Summary of Contents for Hitachi 3080 G1

  • Page 1 Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference Release 13.0 MK-92HNAS016-10 October 2016...
  • Page 2 Hitachi, Ltd., or Hitachi (collectively “Hitachi”). Licensee may make copies of the Materials provided that any such copy is: (i) created as an essential step in utilization of the Software as licensed and is used in no other manner; or (ii) used for archival purposes.
  • Page 3: Table Of Contents

    Radio Protection for Germany................. 26 Food and Drug Administration (FDA)............... 26 Chinese RoHS Compliance Statement..............26 4 System overview................29 System components....................30 Server specifications....................31 Attaching a rack stabilizer plate................32 Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 4 Restarting an unresponsive server................72 Powering down the server for maintenance..............73 Powering down the server for shipment or storage........... 74 Recovering from power standby................75 8 Hard disk replacement..............77 Intended Audience....................79 Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 5 Obtaining backups, diagnostics, firmware levels, and license keys...... 127 Shutting down the servers you are replacing.............128 Configuring the replacement servers..............129 Finalizing and verifying the system configuration..........131 B Parts list for 3080/3090 G1 servers..........133 Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 6 Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 7: Preface

    Preface This manual provides an overview of the Hitachi NAS Platform and the Hitachi Unified Storage File Module hardware. The manual explains how to install and configure the hardware and software, and how to replace faulty components. The following server models are covered: 3080 and 3090.
  • Page 8 • Backup Administration Guide (MK-92HNAS007)—Provides information about configuring the server to work with NDMP, and making and managing NDMP backups. Note: For a complete list of Hitachi NAS open source software copyrights and licenses, see the System Access Guide. Hardware References •...
  • Page 9 The practices outlined in this document describe how to configure the system to achieve the best results • Hitachi NAS Platform Best Practices Guide for NFS with VMware vSphere (MK-92HNAS028)—This document covers best practices specific to using VMware vSphere with the Hitachi NAS platform.
  • Page 10: Accessing Product Documentation

    Getting help Hitachi Support Connect is the destination for technical support of products and solutions sold by Hitachi. To contact technical support, log on to Hitachi Support Connect for contact information: https://support.hds.com/en_us/ contact-us.html.
  • Page 11 Thank you! Preface Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 12 Preface Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 13: About This Manual

    About this manual This manual provides an overview of the NAS Platform and the Hitachi Unified Storage File Module hardware. The manual explains how to install and configure the hardware and software, and how to replace faulty components. The following server models are covered: 3080 and 3090.
  • Page 14: Audience

    A tip contains supplementary information that is useful in completing a task. A note contains information that helps to install or operate the system effectively. About this manual Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 15 Se le aconseja leer, y entender en su totalidad, cualquier procedimiento marcado con estos iconos antes de proceder. Sugerencia: Una sugerencia indica información adicional que puede serle de utilidad en la finalización de una tarea. About this manual Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 16 We raden u aan alle procedure-informatie die door deze pictogrammen wordt gemarkeerd, aandachtig te lezen en ervoor te zorgen dat u de betreffende procedure goed begrijpt vóór u verder gaat. About this manual Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 17 FÖRSIKT: “Försikt” anger vad som kan leda till data eller utrustningsskador. Fortsätt inte till nästa avsnitt innan du förstår det steg som har markerats med detta meddelande. VARNING: “Varning” anger vad som kan leda till personskador. About this manual Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 18 About this manual Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 19: Safety Information

    This section lists important safety guidelines to follow when working with the equipment. Electrostatic discharge precautions □ Safety and handling precautions □ Electrical precautions □ Data protection precautions □ Safety information Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 20: Electrostatic Discharge Precautions

    Once the bottom half of the storage cabinet has been filled, the top half of the storage cabinet can be filled. Begin by placing a storage component directly above the server and then fill upwards. Safety information Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 21: Electrical Precautions

