GE JV966DSS Owner's Manual & Installation Instructions page 13

Vented range hoods
Table of Contents
Available languages

Available languages

DETERMINE HOOD, DUCTWORK AND WIRING LOCATIONS
• Keep the wood support piece and its screws for
later installation. Do not discard.
• Measure desired distance from the bottom of the
hood to the cooking surface, 24 min. to 36 Max.
Refer to the previous page if the accessory duct cover
will be used.
• Use a level to draw a horizontal line indicating the
bottom of the hood.
• Use a level to draw the cooktop centerline location.
"
• Measure 15-3/8 up from the horizontal line for the
bottom of the hood. Draw another horizontal line.
"
• Measure 18 up from the line for the bottom of the
hood, draw another horizontal line to indicate the
top of the hood.
FOR VERTICAL (Straight Up) DUCTING:
• If venting out the ceiling, extend the centerline
forward on the ceiling.
"
– Measure 6-7/8 from drywall to mark centerline for a
"
7-1/2 dia. duct hole on the ceiling.
– If drywall is not present, add drywall thickness to the
"
6-7/8 dimension.
Venting through a soffit or upper cabinet.
• Follow the same procedure for ceiling ducting to cut
"
the 7-1/2 dia. hole through the top of the cabinet or
soffit.
• See Step 4, page 15 for details to cut opening for
duct transition.
House Wiring Location:
• The junction box is fastened to the back of the hood
on the right side. See illustrations for hood knockout
locations.
Note: The junction box can be relocated to the inside
top of the hood.
House wiring may enter the junction box from the rear
or the top of the hood at the right side.
To route house wiring through the ceiling or soffit:
–Cut a hole approximately 1 dia., 5-7/8 forward on
"
the ceiling, 11-1/8 to the right of the centerline for
"
"
30 models or 14-1/8 to the right of the centerline
"
for 36 models.
To route house wiring through the wall:
–Cut a hole approximately 1 dia., 10-1/16 down
from the top of the hood, 11-1/8 to the right of the
"
centerline for 30 models or 14-1/8 to the right
of the centerline for 36 models.
• Remove top or rear knockout depending on your
installation.
Install strain relief onto back or top of hood.
Installation Instructions
"
"
"
"
"
"
"
"
"
6-7/8"
Centerline To Wall
7-1/2" Dia. Hole
FOR WALL VENT DUCT
Top of Hood
Bottom of Hood
FOR DUCTING THROUGH REAR WALL:
• Measure the supplied duct transition with any straight
run length of duct used, plus 90 elbow height. Draw a
horizontal line on the wall intersecting the centerline.
Knockout
Locations
13
FOR CEILING
VENT DUCTING
Electrical
Centerline
8" Min. Above
Top of Hood
Wood
18"
Support
15-3/8"
Electrical
°
14-1/8" for 36" Models
11-1/8" for 30" Models
5-7/8"
10-1/16"
14-1/8" for 36" models
11-1/8" for 30" models
Table of Contents
loading

This manual is also suitable for:

Jv936dssJv936Jv966

Table of Contents