ABB i-bus BDB/S 1.1 Product Manual
ABB i-bus BDB/S 1.1 Product Manual

ABB i-bus BDB/S 1.1 Product Manual

Eib / knx data logging unit

Quick Links

®
Product Manual
ABB i-bus
EIB / KNX
Data Logging Unit
BDB/S 1.1
Intelligent Installation Systems
ABB
Table of Contents
loading

Summary of Contents for ABB i-bus BDB/S 1.1

  • Page 1 ® Product Manual ABB i-bus EIB / KNX Data Logging Unit BDB/S 1.1 Intelligent Installation Systems...
  • Page 2 Despite checking that the contents of this document match the hardware and software, deviations cannot be completely excluded. We therefore cannot accept any liability for this. Any necessary corrections will be inserted in new versions of the manual. Please inform us of any suggested improvements. E-mail: [email protected]...
  • Page 3: Table Of Contents

    Reaction on bus voltage failure ............35 Reaction on bus voltage recovery ............35 Appendix Scope of delivery ................VII Directory of drawings ................ VIII Directory of tables................IX Index ....................X Ordering information ................X Notes....................XII © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 4: General

    (in hours) and counting operations on up to 35 channels. Limit values are defined for the individual counter values which automatically ® initiate an alarm message on the ABB i-bus if they are exceeded. Data logging can be used for example, to co-ordinate the maintenance expenditure and to determine the operational life of different devices.
  • Page 5: Product And Functional Overview

    2 space units. The Data Logging Unit enables you to count the switching operations of ® switch actuator channels in an ABB i-bus system. Furthermore, the operating hours of the connected loads can be recorded with a resolution of up to one second.
  • Page 6: Device Technology

    35 channels. The BDB/S 1.1 is operational after of the bus voltage. The module is programmed directly via ® the application program ETS. The connection to the ABB i-bus established via the bus connection terminal at the front of the device. Fig. 1: BDB/S 1.1...
  • Page 7: Circuit Diagram

    Application program Note: ETS is required for programming. If ETS3 is used a “.VD3” type file must be imported. The application program is available in the ETS under ABB/Safety and Monitoring/Controller. Circuit diagram 2CDC 072 053 F0006 Fig. 2: Circuit diagram...
  • Page 8: Dimension Drawing

    ® Device technology ABB i-bus EIB / KNX Dimension drawing 2CDC 072 051 F0006 Fig. 3: Dimension drawing © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 9: Assembly And Installation

    Commissioning requirements In order to commission the Data Logging Unit, a PC with ETS and a ® connection to the ABB i-bus , e.g. via a RS232 interface or a USB interface is necessary. The device is ready for operation after connection to the bus voltage.
  • Page 10 Corrosive materials or solutions should never be used. Maintenance The device is maintenance-free. No repairs should be carried out by unauthorised personnel if damage occurs (e.g. during transport or storage). The warranty expires if the device is opened. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 11: Commissioning

    Programming requires the EIB Tool Software (ETS). When ETS3 is used the product files with the file extension .VD3 must be imported. Max. number of communication objects Max. number of group addresses Max. number of associations © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 12: Parameters

    Please note that the values which are set to the same values for all channels, when converted individually for each channel they are not transferred to each individual channel. The individual setting must be repeated for each channel. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 13 1…2…255 seconds In order to allow co-ordinated recall of the individual switch positions a pause is set between two recall telegrams. Note: If a switch actuator does not respond, the telegram will be repeated twice. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 14 Option yes = switching operations telegram sent cyclically If the option yes is selected, the following parameters are displayed. Cycle time [1...255 hours] Options: 1…255 hours The cycle time is thus set here. After this time the switching operations telegrams are sent. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 15 Options: 10min/30min/1h/3h/6h/12h/24h The communication object “In operation – System” is sent cyclically on the bus after the set interval. The telegram value is always “1”. This can be used to monitor the Data Logging Unit. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 16: Parameter Window "Channel Designator

    The text which is entered is used to provide help, in order to obtain an overview of the channels when they are fully assigned and to indicate the function assigned to the channel. The text is purely for informative purposes and has no further function. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 17: Channel Parameter Settings "Individual For Each Channel

    The parameters for setting the switching operations become visible by scrolling down using the scroll bar on the right hand side. Channel selection [1…35] Options: Channel 1…Channel 35 With this parameter you define which channels are to be programmed. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 18 If the switch positions are recalled cyclically, ensure that on the recalling device, e.g. a switch actuator channel, the R flag is set in the communication object to be recalled. Otherwise the Data Logging Unit can not recall the switch position. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 19 The limit value can also be modified via the bus. If the limit value is reached the communication object “Channel 1 operating hours - Alarm” sends a “1”. Note: Thereafter counting will continue up to the end value of 100,000. The counter stops at 100,000. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 20 If a start value of 2,500 is set and the new counter value is set to 3,500, the new counter value is automatically corrected to 2,500, as the new counter value can not be greater than the start value. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 21 Option Do not count = the operating hours are not counted, i.e. as soon as the connection to the channel has been established the count will continue. Option Dependent on last switch position = depending on the last communication object value the count will or will not continue. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 22 Connection failures can now only be determined on channels which are cyclically recalled, i.e. reaction only according to the options, otherwise counting continues. When does counting continue? This is dependent of the parameter setting at Count operating hours with switch position. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 23 Option yes = operating hours start value is overwritten Note: Changes of the start value via the bus with a download is not taken into consideration. The parameterised value is set as a start value. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 24: Parameter Window "Channel Parameters

    Option ON -> OFF = a switch operation is counted if switching occurs from an ON telegram to an OFF telegram. Option OFF -> ON = a switch operation is counted if switching occurs from an OFF telegram to an ON telegram. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 25 Option yes = switching operations limit value is overwritten Note: Changes of the limit value via the bus with a download is not taken into consideration. The parameterised value is set as a limit value. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 26 Option yes = switching operations start value is overwritten Note: Changes of the start value via the bus with a download is not taken into consideration. The parameterised value is set as a start value. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 27: Channel Parameter Settings "Same For All Channels

    This indicates in the parameter window General in the parameter Channel parameter settings that the option Same for all channels has been selected. Note: All further parameters can be taken from the description in the chapter channel parameter settings “Individual for each channel”. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 28: Parameter Window "Channel Parameters Page 2 Of 2

    Parameter window “Channel parameters page 2 of 2” Fig. 9: Parameter window “Channel parameters page 2 of 2” Note: The limit descriptions should be taken from the chapter channel parameter settings “Individual for each channel”. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 29: Communication Object

    As soon as the communication object 248 Send all operating data – System receives a “1”, the communication object Channel 1 operating hours – Alarm is sent. Telegram value “1” = limit value reached Telegram value “0” = limit value not reached Table 3: Communication objects channel 1, 0…3 © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 30 As soon as the communication object 248 Send all operating data – System receives a “1”, the communication object Channel 1 switching operations – Alarm is sent. Telegram value “1” = limit value reached Telegram value “0” = limit value not reached Table 4: Communication objects channel 1, 4…6 © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 31: Channel 2

    Object name Data type Flags See communication object Channel 9 … 0…6 Function Object name Data type Flags See communication object Channel 10 … 0…6 etc. etc. etc. Table 5: Communication objects channel 2..35, 6…244 © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 32: General

    Telegram value “1“ = time window active Telegram value “0“ = time window not active Table 6: Communication objects General 245…247 © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 33 This communication object is only active if “yes” has been selected for the parameter Send cyclic “In operation” telegram. As long as the communication object is activated it sends an In operation telegram. Telegram value “1” system in operation Table 7: General communication objects 248 and 249 © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 34: Planning And Application

    4.1.4 Application 4 The Unit can be used for example in a hotel to record the operating life of filters in the air conditioning. A maintenance plan can be created using this data. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 35: Reaction On Bus Voltage Failure

    Reaction on bus voltage failure With bus voltage failure the Data Logging Unit permanently saves the operating hours and switching operations. Reaction on bus voltage recovery Recall of the current counter states and update of the communication objects. © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 36: Appendix

    The Data Logging Unit is supplied with the following parts. Please check the items received using the following list. – 1 pc. BDB/S 1.1 Data Logging Unit, MDRC – 1 pc. installation and operating instructions – 1 pc. bus connection terminal (red/black) © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 37: Directory Of Drawings

    Parameter window “Channel parameters page 1 of 2”...........27 Fig. 9: Parameter window “Channel parameters page 2 of 2”...........28 Fig. 10: Communication objects channel 1, 0…6 ................29 Fig. 11: Communication objects General 245…247..............32 Fig. 12: General communication objects 248 and 249 ..............33 © 2006 ABB STOTZ-KONTAKT GmbH VIII...
  • Page 38: Directory Of Tables

    Table 5: Communication objects channel 2..35, 6…244 ..............31 Table 6: Communication objects General 245…247..............32 Table 7: General communication objects 248 and 249 ..............33 Table 8: Ordering details of the Data Logging Unit, MDRC ............XI © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 39: Index

    Switch operation 24, 25, 30 Limit values 4, 19 Switching operations 24, 25, 26, 30, 32, 33, 34 Maintenance 10 'Total runtime' 23 Operating hours 20, 21, 23, 29 Total value 25 Power supply 6 © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 40: Ordering Information

    40 16779 Price Unit weight Pack unit group 1 pc. [Pcs] [kg] BDB/S 1.1 Data Logging Unit, MDRC 2CDG 110 067 R0011 657 53 2 Table 8: Ordering details of the Data Logging Unit, MDRC © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 41: Notes

    ® Appendix ABB i-bus EIB / KNX Notes © 2006 ABB STOTZ-KONTAKT GmbH...
  • Page 42 ® Appendix ABB i-bus EIB / KNX © 2006 ABB STOTZ-KONTAKT GmbH XIII...
  • Page 43 The information in this leaflet is subject to change without further notice. Your EIB-Partner Your EIB- Partner...

Table of Contents