    • Unplug a system component if it needs to be moved or if it is damaged. Note: For additional data protection, Hitachi recommends that you use an external UPS to power the server. Also, each of the...
  • Page 22 To ensure proper operation of the server and the storage subsystems, use only the approved replacement parts for each system. Contact the Hitachi Data Systems Support Center for technical details about replacement parts.
  • Page 23: Mandatory Regulations

    □ European Union (EU) Statement □ Canadian Department of Communication Compliance Statement □ Radio Protection for Germany □ Food and Drug Administration (FDA) □ Chinese RoHS Compliance Statement □ Mandatory regulations Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 24: International Standards

    Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. Neither the provider nor the manufacturer is Mandatory regulations Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 25: European Union (Eu) Statement

    Caution: This is a Class A product and as such, in a domestic environment, might cause radio interference. Canadian Department of Communication Compliance Statement This Class A digital apparatus meets all the requirements of the Canadian Interference - Causing Equipment Regulations. Mandatory regulations Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 26: Avis De Conformité Aux Normes Du Ministère Des Communications Du Canada

    Dieses Gerät erfüllt die Bedingungen der EN 55022 Klasse A. Food and Drug Administration (FDA) The product complies with FDA 21 CFR 1040.10 and 1040.11 regulations, which govern the safe use of lasers. Chinese RoHS Compliance Statement Mandatory regulations Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 27 Mandatory regulations Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 28 Mandatory regulations Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 29: System Overview

    System overview This chapter describes the components in the Hitachi NAS Platform server system for the following models: • Hitachi NAS Platform, Model 3080 • Hitachi NAS Platform, Model 3090 System components □ Server specifications □ Attaching a rack stabilizer plate □...
  • Page 30: System Components

    In some cases, multiple SMUs are advisable. Storage A Hitachi NAS Platform or Hitachi Unified Storage File Module system can subsystems control several storage enclosures. The maximum number of storage enclosures in a rack depends on the model of storage enclosures being installed. Refer to the Storage Subsystem Administration Guide for more information on supported storage subsystems.
  • Page 31: Server Specifications

    Hitachi Data Systems requires dual 10 GbE switches for redundancy. In a dual- switch configuration, if one switch fails, the cluster nodes remain connected through the second switch.
  • Page 32: Attaching A Rack Stabilizer Plate

    Attaching a rack stabilizer plate A rack stabilizer plate and mounting hardware are supplied with some system configurations. Hitachi Data Systems recommends that you always use the stabilizer plate when provided. Use of a stabilizer plate is required for those installations with dense trays.
  • Page 33: Hitachi Nas Platform Server Components

    This section describes the components included in the server chassis. A Hitachi Unified Storage File Module system can contain single Hitachi NAS Platform server or several servers that operate as a cluster. Clusters of more than two servers include two 10 Gbps Ethernet switches. Hitachi Data Systems only requires two switches for redundancy.
  • Page 34: Introducing The Hitachi Nas Platform

    Introducing the Hitachi NAS Platform This section introduces you to the Hitachi NAS Platform or the system and server. A Hitachi NAS Platform chassis is 3U (5.25 inches) high, 480 millimeters (19 inches) wide, rack mountable, and a maximum of 686 millimeters (27 inches) deep, excluding the fascia.
  • Page 35 The server needs attention, and a non-critical failure has been detected, for (once every .8 example, a fan or power supply has failed. Flashes once every .8 seconds. seconds) Normal operation. Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 36: Nvram Backup Battery Pack

    72 hours, or if a server is left unpowered for a long period of time. If the battery pack is fully discharged: Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 37: Server Rear Panel

    To replace the NVRAM battery backup pack, see Replacing the NVRAM backup battery pack on page Server rear panel The rear panel of the server features numerous ports, connectors, switches, and LEDs. Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 38 PSU 1 to Fault group A • PSU 2 to Fault group B PSU 2 I/O ports Keyboard (purple) and mouse (green) ports. (Reserved for Customer Service Engineer access only.) Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 39: Rear Panel Server Led And Button Locations

