Cisco Cable Mgmt Bracket 7513/7576 Installation Instructions Manual

Cisco systems bridge/router installation instructions

Quick Links

Text Part Number:
78-2473-02
Cisco 7513 and Cisco 7576
Cable-Management Bracket Installation
Instructions
Product Numbers: ACS-7513CBLM= (Cisco 7513), ACS-7576CBLM= (Cisco 7576)
Customer Order Number: DOC-782473=
The cable-management bracket for the Cisco 7513 and Cisco 7576 chassis is a spare part that can be
installed in the field. This publication describes the procedure required to install the
cable-management bracket.
Document Contents
This publication contains the following sections:
Product Overview, page 1
Installing the Cable-Management Bracket, page 2
Cisco Connection Online, page 5

Product Overview

The Cisco 7513 and Cisco 7576 cable-management bracket is mounted above the card cage, on the
interface processor end of the chassis. (See Figure 1.) The bracket allows you to route cables away
from the interface processors, which keeps this area clear for any future maintenance requirements.
Note
However, the backplane and the interface processor slot numbering scheme on the card cages are
different. The interface processor slot numbering scheme of the Cisco 7513 is shown in Figure 1.
The slot numbering scheme has no effect on the location or installation of the cable-management
bracket.
Corporate Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
Copyright © 1996-1998
Cisco Systems, Inc.
All rights reserved.
The Cisco 7513 and Cisco 7576 use the same chassis and cable-management bracket.
1
loading

Summary of Contents for Cisco Cable Mgmt Bracket Cisco 7513/7576

  • Page 1: Product Overview

    The interface processor slot numbering scheme of the Cisco 7513 is shown in Figure 1. The slot numbering scheme has no effect on the location or installation of the cable-management bracket. Corporate Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 Copyright © 1996-1998 Cisco Systems, Inc.
  • Page 2: Installing The Cable-Management Bracket

    Installing the Cable-Management Bracket Figure 1 Installing the Cable-Management Bracket The cable-management bracket attaches to the interface processor end of the chassis just above the card cage and below the blower module. (See Figure 2.) Use the bracket to keep network interface cables untangled and orderly, and to prevent cables from hindering access to interface processors in the interface processor slots.
  • Page 3: Tools And Equipment Required

    Tools and Equipment Required You need the following tools and parts to install the cable-management brackets; the brackets and panhead screws are included with the chassis: • Large flat-blade screwdriver • One cable-management bracket and two slotted panhead screws (already attached to the chassis) Installation Procedure To install the cable-management bracket, follow these steps: On the interface processor end of the chassis, locate the two slotted screws positioned...
  • Page 4 Installing the Cable-Management Bracket Use a flat-blade screwdriver to loosen the two slotted screws approximately 1/8-inch. Step 2 Place the bracket over the screws (see Figure 2), and slide the bracket to the right. Step 3 Step 4 Use a flat-blade screwdriver to tighten the screws. Step 5 When installing the network interface cables, route the cables up to and through the cable-management bracket.
  • Page 5: Cisco Connection Online

    Systems, the Cisco Systems logo, Enterprise/Solver, EtherChannel, FastHub, ForeSight, FragmentFree, IP/TV, IPX, LightStream, MICA, Phase/IP, StrataSphere, StrataView Plus, and SwitchProbe are registered trademarks of Cisco Systems, Inc. in the U.S. and certain other countries. All other trademarks mentioned in this document are the property of their respective owners.
  • Page 6 Cisco Connection Online 6 Cisco 7513 and Cisco 7576 Cable-Management Bracket Installation Instructions...