Installation
96
ATTENTION!
The transmission linkage of the ready-for-service indicator
Lay the cables following the dotted line
Remove the fixing bolts of the front plate.
Remove the front plate of the switchgear to the front.
If the low-voltage niche is used by the customer: Remove four Torx bolts size M6 of
the niche cover and remove the niche cover upwards.
Following the circuit diagrams, connect the wires
directly to equipment terminals (e.g. CAPDIS S2+, short-circuit indicator),
and lay them cleanly. Cables are routed to the outside laterally (arrow) through
a cut-out stopper. Use the wiring duct
Do not switch on auxiliary voltage yet.
13.4

Correcting circuit diagrams

Note any modifications which may have been made during installation or
commissioning in the supplied circuit diagrams.
Send the corrected documentation to the regional Siemens representative so that
the modifications can be included.
Revision 03 * INSTALLATION AND OPERATING INSTRUCTIONS 8DJH * 500-8067.9
s
must move freely.
f
.
f
to the terminal strip
a
as far as possible.
d
or

Hide quick links:

Table of Contents
loading

Table of Contents