    NVRAM is currently being protected by battery backup power. The way an LED flashes provides further information about what is currently occurring. Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 40: Power Button (Pwr)

    Under normal circumstances, the power button is rarely used. However, the power button can be used to restore power to the system when the server is in a standby power state. Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 41: Reset Button (Rst)

    If, after 10 seconds, the LEDs on the power supplies are lit, but the Power Status LED is not lit, press the PWR button to restore power to the system. Open a case with the Hitachi Data Systems Support Center to get the problem resolved.
  • Page 42: 10 Gigabit Ethernet Customer Data Network Ports

    GbE ports use enhanced small form factor pluggable (SFP+) optical connectors. Note: The 10 GbE customer data network ports cannot be used to interconnect cluster nodes. Figure 5 10 GbE customer data network ports label Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 43: Ge Ethernet Network Ports

    No network activity 10/100 private Ethernet ports The 10/100 Private Ethernet Network ports function as an unmanaged switch for the private management network (refer to the Network Administration Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 44: Fibre Channel Storage Ports

    The part number is located on the side of the port housing and is only visible when the port is removed. Part number prefixes are different as follows: • 10 GbE: FTLX • FC: FTLF Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 45: Serial Port

    PSU. LED indicators provide PSU status information for the state of the PSU. Figure 9 Power supply unit details Item Description PSU fan exhaust Power cord connector Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 46 Mains power connections are an IEC inlet in each power supply. Each PSU is only powered from its mains inlet. Two power feeds are required for the Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 47: 10/100/1000 Ethernet Management Ports

    Valid operations include: • Management • Install • Upgrade • Update • Repair Note: The USB ports should not be used without guidance from customer support. Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 48: Management Interfaces

    SMU and use SSH to access the server's CLI. If your system does not include an external SMU, connect to the server’s internal SMU and use SSH to access the server's CLI. Hitachi NAS Platform server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 49: Replacing Server Components

    Removing and replacing the front bezel □ Bezel removal □ Replacing a fan □ Replacing the NVRAM backup battery pack □ Replacing a hard disk □ Replacing a power supply unit □ Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 50: Removing And Replacing The Front Bezel

    The storage system administrator is responsible for ensuring that the ambient temperature within the rack does not exceed the 35°C operating limit. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 51 • Align the fan lead and its protective sleeve in the space allotted for it on the bottom right side of the fan assembly mounting area. • Fit the fan assembly between the left and right mounting guides. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 52: Replacing The Nvram Backup Battery Pack

    Prepare the new battery. Separate the battery pack from the caddy (module case). Procedure Loosen thumbscrew on the rear of the caddy (the side with the electrical connector). Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 53 Disconnect the battery from the caddy by pressing down on the retention clip that holds the connector together and then separating the connector. The metal portion of the module can be returned to the supplier or be discarded. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 54: Removing The Battery Pack: Type 1 Chassis

    Gently slide the old battery pack out of the server. Disconnect the battery: a. Carefully push in on the retention clip. b. Carefully pull the connector away from the socket. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 55: Inserting The New Battery Pack: Type 1 Chassis

    Plug the connector in before inserting the new battery pack. The connector plug must be positioned so that the retention clip is on the left side before pushing it in as shown. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 56 Do not force the plug in. When correctly aligned, it will slide in easily. Carefully insert the battery pack. Ensure that the print is facing left and the cable is on the bottom. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 57: Removing The Battery Pack: Type 2 Chassis

    Check the battery connector to make sure the batter is plugged in correctly. Go to Collecting system backups and diagnostics on page Removing the battery pack: type 2 chassis Remove the NVRAM battery backup pack (type 2, bracket). Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 58 Prepare the new battery. See Removing the battery pack from the caddy on page Remove the fascia. Disconnect the battery connector, located on the right side of the battery compartment. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 59 Note: Disconnect the battery pack by grasping the battery pack connector; do not pull on the wires. Remove the battery retention bracket. Gently remove the old battery pack from the compartment. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 60: Inserting The New Battery Pack: Type 2 Chassis

    Insert the battery pack with the connector cable on the bottom and the printing on the left side. Note: Do not connect the battery connector yet. Fit the left-side of the battery retention bracket into the slot. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 61 Before proceeding to the next step, make sure that the clip is on the left. To connect the battery: a. Position the battery connector so that the retention clip is on the left side. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 62: Collecting System Backups And Diagnostics

    Back up the Server registry (Internal SMU - this will include the SMU configuration). a. Navigate to Home > Server Settings > Configuration Backup and Restore. b. Click Backup. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 63: Resetting The Battery Age And Restarting The Chassis Monitor

    Enter the COM port that your serial dongle is using. c. Enter 115200 in the Speed box. d. Click Serial in the Category Tree on the left. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 64: Collecting A Final Diagnostic

    If the battery is not showing fitted or initialization does not start, call the GCC to open a SR for resolution. Collecting a final diagnostic Collect a final diagnostic as the last step in battery replacement. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 65: Replacing A Hard Disk

    Procedure Make sure you have the new hard disk(s) present. Shut down the server (see Rebooting or shutting down a cluster on page 71 for more information). Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 66 In either of the cases described above, you must remove and reuse the four (4) TORX10 mounting screws that hold the hard disk in the carrier before mounting/ remounting the hard disk. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 67: Replacing A Power Supply Unit

    PSU means that there is no redundancy in that area, increasing the risk of an interruption in service to clients. LED indicators on each PSU indicate the PSU status. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 68 PSU does not start immediately, make sure the mains power circuit is live and that the other end of the power cable is connected to a live outlet. Replacing server components Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 69: Rebooting, Shutting Down, And Powering Off

    Restarting an unresponsive server □ Powering down the server for maintenance □ Powering down the server for shipment or storage □ Recovering from power standby □ Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 70: Rebooting Or Shutting Down A Server

    Note that rebooting may take up to five minutes. • Click Shutdown to stop file serving EVSs on the server, and then shut down and power off the server. Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 71: Rebooting Or Shutting Down A Cluster

    Clicking Reboot stops all file serving EVSs on the selected node or all cluster nodes, then reboots the node/nodes. Rebooting may take up to five minutes. Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 72: Restarting An Unresponsive Server

    If you are still unable to get to the server OS, perform the following steps: Check to make sure that the Bali CLI is booting successfully. Log in through the serial cable connection. Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 73: Powering Down The Server For Maintenance

    (an internal SMU is turned off when the server shuts down). Power off the storage subsystems, beginning with the enclosures that house the RAID controllers. Power off the expansion enclosures for the storage subsystems. Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 74: Powering Down The Server For Shipment Or Storage

    Release the reset button to disable the battery. The NVRAM Status LED goes out. Note: The NVRAM contents are lost. The battery is re-enabled when power is restored to the server. Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 75: Recovering From Power Standby

    • Pressing the PWR button. • Remove the power cables from both PSUs, wait for 10 seconds, then reconnect the cables to the PSUs. Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 76 Rebooting, shutting down, and powering off Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 77: Hard Disk Replacement

    Step 5: Save the preferred mapping and migrate EVSs (cluster node only) □ Step 6: Replacing a Server’s Internal Hard Disk □ Step 7: Synchronizing server’s new disk □ Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 78 Step 8: Replacing the server’s second disk □ Step 9: Synchronizing the second new disk □ Step 10: Restore EVSs (cluster node only) □ Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 79: Intended Audience

    Intended Audience These instructions are intended for Hitachi field personnel, and appropriately trained authorized third-party service providers. To perform this procedure, you must be able to: • Use a terminal emulator to access the HNAS server CLI and Bali console.
  • Page 80: Requirements For Hard Disk Replacement

