文档准备
01
Preparing Documentation
项目Item
参考手册Reference Document
预制模块
《FusionModule1000A20 预制一体化数据中心 V200R003C10 初始配置参数手册》
《FusionModule1000A20 Prefabricated All-in-One Data Center V200R003C10 Initial
Pre-fab.
Module
Configuration Parameter Manual》
《FusionModule1000A20 预制一体化数据中心 V200R003C10 安装指南》
《FusionModule1000A20 Prefabricated All-in-One Data Center V200R003C10
Installation Guide》
《FusionModule1000A20 预制一体化数据中心 V200R003C10维护指南》
《FusionModule1000A20 Prefabricated All-in-One Data Center V200R003C10
Maintenance Guide》
《FusionModule1000A20 预制一体化数据中心 V200R003C10调测指南》
《FusionModule1000A20 Prefabricated All-in-One Data Center V200R003C10
Commissioning Guide》
《TP48200B-N20B2, TP48200B-N20B3, TP48200B-L20B2, TP48400B-N20B3,
AC/DC电
源系统
TP48400B-L20B1 室内电源 安装指南》
AC/DC
《TP48200B-N20B2, TP48200B-N20B3, TP48200B-L20B2, TP48400B-N20B3,
power
TP48400B-L20B1 Indoor Power System Installation Guide》
《TP48600B-N20B1 室内电源 安装指南 》
system
《TP48600B-N20B1 Indoor Power Supply Installation Guide》
《TP482000B V300R002C03 机房电源 安装指南 (TP482000B-N20B1,TP482000B-
N20B2,TP481200B-N20B1,TP481200B-N20B2) 》
《TP482000B V300R002C03 Central Office Power System Installation Guide
(TP482000B-N20B1,TP482000B-N20B2,TP481200B-N20B1 and TP481200B-
N20B2)》
ECC800
《ECC800 数据机房控制器 V100R003C00 用户手册》
《ECC800 Data Center Controller V100R003C00 User Manual》
《(For Customer) iManager NetEco 6000 V600R009C00 设备安装调测指南》
NetEco
(可选
《(For Customer) iManager NetEco 6000 Device Installation and Commissioning
Guide (V600R009C00) 》
optional)
预制模块接地
03
Grounding Pre-fab. Modules
NOTE
安装前请拆除接地排上的锡箔纸。
Before the installation, remove the
接地点前后共两处。
tinfoil from the ground bar.
接地可以采用接地片或者接地线。
There are two ground points: on at
步骤1:预制模块接地。
the front and the other at the rear.
Ground the pre-fab. module using
ground cables or ground lugs.
Step 1 Ground the pre-fab. module.
安装预制模块
02
Installing Pre-fab. Modules
底座安装场景/Base Scenario
单位:mm
Unit: mm
底座 Base
水泥地基
Concrete pad
底座 Base
各混泥土支撑平台之间水平
误差小于5mm。
步骤1:安装预制模块底座。
步骤2:调平底座,保证所有底座高度相同。
步骤3:安装转锁。
步骤4:吊装预制模块。
步骤5:将转锁旋转90°,固定预制模块。
(可选)安装外围附件
04
(Optional) Installing External Accessories
步骤1:安装防雨棚。
Step 1 Install the awning.
步骤2:组装踏步梯。
Step 2 Assemble the step ladder.
步骤3:将踏步梯紧固在地上。
Step 3 Secure the step ladder to the ground.
步骤4:安装外部线架
Step 4 Install the external cable tray.
A 螺母 Nut
B 弹垫 Spring washer
C 平垫 Flat washer
D 木块 Wooden block
转锁Twist lock
The horizontal error between concrete platforms is less than 5 mm.
Step 1 Install the pre-fab. module base.
Step 2 Level the bases to ensure that they are of the same height.
Step 3 Install the twist lock.
Step 4 Hoist the pre-fab. module.
Step 5 Rotate the twist lock by 90 degrees to secure the pre-fab.
module.
混凝土支撑平台场景/Concrete Platform Scenario
底座在生产时已
经在底座纵向、
横向的对称线上
打了钢印。在安
装时,将底座
400mm边平行于
预制模块长度方
向且保证对称线
与所画基准线共
线。
Longitudinal and
latitudinal
symmetric lines
are stamped on
bases in the
factory. When
installing bases,
verify that the 400
mm edges of the
bases are parallel
with the length
direction of pre-
fab. modules, and
The horizontal error between concrete
that the
各混泥土支撑平台之
platforms is less than 5 mm.
symmetrical lines
间水平误差小于5mm。
Step 1 Hoist the pre-fab. module.
are aligned with
步骤1:吊装预制模块。
Step 2 Secure the pre-fab. module using
the reference
步骤2:用角钢固定预制模块。
angle steel brackets.
lines.
拆除运输防护装置
05
Removing Transport Protection Materials
感烟探测器 Smoke detector
防松胶布
Securing tape
红色外罩
Red cover
器件
需拆卸防护装置
Device
Protection Materials to Be Removed
空热一体机
运输防护盖板
Intelligent heat exchanger
Transportation protective cover
新风一体机
压缩机固定片
Fresh air integrated unit
Compressor fixing plate
感烟探测器
防松胶布、红色外罩
Smoke detector
Securing tape and red cover
感温探测器
防松胶布、红色外罩Securing tape and
Temperature detector
red cover
声光报警器
防松胶布
Horn strobe
Securing tape
消防警铃
防松胶布
Fire alarm bell
Securing tape
应急灯
防松胶布
Emergency light
Securing tape
温湿度传感器
防松胶布
Temperature and humidity sensor
Securing tape
摄像机
防松胶布
Camera
Securing tape
Copyright © Huawei Technologies Co., Ltd. 2020. All rights reserved
02
混泥土支撑平台
Concrete platform
版权所有 © 华为技术有限公司2020。保留一切权利。
.
loading

