Cisco 7513 Hardware Installation And Maintenance Manual
Hide thumbs Also See for 7513:
Table of Contents
loading

Summary of Contents for Cisco 7513

  • Page 2 Cisco 7513 Hardware Installation and Maintenance Corporate Headquarters Tasman Drive San Jose 34-1 526-4000 800 553-NETS Number DOC-751 Customer Order 3HIM1 Number Text 78-1 Part 8-01...
  • Page 3 Hewlett-Packard software in part OpenView license OpenView trademark 1992 1993 Hewlett-Packard Company Company of the Hewlett-Packard Copyright Cisco implementation header compression program developed of California as part adaptation University Berkeley UCBs UNIX domain reserved version of the system...
  • Page 4 Systems other trademarks marks service or registered service marks trademarks mentioned document registered in this their property owners respective 7513 Hardware Circa and Maintenance Installation Cisco 1995 Copyright Systems reserved rights Printed 956R WARE SOFF LICENSE READ SOFTWARE AGREEMENT...
  • Page 5 Hardware less depreciation calculated basis straight-line been been Exclusions above which as authorized by Cisco installed operated does Product altered warranty apply except been instructions maintenance by Cisco or maintained accordance with or operating...
  • Page 6: Table Of Contents

    CONTENTS TABLE About Manual This xvii Document Objectives xvii Audience xvii Document Organization xviii Document Conventions Technical Assistance Obtaining Product Overview Chapter Physical Description Chassis Specifications Units Spares Field-Replaceable Dual Arbiter Power Supplies Blower Module Chassis Interface 1-10 1-il System Backplane Route Switch Processor...
  • Page 7 Connections 2-44 EIA/TIA-449 Connections 2-45 Connections 2-45 X.21 Connections 2-46 EIA-530 Connections 2-46 Thumbscrew Metric Replacements 2-46 HSSI Connection 2-47 Equipment Console and Connection Port 2-47 Equipment Auxiliary Tools 2-48 Installation Information 2-48 Initial Configuration 7513 Cisco Hardware Installation Maintenance...
  • Page 8 Router Checklist 2-49 Installation 2-50 Unpacking System the Contents 2-50 Checking System Components 2-51 Site 2-53 Router Chapter Installing Rack-Mounting the Chassis General Installation the Cable Bracket Management Installing and Equipment Tools the Bracket Installing Power Connecting Interface Cables Connecting External Guidelines Cabling...
  • Page 9 Configuring Serial Port Cables 5-41 Replacing Adapter Port Adapters 5-43 Removing Replacing Serial 5-49 Configuring Port 5-50 Jumper Adapter Configuring Commands Using the Configure 5-51 the Configuration 5-54 Checking Port Adapters 5-58 Removing Replacing 7513 Hardware Cisco Installation and Maintenance...
  • Page 10 Removing Chassis Replacing 5-63 Components Overview of the Replacement Procedures 5-64 Tools Materials 5-64 Required Removing Blower Module 5-64 Replacing Power Removing Supply 5-65 Replacing Power Removing Supply 5-66 Power 5-68 Replacing Supply Card Cage and Backplane 5-70 Removing Replacing Assembly Appendix Cabling...
  • Page 11 7513 Hardware Cisco Maintenance Installation...
  • Page 12 FIGURES LIST 7513 Shown Cisco Router Processor Power Figure EndAC-Input Supplies 7513Front View Cisco Cover Figure Panels Showing 1200W AC-Input Power Figure Supply 1200W DC-Input Power Figure Supply FlowSide View Internal Figure CyBus Orientation 1-11 CyBus Backplane Figure Guides on...
  • Page 13 2-41 Cable Connector Figure Interface 2-47 2-42 Cisco 7513 Figure Interface Processor Slot Numbering with Table 2-18 2-55 Figure Correct Lift the Cisco 7513 Figure Incorrect the Cisco to Lift 7513 Figure Cable Management Bracket Cisco 7513 Hardware Maintenance Installation...
  • Page 14 Removing the Terminal Block Cover Figure Replacing Removing DC-Input Power Cable Figure Replacing Connections AlPPartial Views Figure of the 3-10 CAB-ATM-DS3IE3 Figure Cable 3-11 Filter Installing Assembly Clip Ethernet Connections 3-12 Figure Fast Ethernet Connections 3-13 Figure Token 3-10 Ring Connections 3-14 Figure...
  • Page 15 Switch Figure Master/Slave Switch AlP LEDs Figure LEDs Figure LEDs Figure LEDs FEIP Figure LEDs Figure FSIPLEDs B-il Figure B-12 Figure Signals LEDs B-li B-13 Figure MIPLEDs B-12 B-14 Figure TRIP LEDs B-iS B-13 Figure 7513 Hardware Cisco Maintenance Installation...
  • Page 16 TABLES LIST 7513 Table Cisco System Specifications RSP2 Memory Table 1-14 Components Model Numbers Table E1-G.703/G.704 Port Cables 1-27 Descriptions Adapter Table Processor-Monitored Thresholds 1-40 Temperature Typical Table Power Thresholds 1-41 Supply-Monitored DC-Voltage Typical Table Ethernet Coaxial Connection Limits Transmission...
  • Page 17 Signals A-i9 Cable Table A-16 Straight-Through Signals A-20 Table Interface Cable A-16 Pinouts Table Descriptions FSIP B-il Table Descriptions Code Table Telephone 25-Pair Color Numbers Industry Second Code Scheme Table Color for Smaller Numbers Wires 7513 Hardware Maintenance Cisco Installation...
  • Page 18: About This Manual