    Health Check” on page 55 for more information. The hard disk replacement process is as follows: Procedure Perform a health check: See Step1: Performing an Internal Drive Health Check on page 83 for more information. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 81: Accessing Linux On The Server And Node

    Use the terminal emulator and null modem cable to access the NAS server’s Linux operating system. Procedure Configure the terminal emulator as follows: • Speed: 115200 • Data bits: 8 bits • Parity: None • Stop bits: 1 Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 82: Using Ssh For An Internal Smu

    Using SSH for an Internal SMU on page Procedure SSH into the external SMU as manager. Enter the following command: ssh manager@[IP Address] where [IP Address] is the IP address of the NAS server/node. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 83: Step1: Performing An Internal Drive Health Check

    If both disks have errors, contact technical support and escalate the errors based on the health check output. To run the health check: Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 84 In the sample output from the smartctl command below, the portion of the information that indicates SMART support is underlined: === START OF INFORMATION SECTION === Device Model: ST9250610NS Serial Number: 9XE00JL3 Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 85 Error logging capability: (0x01) Error logging supported. General Purpose Logging supported. Short self-test routine recommended polling time: 1) minutes. Extended self-test routine recommended polling time: 49) minutes. Conveyance self-test routine Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 86 Old_age Always 194 Temperature_Celsius 0x0022 Old_age Always 26 (0 20 0 0) 195 Hardware_ECC_Recovered 0x001a Old_age Always 102792136 197 Current_Pending_Sector 0x0012 Old_age Always 198 Offline_Uncorrectable 0x0010 Old_age Offline Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 87 7823552 blocks [2/2] [UU] bitmap: 1/1 pages [4KB], 65536KB chunk md2 : active raid1 sda3[0] sdb3[1] 7823552 blocks [2/2] [UU] bitmap: 0/1 pages [0KB], 65536KB chunk unused devices: Group5-node1:~# Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 88: Step 2: Gathering Information About The Server Or Node

    Record the IP Address of the system you choose. Run the evs list command. • For a single-node cluster or a standalone server, record the administrative services EVS IP address. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 89 Step1: Performing an Internal Drive Health Check on page • If the values are not correct, run the trouble chassis-drive command. If the command response displays “No found,” repeat the health check, as faults Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 90: Step 3: Backing Up The Server Configuration

    X is the number of cluster node (the pnode-id) to identify. The result of this command is that the server’s fault and power LEDs (located on the left side of the server’s rear panel) flash simultaneously. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 91: Step 5: Save The Preferred Mapping And Migrate Evss (Cluster Node Only)

    Navigate to Home > Server Settings > EVS Migration to display the EVS Migration page. Note: If the SMU is currently managing a cluster and at least one other cluster or standalone server, the following page appears: Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 92 EVS Mappings section. Migrate EVSs as required: • To migrate all EVSs between cluster nodes: a. Select Migrate all EVS from cluster node ___ to cluster node ___. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 93: Step 6: Replacing A Server's Internal Hard Disk

    • For a standalone server, navigate to Home > Restart, Reboot or Shutdown Server > Shutdown. • Using the CLI, shut down the server using the following command: shutdown –-powerdown –-ship -f Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 94 Step 7: Synchronizing server’s new disk on page 100 for more information. Disconnect the fan power connector by pressing down on the connector’s retention latch and gently pulling the connector apart. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 95 Remove the fan assembly covering the disk you want to replace. When replacing hard disk B, remove fan assembly 2 (the center fan assembly). Hard disk B should now be visible. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 96 Note: The carrier used for replacement hard disks may be different than the carrier holding the old hard disks. The new carriers fit into the same place and in the same way as the older carriers. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 97 Disconnect the power and SATA cables from the hard disk. Loosen the thumbscrew on the right side of the hard disk carrier. Note that the thumbscrew cannot be removed from the carrier. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 98 To install the replacement hard disk, lift the right side of the carrier until you can insert the tabs on the left side of the disk carrier into the slots on the floor of the server chassis. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 99 Connect the power and SATA cables to the replacement hard disk. Reinstall the fan in the mounting slot, with the cable routed through the chassis cut-out. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 100: Step 7: Synchronizing Server's New Disk

    The values in the Status column should be: • “Good” for synchronized volumes. • “Rebuilding” for the volume currently being synchronized. • “Degraded” for any volume(s) that have not yet started the synchronization process. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 101: Step 8: Replacing The Server's Second Disk

    Log into Web Manager as user manager. By default, the password is nasadmin but this password may have been changed. Navigate to Home > Server Settings > EVS Migration to display the EVS Migration page. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 102 EVSs (cluster node only) on page 91, click Migrate all to preferred in the EVS Mappings section. • If the preferred mapping was not saved, migrate EVSs as required: Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 103 From the first drop-down list, select the cluster node to migrate. c. From the second drop-down list, select the cluster node to which the EVS will be migrated. d. Click Migrate. Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 104 Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 105: Server Replacement Procedures

    Replacing a single server with an embedded SMU □ Replacing a single server with an external SMU □ Replacing a node within a cluster □ Replacing all servers within a cluster □ Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 106: Replacement Procedure Overview

    There are a minimum of four parts to be reused in the replacement server. The components that can be swapped include: • Battery • Bezel • Rack mounting guides Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 107: Model Selection

    As part of a field replacement process, Hitachi Data Systems recommends that temporary keys be obtained to enable quick delivery and implementation. However, any temporary keys used must eventually be replaced with a permanent key.
  • Page 108: Upgrades

    If this circumstance is encountered, call the support organization for a copy of the system's latest diagnostics files. If available, these files can be used as a guide in reestablishing the system Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 109: Obtaining Backups, Diagnostics, Firmware Levels, And License Keys

    SMU and server configuration files in one complete set. Navigate to Home > Status & Monitoring > Diagnostics download to download the diagnostic test results. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 110 Both the server and SMU firmware versions must match those on the failed server; otherwise, the server cannot properly restore from the backup file. See the release notes and the Hitachi NAS Platform and Hitachi Unified Storage File Module System Installation Guide for release- specific requirements.
  • Page 111: Shutting Down The Server You Are Replacing

    Servers shipped from the factory have not yet had the nas-preconfig script run on them, so a replacement server will not have any IP addresses pre- configured for your use. You need IP addresses for the following: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 112 Verify and, if necessary, convert the new server to the model profile required. This step requires a separate process, training, and license keys. Contact Hitachi Data Systems Support Center if the incorrect model arrives for replacement. Navigate to Home > SMU Administration > Upgrade SMU to verify and, if necessary, upgrade the embedded SMU to the latest SMU release.
  • Page 113: Finalizing And Verifying The Replacement Server Configuration

    Navigate to Home > Server Settings > License Keys to load the license keys. Remove the previous license keys in the backup file, and add the new keys. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 114 Permanent license keys for the replacement server are normally provided within 7 days. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 115: Replacing A Single Server With An External Smu

    Ensure you save the backup file to a safe location off platform so that you can access it after the storage system is offline. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 116: Shutting Down The Server You Are Replacing

    LEDs turn off. The PSU and server fans continue to run until you remove the power cables from the PSU module. See the appropriate system component section for more information. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 117: Configuring The Replacement Server

    This step allows the SMU to recognize the server as the same and allows it to be managed. Reconfigured settings: • IP addresses for Ethernet ports 0 and 1 • Gateway • Domain name • Host name Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 118 Verify and, if necessary, convert the new server to the model profile required. This step requires a separate process, training, and license keys. Contact Hitachi Data Systems Support Center if the incorrect model arrives for replacement. Navigate to Home > Server Settings > Firmware Package Management to verify and, if necessary, upgrade the new server to the latest SU release.
  • Page 119: Finalizing And Verifying The Replacement Server Configuration

    Note: The following steps show the FC link speed as 8 Gbps as an example. Procedure Navigate to Home > Server Settings > License Keys to load the license keys. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 120 Navigate to Home > Status & Monitoring > System Monitor and verify the server status: • If the server is operating normally, and is not displaying any alarm conditions, run a backup to capture the revised configuration, and Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 121: Replacing A Node Within A Cluster

    ETH0 Subnet Mask ETH1 IP Address (if applicable) WWN-Port 1 WWN-Port 2 WWN-Port 3 WWN-Port 4 How is the current node connected to the storage? Direct Connected SAN Connected Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 122: Preparing The New Node

    Shut down the node. Once the node is shut down, go to Home > Server Settings > Cluster Configuration and delete the entry for the node that you are replacing. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 123: Installing The New Node

    Finalizing and verifying the server configuration On the new server: Procedure Navigate to Home > Status & Monitoring > System Monitor to verify the server status: Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 124 Online and Robust and has the correct number of nodes. Use CLI to verify that the new node has access to the System Drives. Use sd-list from the node that you have just replaced. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 125 To set the preferred node for any remaining EVSs, navigate to Home > Server Settings > EVS Management > EVS Details. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 126: Replacing All Servers Within A Cluster

    Important: Set expectations up front with the customer that this will delay time to recovery, and that some aspects of the systems configuration might never be recovered. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 127: Obtaining Backups, Diagnostics, Firmware Levels, And License Keys

    Select the devices for which diagnostics are required by checking the appropriate boxes. Then click download. Navigate to Home > Server Settings > Firmware Package Management to verify the existing server (SU) firmware release level. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 128: Shutting Down The Servers You Are Replacing

    PSU module. See the appropriate system component section for more information. Note: This specific powerdown command prepares the system for both shipping, and potential long-term, post-replacement storage. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 129: Configuring The Replacement Servers

    On a replacement server: Procedure Log in to the server. Run the nas-preconfig script. The IP addresses are assigned at this step. Reboot if you are instructed to by the script. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 130 Verify and, if necessary, convert the new server to the model profile required. This step requires a separate process, training, and license keys. Contact Hitachi Data Systems Support Center if the incorrect model arrives for replacement. Navigate to Home > Server Settings > Firmware Package Management to verify and, if necessary, upgrade the new server to the latest SU release.
  • Page 131: Finalizing And Verifying The System Configuration

    Features such as replication and data migration should all be confirmed as working, and all file systems and storage pools should be online. Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 132 Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 133: B Parts List For 3080/3090 G1 Servers

    EMEA units start with a S/N starting with M2SEKW13 or higher SX345278 System Management Unit • Required for Cluster (current) • Can use SX325121 300 (SMU300) Parts list for 3080/3090 G1 servers Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 134 Brocade VDX 6730 80MM Fan assy, Non Port Side Exhaust SX222096 Copper cable - SFP+ 10GE passive twinax, Cluster & 10GbE, 1 meter, RoHS 6 Parts list for 3080/3090 G1 servers Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 135 FTLX8511D3 FTLX1412D3BCL Multi-source XFP 10Gbps; Subsitute part number FTLX1411D3 Single Mode 1310nm; LC 3.3v FTLX1411D3 XFP - 10G LWL 10km Can use FTLX1412D3BCL Finisar 1-Pk Parts list for 3080/3090 G1 servers Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 136 Parts list for 3080/3090 G1 servers Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 137 Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference...
  • Page 138 Hitachi Data Systems Corporate Headquarters 2845 Lafayette Street Santa Clara, California 95050-2639 U.S.A. www.hds.com Regional Contact Information Americas +1 408 970 1000 [email protected] Europe, Middle East, and Africa +44 (0) 1753 618000 [email protected] Asia Pacific +852 3189 7900 [email protected] MK-92HNAS016-10...

This manual is also suitable for:

3090 g1

Table of Contents