Piping installation
8 Piping installation
In this chapter
8.1 Preparing refrigerant piping
8.1.1 Refrigerant piping requirements
Installer reference guide
94
8.1
Preparing refrigerant piping ...................................................................................................................................................
8.1.1
Refrigerant piping requirements ...........................................................................................................................
8.1.2
Refrigerant piping insulation..................................................................................................................................
8.2
Connecting the refrigerant piping..........................................................................................................................................
8.2.1
8.2.2
8.2.3
8.2.4
Pipe bending guidelines .........................................................................................................................................
8.2.5
To flare the pipe end..............................................................................................................................................
8.2.6
To braze the pipe end ............................................................................................................................................
8.2.7
8.2.8
8.2.9
8.3
Checking the refrigerant piping.............................................................................................................................................. 103
8.3.1
8.3.2
8.3.3
8.3.4
To check for leaks................................................................................................................................................... 104
8.3.5
To perform vacuum drying .................................................................................................................................... 105
8.4
Charging refrigerant ............................................................................................................................................................... 106
8.4.1
About charging refrigerant .................................................................................................................................... 106
8.4.2
8.4.3
Charging additional refrigerant.............................................................................................................................. 108
8.4.4
8.4.5
8.5
Preparing water piping ........................................................................................................................................................... 110
8.5.1
Water circuit requirements ................................................................................................................................... 110
8.5.2
8.6
Connecting water piping ........................................................................................................................................................ 114
8.6.1
8.6.2
8.6.3
To connect the water piping.................................................................................................................................. 115
8.6.4
To connect a pressure vessel ................................................................................................................................. 118
8.6.5
To fill the heating system ....................................................................................................................................... 118
8.6.6
8.6.7
To fill the storage tank ........................................................................................................................................... 120
8.6.8
To insulate the water piping .................................................................................................................................. 121
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
Also see
"7.1.4 Special requirements for R32
requirements.
▪
Piping length: See
"7.1.3 Installation site requirements of the indoor
▪
Piping material: phosphoric acid deoxidised seamless copper
▪
Piping connections: Only flare and brazed connections are allowed. The indoor
and outdoor units have flare connections. Connect both ends without brazing. If
brazing should be needed, take the guidelines in the outdoor unit installer
reference guide into account.
10].
"2 General safety
4
units" [
72] for additional
unit" [
ERLA11~16DAV3+W1 + EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH₂O
4P663482-1B - 2022.07
94
94
95
95
95
96
97
97
97
98
99
4
71].