    About Manual This This section discusses the objectives intended hardware audience organization this maintenance defines the conventions installation used instructions publication convey information noteworthy Document Objectives and network This publication contains for preparing site procedures equipment for the specific your need of the router the future...
  • Page 19: Document Organization

    Plans scheme Appendix Industry Standard Wiring the telephone color-code lists industry for 25-pair wires numbers the pin including 7513 Hardware Cisco and Maintenance xviii Installation...
  • Page 20 Before bodily aware of the hazards involved with any equipment electrical standard practices circuitry accidents preventing Chapter provides safety considerations general guidelines specific 7513 the Cisco router safely installing About Manual This...
  • Page 21: Obtaining

    North America from Europe 64 46 40 526-8070 terminal VT100 none data bits stop bits emulation following settings parity baud 14.4 rates kbps ClOs FAQs Asked copy Frequently Questions contact [email protected] additional contact information cio-tearn@cisco corn 7513 Hardware Cisco Installation Maintenance...
  • Page 22 Transfer Interface Processor CIPChannel Interface Processor CxBusCisco Mbps Extended modules data bus for processor 533-megabit-per-second 7000 used in the Cisco routers series Extended Gbps CyBusCisco the 1.067-gigabit-per-second data bus for processor modules 7513 There used in the Cisco two CyBuses...
  • Page 23: Physical Description

    Interface Processor FIPFDDI Interface Processor FSIPFast Interface Serial Processor FRUsField-replaceable defined units that spare part requires replacement Cisco-certified service provider HSSI Interface Processor MIPMultiChannel Interface Processor OIROnline and removal Allows replace interface insertion without processors interrupting system power RSP2Route Switch...
  • Page 24 Cisco 7513 Router Processor Power Shown EndAC-Input Figure Supplies Blower module Cable management bracket Card cage modules processor Air intake vent...
  • Page 26: Chassis Specifications

    Physical Description Chassis Specifications 7513 Table the Cisco and power lists physical specifications requirements Cisco 7513 Table System Specifications Description Specification Backplane two 1.0677-Gbps CyBuses RSP2 13-slot interface slots slots processor plus Dimensions 33.75 44.45 55.88 17.5 85.73 Chassis width...
  • Page 27: Spares And Field-Replaceable Units

    Note 7513 7000 dual the Cisco not interchangeable with for the Cisco arbiter arbiter 7505 assembly and or the single for the Cisco dual part of the card arbiter arbiter cage not available part or...
  • Page 28: Power Supplies

    Physical Description Power Supplies 7513 Cisco comes 1200W with equipped at least shown AC-input power supply 1200W at least DC-input power shown Figure supply Figure 1200W AC-Input Power Figure Supply Note Each AC-input power 2OVAC dedicated supply operating requires service...
  • Page 29: Blower Module

    When internal out of tolerance voltages internal supply fan power operating the fan on For LEDs properly of the complete refer description power supply Reading appendix Indicators Cisco 7513 Hardware Maintenance Installation...
  • Page 30 Physical Description Inside each AC-input DC-input power supply one fan forces cooling through power supply flows the faceplate of the interior into out the rear of the supply power power supply the lower front panel of the chassis The power monitors supply temperature...
  • Page 31: Chassis Interface

    Chassis Interface ENYM chassis interface the environmental and power provides monitoring supply monitoring 7513 functions for the Cisco chassis interface and system from software isolates variations chassis interface assembly and chassis-specific part of the backplane available separately part or...
  • Page 32: System Backplane 1-Il

    Physical Description System Backplane The dual-CyBus 7513 the Cisco has an aggregate bandwidth backplane of 2.134 gigabits Gbps second CyBus interface and CyBus slots comprises processor through comprises shows interface the orientation slots through of the CyBuses processor Figure CyBus...
  • Page 33 When RSP2 Caution or interface ensure that installing processor installing avoid damaging or the slot appropriate backplane sure guides to install filler MAS-RSPBLANK MAS-7KBLANK slot Interface empty fillers will processor slots 7513 1-12 Cisco Hardware Maintenance Installation...
  • Page 34: Route Switch Processor

    Physical Description Route Switch Processor RSP2 shown main system RSP2 Figure the router contains processor system memory maintains system executes functions components management system The RSP2 that control software system contained Flash either memory SIMM module Card single in-line memory Personal Memory International...
  • Page 35 32-MB maximum Bank based required Bank NVRAM3 EPROM5 Nonvolatile for the file.6 system configuration SIMM Flash Contains Cisco lOS RSP2 images PCMCIA Flash Card and 20 Contains Cisco lOS on up cards Slot Slot images EPROM ROM8 Boot for the...
  • Page 36 Physical Description Processor Microcode Software Interface System 7513 Cisco downloadable and microcode most upgrades router supports software system which enables from boot new image download remotely store publication 7XXX Document Number and Microcode Upgrading Cisco Series Routers Software which from...
  • Page 37: Jumpers

    Note console on two RSP2s auxiliary ports connected simultaneously controlled cables are shipped with each system however using special that this cable-connection feature RSP2 not available with release of the initial 7513 Hardware 1-16 Cisco Maintenance Installation...
  • Page 38 X.21 interfaces V.35 Caution interface be used serial SX-SIP PRE-FSIP cannot in the early processor 7513 the SX-SIP Cisco SxBus and SxBus connectors are not present that requires Cisco 7513 HIPFor 52-Mbps HSSI single port MIPFor...
  • Page 39 Description The microcode each interface contains board-specific software instructions processor and enhancements microcode features are often interfaces system implemented upgrades 7513 downloadable microcode most maintenance which Cisco enables upgrades supports memory You download microcode them images in Flash then store...
  • Page 40 Physical Description Processor Interface between connection direct CyBus networks provides the high-speed the external The AlP the following Figure data transmission rates support Asynchronous Transparent TAXI Mbps Transmitter/Receiver Interface 4B/5B Synchronous Optical SONET/SDH Mbps Mbps Network/Synchronous Digital Hierarchy EPROM AlP microcode 44.736 default Mbps...
  • Page 41 ECA CX-CIP-ECAP1 Combination ECA CX-CIP-ECA1 dual cather Single ECA CX-CIP-ECA2 Dual dual carrier PCA CX-CIP-PCA2 Dual dual carrier For more information Channel refer Processor Installation Interface Document Number Configuration publication available UniverCD 78-1342-xx print 1-20 Cisco 7513 Hardware Maintenance Installation...
  • Page 42 Physical Description Processor Ethernet Interface shown in Figure 1-11 Ethernet provides four that ports operate Mbps bit-slice between EIP and data path other interface provides high-speed processor EPROM UlOl EIP microcode default resides in socket processors 1-11 Ethernet Interface Processor Figure ulol Each...
  • Page 43 CXFEIP-2TX 100BASE-TX interface with processor port adapters interfaces FEIP both Mbps half duplex full configured duplex maximum bandwidth The FEIP microcode Mbps boot resides aggregate image EPROM in an socket location 1-22 7513 Hardware Maintenance Cisco Installation...
  • Page 44 Physical Description Data Fiber Distributed Interface Processor The FTP contains the industry-standard chipset for interoperability SuperNet 6-million per second mips instructions Mbps interface rates There processor high-speed locations restrictions slot available sequence install interface processor slot shows multimode/multimode FIP on bottom and 1-13 FTP on...
  • Page 45 FSIP not constructed support additional four-port leaves the factory contains ports after module control Universal circuitry only four-port port adapter descriptions refer which Port Adapters follows Serial this section 7513 Hardware Maintenance 1-24 Cisco Installation...
  • Page 46 Physical Description There locations restrictions slot FSIPs you can available install sequence interface slots connection equipment the section Serial processor descriptions serial refer Connection in the chapter Equipment For examples Preparing Installation network Connections Router connections the section Serial the chapter refer Installing All interface...
  • Page 47 -G.703/G.704 Port Adapter The FSIP El-G.703/G.704 7513 connects the Cisco with port adapter 1-16 2-Mbps Figure leased-line need extemal services interface eliminates data termination unit...
  • Page 48 Physical Description E1-G.703/G.704 versions of the interface mode available supports balanced mode modes other supports unbalanced Neither nor the cables are interchangeable cannot unbalanced balanced configure line nor can attach an interface cable port support intended balanced unbalanced port port The FSIP El-G.703/G.704 interface framed and unframed...
  • Page 49 Following associated with CX-HIP HSSI interface single-port processor CAB-HSI1 HSSI cable straight-through CAB-HNUL HSSI null-modem cable There restrictions locations slot available sequence install interface slot processor 1-28 7513 Hardware Cisco Maintenance Installation...
  • Page 50 120-ohm interface with two-port processor port adapters There locations restrictions slot sequence available install interface slot processor Note The MultiChannel Channel Attachment Interface Processor Interface Processor and have dissimilar dissimilar functions interfaces within entirely entirely Cisco 7513 Overview Product 1-29...
  • Page 51 MAUs Token Token Ring Connection For descriptions Ring connectors the section refer Token Ring network Equipment the chapter for Installation Preparing descriptions Token Router Ring Connections refer the section the chapter connections Installing 1-30 Cisco 7513 Hardware Maintenanco Installation...
  • Page 52: Interface Processors

    Cisco controls both following assigns slot/port addresses MAClayer within the chassis interfaces Numbers Slot/Port numbers 7513 In the Cisco location of each interface the router slot/port actual specify port The numbers interface 1-20 number Figure use the format processors...
  • Page 53 1-32 7513 Hardware Maintenance Cisco Installation...
  • Page 54: Functional Overview

    Overview Functional show Following example interfaces used command without arguments displays information status the physical number including each interface the router In the slotlport most of the information example status following for each omitted interface Router Serialo/0 line is up protocol Hardware cxBus...
  • Page 55: Mac-Layer

    When addresses device the backplane avoids these memory problems Storing no need network interface with another there other devices identical replaced interface data tables their structures update routing 1-34 Cisco 7513 Hardware Maintenance Installation...
  • Page 56 Overview Functional and Removal Online Insertion feature allows to install interface while replace system processors operating you do down need notify the software or shut All interface system power processors CIP BIP FEIP FIP FSIP TRIP functional support following information background description only...
  • Page 57 For detailed the section refer Installing hang perform steps Modules Router in the chapter Processor Maintaining Configuring 7513 1-36 Cisco Hardware Maintenance Installation...
  • Page 58 Functional Overview 1-21 Levers and Screws Installation Figure Ejector Captive Bottom lever ejector Processor Processor module module slot carrier guide Captive Installation screw STOP contact Overview Product 1-37...
  • Page 59: Microcode

    Overview Functional Microcode 7513 downloadable microcode most upgrades which Cisco enables load supports microcode microcode images into Flash interface version memory latest processor bundled microcode with the system software image images distributed disk floppy maintenance part of each software release...
  • Page 60: Environmental Monitoring

    Functional Overview hardware version minimum hardware revision lists ensure target required compatibility and microcode When with software from bundled load boot images image the system checks hardware module version of each that finds installed processor the actual version hardware from compares version list...
  • Page 61 Processor-Monitored Thresholds Table Typical Temperature Parameter Normal Shutdown Critical High Warning High 1040C Inlet 1040C Hotpoint 1040C Exhaust Processors Power supply Restart 7513 Hardware 1-40 Cisco Maintenance Installation...
  • Page 62: Environmental Reports

    Overview Functional Power Table Thresholds Supply-Monitored DC-Voltage Typical Parameter Normal Critical Warning High Warning High Critical 4.74 4.74 to 5.26 4.49 5.52 5.25 10.20 to 13.8 10.76 11.37 13.24 12.64 1015 10.20 13.80 10.76 13.25 13.86 20.00 28.00 2651 19.06 28.87 21.51 exceeds...
  • Page 63 10.76 11.37 13.24 voltage 12.64 4.49 voltage 4.74 5.25 5.52 10.15 10.76 13.86 Voltage -13.25 voltage 19.06 21.51 26.51 28.87 Shutdown boards l0lC/213F Shutdown supplies lOlC/2l3F power Note values Temperature are subject change ranges 1-42 Cisco 7513 Hardware Maintenance Installation...
  • Page 64 RSP2 show sensors lines environment temperature DC-input command which also in the Cisco showing 7513 displays report slots are occupied indicated and which empty when Active conditions are indicated blower fault not present...
  • Page 65: Blower Shutdown

    %ENVM-2-FAN failed Blower When the temperature reaches will display the following critical level system message show command environment when console in the screen system display restarts messages Queued %ENVM-l-SHUTDOWN Environmental Monitor initiated shutdown 1-44 Cisco 7513 Hardware Maintenance Installation...
  • Page 66 CHAPTER for Installation Preparing This describes the for router installation equipment site chapter includes requirements power and must be that installation cabling requirements place site descriptions need additional equipment the installation will the environmental conditions complete must meet normal maintain site your operation...
  • Page 67 Fasten or scarf sleeves caught your Metal up when power and ground burns objects heat connected serious Warning cause Safely Lifting 7513 Cisco 160 pounds weighs chassis not intended configured approximately fully moved Before install the router ensure prepared that...
  • Page 68 Recommendations Safety power and Disconnect external cables before chassis removing installing work alone when hazardous conditions exist potentially Never assume been from disconnected check that circuit power always perform action hazard makes that creates potential equipment people unsafe Never install equipment that damaged...
  • Page 69: Site

    Power 1200W 7513 supply uses factor corrector allows the Cisco AC-input power that power and 50 current within the ranges operate input...
  • Page 70: Wiring

    Site Requirements Plant Wiring are guidelines the plant wiring Following When setting site cabling your planning location of the system consider the distance limitations signaling electromagnetic connector interference described the following compatibility sections Interference Considerations When wires are run for distance in an field interference significant...
  • Page 71 Industry Industry EIA/TIA568-compliant cable 100BASE-FX which 100BASE-T or half duplex full duplex 100BASE-T which over fiber 100BASE-T4 optical using Category 100BASE-T4 shielded twisted which with four pairs also called pair cabling cable over 2-pair Category 7513 Hardware Maintenance cisco Installation...
  • Page 72: Media

    M11-to-IVffl Maximum 100BASE-TX 1312 segment 100BASE-FX length ft.5 Maximum network with length ft.5 repeater EIA/TJA-568 EIA/TIA-568 TSB-36 compliant Cisco does 150-ohm Systems not supply RJ-45 cables Both Category are commercially available American Wire Gauge EIAITIA-568 This standard gauge specified This...
  • Page 73: Eia/Tia-232

    Table the standard generally rate between baud EIA/TIA-232 distance rate relationship signals IEEE Standard Table EIA/TIA-232C Transmission versus Distance Speed Rate Distance Feet Distance Meters 2400 4800 9600 19200 38400 56000 7513 Hardware Cisco and Maintenance Installation...
  • Page 74 Site Requirements Balanced EIAITIA-449 drivers allow greater distances than EIAITIA-232 signals to travel shows between Table the standard distance EIAITIA-449 rate relationship signals IEEE Table Standard Transmission versus Distance EIA/TIA-449 Speed Rate Distance Distance Feet Meters 2400 4100 1250 4800 2050 9600 1025...
  • Page 75 18.5 11.5 The power margin calculation from power budget and the link loss derived subtracts follows work power margin the link positive rule will 7513 2-10 Cisco Hardware Maintenance Installation...
  • Page 76 Site Requirements Table 2-10 contribute link the estimate of the lists factors that loss value link loss those factors attributable Table 2-10 Loss Link Estimating Loss Link Loss Value Factor Estimate of Link mode Higher order losses Clock module recovery Modal and chromatic and wavelength...
  • Page 77 Determining with accurate knowledge of variations in the statistical requires data document link the scope components Statistical beyond this power budget analysis UNI Forum further information ITU-T and your equipment refer specifications standards specifications 7513 2-12 Cisco Hardware Maintenance Installation...
  • Page 78 7513 shows for the Cisco the chassis footprint dimensions Figure outer 2-13 Installation Preparing...
  • Page 79 Figure customized recommend rack-mount are designing shelf use the that designed 7513 the Cisco 7513 Hardware 2-14 Cisco Installation Maintenance...
  • Page 80 Always heavier install the lower half of rack maintain equipment center of gravity from the rack over 7513 Cisco rack the chassis bottom prevent install falling should than from inches the floor higher racks be use Telco-type...
  • Page 81 Temperature operating 149F ambient Temperature nonoperating storage ambient noncondensing Humidity operating ambient noncondensing Humidity nonoperating storage 10000 Altitude and nonoperating 3050 level operating 5200 oct/mm Vibration operating 5200 oct/mm Vibration nonoperating 200500 oct/mm 7513 2-16 Cisco Hardware Maintenance Installation...
  • Page 82 Site Requirements Preventive Site Normal Configuration Maintaining Operation location for the router Planning proper the layout of your equipment rack or wiring closet essential successful too close together system Equipment operation placed or inadequately ventilated made cause conditions system overtemperature addition chassis panels make...
  • Page 83 Figure shows the conductor for the cable connections DC-input preparation DC Power Cable Connection Block Figure Terminal .925 measurements inches Maximum exposed View conductor surface conductor Crimp area .140 7513 Hardware 2-18 Cisco Maintenance Installation...
  • Page 84 Network Connections Preparing Preparing Network Connections When network site connections the router you must number preparing consider your related each factors type of interface such the type of cabling required each thick fiber type thin coaxial or unshielded distance limitations twisted-pair each cabling...
  • Page 85: Eia/Tia-449

    PLIM PLIMs module connect the following that support physical layers TAXI 4B/5B multimode Mbps fiber optic SONET/SDH STM-i multimode Mbps opticSTS-3C fiber SONET/SDH STM-i Mbps fiber opticSTS-3C single-mode coaxial cable Mbps coaxial cable Mbps 2-20 Cisco 7513 Hardware Maintenance Installation...
  • Page 86: Management

    Network Connections Preparing DS3 PLIMs Note The E3 and CAB-ATM-DS3/E3 cable require Caution PLIM with ensure compliance connection standards requires an filter RCVR DS3 PLIM the receive port CLIP-E3-EMI connection does not require clip this clip wide-area networking standardized for use Broadband currently being Integrated...
  • Page 87 Cable Connectors Coaxial with Figure White White insulator Ferrite insulator beads PLIM Caution ensure with connection requires an compliance standards filter RCVR PLIM CLIP-E3-EMI the receive port connection does not require this clip clip 2-22 Cisco 7513 Hardware Maintenance Installation...
  • Page 88 Network Connections Preparing For multimode multimode media connections connect interface cable interface cable PLIM 4B/5B connector Figure MIC Connector 4B15B PLIM Figure SONET For multimode multimode PLIM connect cable connections connector 2-10 Figure SONET Multimode 2-10 PLIM Figure Duplex SONET multimode SC-duplex 2-11 connector...
  • