10/100/1000 Ethernet management ports............50 Ethernet cables ....................50 Chapter 6: Replacing server components.......... 51 Field-replaceable units..................51 Hot-swappable components................51 Contents Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 5 Powering down the server for shipment or storage........... 73 Powering on the server or cluster..............74 Recovering from power standby................ 75 Appendix A: Server replacement procedures........76 Replacement procedure overview..............76 Requirements....................76 Swapping components................. 77 Model selection.....................77 Contents Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 6 Obtaining backups, diagnostics, firmware levels, and license keys... 101 Shutting down the servers you are replacing..........103 Configuring the replacement servers............105 Finalizing and verifying the system configuration........106 Appendix B: Parts list for 3080/3090 G2 servers......108 Contents Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 7: Preface

    Preface This manual provides an overview of the Hitachi NAS Platform and the Hitachi Unified Storage File Module hardware. The manual explains how to install and configure the hardware and software, and how to replace faulty components. The following server models are covered: 3080 and 3090 For assistance with storage arrays connected to the server, refer to the Storage Subsystem Administration Guide.
  • Page 8 ■ configuring the server to work with NDMP, and making and managing NDMP backups. Note: For a complete list of Hitachi NAS open source software copyrights and licenses, see the System Access Guide. Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 9 ■ Universal Migrator (UM) feature provides customers with a convenient and minimally disruptive method to migrate from their existing NAS system to the Hitachi NAS Platform. The practices and recommendations outlined in this document describe how to best use this feature.
  • Page 10: Accessing Product Documentation

    Getting help Hitachi Support Connect is the destination for technical support of products and solutions sold by Hitachi. To contact technical support, log on to Hitachi Support Connect for contact information: https://support.hitachivantara.com/en_us/contact-us.html. Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 11: Comments

    Include the document title and number, including the revision level (for example, -07), and refer to specific sections and paragraphs whenever possible. All comments become the property of Hitachi. Thank you! Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 12: Chapter 1: About This Manual

    Chapter 1: About this manual This manual provides an overview of the NAS Platform and the Hitachi Unified Storage File Module hardware. The manual explains how to install and configure the hardware and software, and how to replace faulty components.
  • Page 13 VORSICHT: Das Wort “Vorsicht” weist auf mögliche Schäden für Daten oder Ihre Ausrüstung hin. Sie sollten erst dann fortfahren, wenn Sie die durch dieses Wort gekennzeichneten Informationen gelesen und verstanden haben. Chapter 1: About this manual Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 14 PERICOLO: “Pericolo” indica l'eventuale pericolo di danno provocato alle persone, mettendo a rischio la vostra incolumità personale. Chapter 1: About this manual Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 15 FÖRSIKT: “Försikt” anger vad som kan leda till data eller utrustningsskador. Fortsätt inte till nästa avsnitt innan du förstår det steg som har markerats med detta meddelande. VARNING: “Varning” anger vad som kan leda till personskador. Chapter 1: About this manual Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 16: Chapter 2: Safety Information

    Fill all expansion cabinets, including all storage enclosures, from the ■ bottom to the top. Do not remove more than one unit from the rack at a time. ■ Chapter 2: Safety information Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 17 6. Once the bottom half of the storage cabinet has been filled, the top half of the storage cabinet can be filled. Begin by placing a storage component directly above the server and then fill upwards. Chapter 2: Safety information Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 18: Electrical Precautions

    Unplug a system component if it needs to be moved or if it is damaged. ■ Note: For additional data protection, Hitachi recommends that you use an external UPS to power the server. Also, each of the redundant power supplies in the server and in the storage subsystems should be operated from a different mains power circuit in order to provide a degree of protection from mains power supply failures.
  • Page 19 See Hitachi Support Connect for technical details about replacement parts. Maintain backup routines. Do not abandon backup routines. No system is completely ■ foolproof. Chapter 2: Safety information Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 20: Chapter 3: Mandatory Regulations

    China: CCC ■ Russia: GOST-R ■ Taiwan: BSMI ■ Argentina: IRAM ■ Australia & New Zealand: C-Tick ■ Mexico: NOM and CONUEE ■ South Africa: ICASA ■ Chapter 3: Mandatory regulations Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 21: Federal Communications Commission (Fcc)

    Caution: This is a Class A product and as such, in a domestic environment, might cause radio interference. Chapter 3: Mandatory regulations Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 22: Canadian Department Of Communication Compliance Statement

    Food and Drug Administration (FDA) The product complies with FDA 21 CFR 1040.10 and 1040.11 regulations, which govern the safe use of lasers. Chinese RoHS Compliance Statement Chapter 3: Mandatory regulations Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 23: South Africa: Icasa

    South Africa: ICASA South Africa: ICASA TA 2016-211 Approved Chapter 3: Mandatory regulations Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 24: Chapter 4: System Overview

    Chapter 4: System overview This chapter describes the components in the Hitachi NAS Platform server system for the following models: Hitachi NAS Platform, Model 3080 ■ Hitachi NAS Platform, Model 3090 ■ System components The system contains many components and is housed in a rack or cabinet. This section describes the main system components.
  • Page 25: Server Specifications

    SMU provides the management functionality. In some cases, multiple SMUs are advisable. Storage A Hitachi NAS Platform or Hitachi Unified Storage File Module system subsystems can control several storage enclosures. The maximum number of storage enclosures in a rack depends on the model of storage enclosures being installed.
  • Page 26 Maximum rate of temperature change per hour (storage) 15° C (27° F) ■ Temperature range (transit): -20° to 60° C (-4° to 140° F) ■ Maximum rate of temperature change per hour (transit) 20° C (36° F) ■ Chapter 4: System overview Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 27: Attaching A Rack Stabilizer Plate

    Attaching a rack stabilizer plate A rack stabilizer plate and mounting hardware are supplied with some system configurations. Hitachi recommends that you always use the stabilizer plate when provided. Use of a stabilizer plate is required for those installations with dense trays.
  • Page 28: Chapter 5: Hitachi Nas Platform Server Components

    This section describes the components included in the server chassis. A Hitachi Unified Storage File Module system can contain single Hitachi NAS Platform server or several servers that operate as a cluster. Clusters of more than two servers include two 10 Gbps Ethernet switches. Hitachi only requires two switches for redundancy.
  • Page 29: Server Front Panel

    Server front panel Server front panel The front of the server features a removable bezel that shields the front-facing server components. Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 30 Disk A status LED Fan 1 Fan 2 Power status LED Server status LED NVRAM battery backup pack status LED Fan 1 status LED Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 31: Led Status Indicators

    Hard disk drive B status LED NVRAM battery backup pack status LED Fan 1 status LED Fan 2 status LED Power status LED Server status LED Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 32 The server needs attention, and a non-critical failure has been (once every .8 detected, for example, a fan or power supply has failed. seconds) Normal operation. Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 33 If this LED is on during the course of normal operation (not after installing a new hard disk), either the disk has failed or the server’s RAID configuration has been degraded. Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 34: Nvram Backup Battery Pack

    24 hours. During the conditioning cycle, the full NVRAM content backup protection time of 72 hours cannot be guaranteed. Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 35 . Contact customer support for information about recharging batteries. To replace the NVRAM battery backup pack, see Replacing the NVRAM backup battery pack (on page 54) Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 36: Hard Disk Drives

    If this LED is on during the course of normal operation (not after installing a new hard disk), either the disk has failed or the server’s RAID configuration has been degraded. Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 37: Fans

    Figure 6 Fan and fan status LED locations - models 3080 and 3090 Item Description Fan 1 (left) Fan 2 (right) Fan 1 status LED Fan 2 status LED Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 38: Server Rear Panel

    Note: Except for the ports and connectors described in the following, none of the other ports or connectors should be used without guidance from technical support. Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 39 External system management. Connect (gray logo) to the customer's management switch. ETH1 1000baseT Ethernet Management port. Connect to the (yellow logo) rack's internal Ethernet switch. Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 40: Rear Panel Server Led And Button Locations

    Green NVRAM contents are protected by battery power (flashing) Amber Battery pack is faulty or not fitted (solid) Disabled or NVRAM battery power exhausted Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 41: Power Button (Pwr)

    Under normal circumstances, the power button is rarely used. However, the power button can be used to restore power to the system when the server is in a standby power state. Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 42: Reset Button (Rst)

    Part number prefixes are different as follows: 10 GbE: FTLX ■ FC: FTLF ■ Figure 9 Fibre Channel storage ports label Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 43: 10/100 Private Ethernet Ports

    10 or 100 Mbps link present (On, not flashing) Green Off No link Activity Amber Flashing Network activity Amber Off No network activity GE Ethernet network ports Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 44: 10 Gbe Ports

    (10) gigabits per second. Do not use the 10 GbE cluster interconnect ports to connect to the customer data network (also known as the public data network). Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 45: 10 Gigabit Ethernet Customer Data Network Ports

    Once connected, each 10 GbE port has two indicator LEDs; one green and one amber. These LEDs provide link status and network activity status information as follows: Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 46: Power Supply Units

    Item Description PSU fan exhaust Power cord connector PSU retention latch PSU handle DC power status LED PSU status LED AC power status LED Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 47 Each power supply auto-ranges over an input range of 100V to 240V AC, 50 Hz to 60 Hz. Caution: If the server is non-responsive, see Restarting an unresponsive server (on page 71) . Do not pull the power cord. Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 48: Ethernet Management Ports 0 And 1

    Note: The USB ports should not be used without guidance from customer support. Management interfaces The server panel features two types of physical management ports: RS-232 Serial (DB-9) and 10/100/1000 Ethernet (RJ45). Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 49: Rs-232 Serial Management Port

    Table 17 Host setting values Terminal Requirement Connection Crossover (null modem) cable Emulation VT100 Baud rate 115,200 Bps Data bits Stop bits Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 50: 10/100/1000 Ethernet Management Ports

    CABLE ETHERNET PATCH LEAD CAT6 SF/UTP 3 Meter HARTING 09474747113 CABLE ETHERNET PATCH LEAD CAT6 SF/UTP 5 Meter HARTING 09474747115 CABLE ETHERNET PATCH LEAD CAT6 SF/UTP 10 Meter HARTING 09474747121 Chapter 5: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 51: Chapter 6: Replacing Server Components

    Some components are field-replaceable units (FRUs). Important: The FRUs can only be replaced by certified engineers. These components are not customer replaceable units (CRUs). FRUs include the following components: Hitachi NAS Platform or Hitachi Unified Storage File Module servers ■ Bezels ■...
  • Page 52: Removing And Replacing The Front Bezel

    (behind the bezel) to see which fan has failed. In the following figure, number 1 indicates the status LED for fan 1 (the left-side fan), and number 2 indicates the status LED for fan 2 (the right-side fan). Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 53 6. Secure the fan assembly in position by tightening the thumbscrews (turning them clockwise). 7. Replace the front bezel. Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 54: Replacing The Nvram Backup Battery Pack

    These logs, along with the server’s event log, are useful in monitoring the state of the battery. Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 55: Identifying A Cluster Node That Requires Battery Replacement

    Event Log message. Both the server status and fault LEDs on the node will flash, allowing you to identify the node. Refer to the Hitachi NAS Platform Command Line Reference for more information on the led-identify-node command. Replacing the NVRAM battery module You can easily replace the NVRAM battery pack in a server.
  • Page 56: Collecting System Backups And Diagnostics

    2. Open a browser session to the SMU. (External: 192.0.2.1; Embedded: 192.0.2.2). 3. Login as Username: admin Password: nasadmin 4. Back up the Server registry (Embedded SMU - this will include the SMU configuration). Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 57: Resetting The Battery Age And Restarting The Chassis Monitor

    Enter the COM port that your serial dongle is using. c. Enter 115200 in the Speed box. d. Click Serial in the Category Tree on the left. e. Make sure the Speed is 115200. Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 58: Collecting A Final Diagnostic

    If the battery is not showing fitted or initialization does not start, call the GCC to open a SR for resolution. Collecting a final diagnostic Collect a final diagnostic as the last step in battery replacement. Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 59: Replacing A Hard Disk

    Use the process described in this section to help ensure that all partitions are recovered before proceeding with any further disk recovery or replacement procedures. Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 60: Replacing A Hard Disk Drive

    Before you consider replacing a hard disk drive, be sure you understand the following points: Do not attempt to replace an HDD unless you are instructed to do so by Hitachi. ■ Failed hard disks are hot-swappable, so a failed hard disk can be replaced without ■...
  • Page 61 Press the retention latch handle towards the chassis to secure the disk in the server. When the disk tray is fully seated, the retention latch handle will click into the closed position. Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 62: Synchronizing A New Disk

    4. Run the chassis-drive-status command, and look at the values in the Status and % Rebuild columns for each device. The values in the Status column should be “Invalid.” ■ The% Rebuild column should not display any values. ■ Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 63: Replacing A Power Supply Unit

    LED indicators on each PSU indicate the PSU status. Figure 21 PSU locations on HNAS 3080 and 3090 rear panel Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 64 The PSU should start as soon as the power connection is made. If the PSU does not start immediately, make sure the mains power circuit is live and that the other end of the power cable is connected to a live outlet. Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 65: Replacing An Fpga Board As A Fru

    Replacing an FPGA board as a FRU Replacing an FPGA board as a FRU Typically, when an FPGA board fails, the whole Hitachi NAS Platform server is replaced. However, in some cases with the HNAS 3080 and 3090 platform models, an FPGA board may be replaced as a field replaceable unit (FRU).
  • Page 66 Looking into the gap, you will see six (6) cables connecting the MFB to the rest of the server. A cable tie is used to secure each cable. Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 67 (see next illustration). 13. Place the labeled cover down on a flat work surface and remove the module from the ESD shielding bag. Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 68 MMB1 Warning: Hardware MFB1 has been replaced (B1004002 -> B0916023) 24. Place the replaced module in the shielding bag and insert it in the original packaging for return to the supplier. Chapter 6: Replacing server components Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 69: Chapter 7: Rebooting, Shutting Down, And Powering Off

    Restart, Reboot and Shutdown page. Note that the page has different options depending on the configuration of your system. Chapter 7: Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 70: Rebooting Or Shutting Down A Cluster

    2. Click the button for the action you want to perform as described next: Chapter 7: Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 71: Restarting An Unresponsive Server

    You can gain access either by using SSH software to connect to the server's CLI or connecting to the server serial port. Procedure 1. Connect to the SMU using the ssh software. Chapter 7: Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 72 20 minutes, because a dump is compiled during the reset process. 5. Check the green LED on the front panel of the server for the server status. Chapter 7: Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 73: Powering Down The Server For Maintenance

    Follow this procedure whenever a server is to be powered down and will be left off for more than a day. If the system is being restarted or power-cycled, this procedure is not required. Chapter 7: Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 74: Powering On The Server Or Cluster

    RAID controller, so the LEDs may continue to blink until after the RAID controller enclosure has sent those commands and the drives have spun up. Chapter 7: Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 75: Recovering From Power Standby

    PWR button on the MFB to restore the power to the system boards. Report this as a problem to Hitachi customer support. c. If the power cables are connected to the PSU, press the PWR (power) button on the rear of the server.
  • Page 76: Appendix A: Server Replacement Procedures

    Note: Replacement servers are shipped without an embedded system management unit (SMU), so you must have a SMU installed before you can connect to a standalone server. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 77: Swapping Components

    The replacement server will have a new MAC ID. The new ID forces the need for new license keys regardless whether it is a single node or complete cluster replacement. As part of a field replacement process, Hitachi recommends that temporary keys be obtained to enable quick delivery and implementation. However, any temporary keys used must eventually be replaced with a permanent key.
  • Page 78: Previous Backups

    Manually installing an embedded SMU (if necessary) HNAS 3080/3090 spare or replacement units are shipped without the embedded SMU installed. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 79: Replacing A Single Server With An Embedded Smu

    Obtaining backups, diagnostics, firmware levels, and license keys On the old server: Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 80 Both the server and SMU firmware versions must match those on the failed server; otherwise, the server cannot properly restore from the backup file. See the release notes and the Hitachi NAS Platform and Hitachi Unified Storage File Module System Installation Guide for release-specific requirements.
  • Page 81: Shutting Down The Server You Are Replacing

    LED starts flashing. The battery disables when you release the reset button. 4. Use the following rear panel figure and table to identify and label the cabling placement on the existing server. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 82 10/100 Private management network Ethernet port 10/100 Private management network Ethernet port 10/100 Private management network Ethernet port Storage or FC switch Storage or FC switch Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 83: Configuring The Replacement Server

    This step allows the SMU to recognize the server as the same and allows it to be managed. Reconfigured settings: IP addresses for Ethernet ports 0 and 1 ■ Gateway ■ Domain name ■ Host name ■ On the replacement server: Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 84 9. Click Yes, and log in as admin (default password: nasadmin). 10. Verify and, if necessary, convert the new server to the model profile required. This step requires a separate process, training, and license keys. Contact Hitachi if the incorrect model arrives for replacement.
  • Page 85: Finalizing And Verifying The Replacement Server Configuration

    3. Use fc-link-speed to verify and, if necessary, configure the FC port speed as required.; for example: a. Enter fc-link-speed to display the current settings. host:$ fc-link-speed FC 1: 4 Gbps FC 2: 4 Gbps Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 86 The UUID is written into the storage pool’s configuration on disk (COD). The COD is a data structure stored in every SD, which provides information how the different SDs are combined into different stripesets and storage pools. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 87: Replacing A Single Server With An External Smu

    1. If the server is online, using NAS Manager, navigate to Home > Server Settings > Configuration Backup & Restore, click backup, and then select a location to save the backup file. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 88 5. Record the following information: IP addresses for Ethernet ports 0 and 1 ■ Gateway ■ Domain name ■ Host name ■ Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 89: Shutting Down The Server You Are Replacing

    LED starts flashing. The battery disables when you release the reset button. 4. Use the following rear panel figure and table to identify and label the cabling placement on the existing server. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 90 10/100 Private management network Ethernet port 10/100 Private management network Ethernet port 10/100 Private management network Ethernet port Storage or FC switch Storage or FC switch Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 91: Configuring The Replacement Server

    This step allows the SMU to recognize the server as the same and allows it to be managed. Reconfigured settings: IP addresses for Ethernet ports 0 and 1 ■ Gateway ■ Domain name ■ Host name ■ On the replacement server: Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 92 10. Verify and, if necessary, convert the new server to the model profile required. This step requires a separate process, training, and license keys. Contact Hitachi Support Connect if the incorrect model arrives for replacement. 11. Navigate to Home > Server Settings > Firmware Package Management to verify and, if necessary, upgrade the new server to the latest SU release.
  • Page 93: Finalizing And Verifying The Replacement Server Configuration

    2. Remove the previous license keys in the backup file, and add the new keys. 3. Use fc-link-speed to verify and, if necessary, configure the FC port speed as required.; for example: Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 94 9. Enter sd-list to verify the system drives statuses as OK and access is allowed. 10. Enter span-list to verify the storage pools (spans) are accessible. Note: In this instance, cluster is synonymous with the standalone server. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 95: Replacing A Node Within A Cluster

    1. Use the table below to record the information of the node to be replaced. This table will help you later during the node replacement process, by providing all the needed information. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 96: Preparing The New Node

    4. Ensure that the new node boots, and that you can connect to it via SSH and login to BALI. 5. Use the CLI hport-wwn command to get the WWN information for the new node. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 97: Preparing The Old Node For Removal

    Preparing the node, step 5. 5. Add the new node as a managed server on the SMU. 6. From the drop down in the SMU, select the existing Cluster. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 98: Finalizing And Verifying The Server Configuration

    2. Navigate to Home > Server Settings > Cluster Configuration to verify the cluster configuration status. Ensure that the cluster is shown as Online and Robust and has the correct number of nodes. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 99 1560 FSS_AMS200 1560 4. If EVS mapping or balancing is required, select the EVS to migrate, assign it to the preferred node, and then click migrate. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 100 6. Select the node from the Preferred Cluster Node list, and then click apply. 7. Navigate to Home > Status & Monitoring > Event Logs, and then click Clear Event Logs. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 101: Replacing All Servers Within A Cluster

    SMU and server configuration files in one complete set. 2. Navigate to Home > Status & Monitoring > Diagnostics download to download the diagnostic test results. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 102 4. Navigate to Home > Server Settings > IP Addresses to obtain: Admin IP address and name ■ Cluster node IP address ■ The evs list command also displays these IP addresses. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 103: Shutting Down The Servers You Are Replacing

    Figure 25 Rear view of server - HNAS 3080 and 3090 models Item Labels Ports Connections 10 GbE data network 10 GbE data network Gigabit Ethernet network port Gigabit Ethernet network port Gigabit Ethernet network port Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 104 10. Insert the new server into the rack, and connect the power cords to the power supplies. Note: Do not make any other cable connections at this time. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 105: Configuring The Replacement Servers

    9. Click Yes to proceed past Security Alert, and log in as admin (default password: nasadmin). 10. Verify and, if necessary, convert the new server to the model profile required. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 106: Finalizing And Verifying The System Configuration

    Finalizing and verifying the system configuration This step requires a separate process, training, and license keys. Contact Hitachi if the incorrect model arrives for replacement. 11. Navigate to Home > Server Settings > Firmware Package Management to verify and, if necessary, upgrade the new server to the latest SU release.
  • Page 107 Features such as replication and data migration should all be confirmed as working, and all file systems and storage pools should be online. Appendix A: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 108: Appendix B: Parts List For 3080/3090 G2 Servers

    M2SEKW13 or higher SX325097 MK1 Battery Module (each) SX325098 Fan Tray ea (Fan ID: 3) Can also use SX325116 SX325099 Hard Disk ea (500GB) Appendix B: Parts list for 3080/3090 G2 servers Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 109 Can use part number 222-2257 2824 Switch (24 Ports, GigE) XBR-VDX6730-16-R Brocade VDX 6730 10GbE Switch, 16 Ports SFP+, AC, Port Side Exhaust AF Appendix B: Parts list for 3080/3090 G2 servers Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 110 10GE passive twinax, Cluster & 10GbE, 1 meter, RoHS 6 SX222097 Copper cable - SFP+ 10GE passive twinax, Cluster & 10GbE, 3 meters, RoHS 6 Appendix B: Parts list for 3080/3090 G2 servers Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 111 Multi-source XFP Subsitute part number FTLX1411D3 10Gbps; Single Mode 1310nm; LC 3.3v FTLX1411D3 XFP - 10G LWL 10km Can use FTLX1412D3BCL Finisar 1-Pk Appendix B: Parts list for 3080/3090 G2 servers Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference...
  • Page 112 Hitachi Corporate Headquarters Regional Contact Information 2845 Lafayette Street Americas: +1 866 374 5822 or [email protected] Santa Clara, CA 95050-2639 USA Europe, Middle East, and Africa: +44 (0) 1753 618000 or info@[email protected] www.HitachiVantara.com | community.HitachiVantara.com Asia Pacific: + 852 3189 7900 or [email protected]...

This manual is also suitable for:

3080 g23080

Table of Contents