Summary of Contents for Huawei FusionModule1000A20

  • Page 1 FusionModule1000A20 预制一体化数据中心 V200R003C10快速安装指南 FusionModule1000A20 Prefabricated All-in-One Data Center V200R003C10 Quick Installation Guide 安装预制模块 文档准备 Installing Pre-fab. Modules Preparing Documentation 底座安装场景/Base Scenario 混凝土支撑平台场景/Concrete Platform Scenario 项目Item 参考手册Reference Document 单位:mm 底座在生产时已 Unit: mm 预制模块 《FusionModule1000A20 预制一体化数据中心 V200R003C10 初始配置参数手册》 经在底座纵向、 《FusionModule1000A20 Prefabricated All-in-One Data Center V200R003C10 Initial Pre-fab.
  • Page 2 FusionModule1000A20 预制一体化数据中心 V200R003C10快速安装指南 FusionModule1000A20 Prefabricated All-in-One Data Center V200R003C10 Quick Installation Guide 拆除运输防护装置 (可选)安装新风一体机 Removing Transport Protection Materials (Optional) Installing the Fresh Air Integrated Unit 空调八个角都有定位吊耳方便吊装。 NOTE The eight corners of the air conditioner have positioning lugs (1)出风口盖板 installed for easy hoisting.
  • Page 3 FusionModule1000A20 预制一体化数据中心 V200R003C10快速安装指南 FusionModule1000A20 Prefabricated All-in-One Data Center V200R003C10 Quick Installation Guide (可选)安装监控设备 安装消防设备 (Optional) Installing Monitoring Devices Installing Fire Extinguishing Devices 消防气瓶的电磁阀需要调测完成后再 Commission the electrical actuator on the fire cylinder 步骤1:将4G天线安装在预制模块馈线窗顶部 Step 1 Install the 4G antenna at the top of the feeder window on the pre- 步骤4:安装Pad。...
  • Page 4 FusionModule1000A20 预制一体化数据中心 V200R003C10快速安装指南 FusionModule1000A20 Prefabricated All-in-One Data Center V200R003C10 Quick Installation Guide 安装消防设备 上电前检查 、上电调测 Installing Checking Before Power-On and Performing Power-On Commissioning 上电前检查/Checking Before Power-On 上电调测/Checking Before Power-On 步骤1:合上外部输入空开。 步骤2:参见供配电系统图,合上电源空开,逐级给对应设备上电。 检查项 操作方法 参考依据 Item Method Criteria 步骤3:核对设备初始配置参数 线缆整齐、美观,余长要剪除,不能盘 ...

This manual is also suitable for:

V200r003c10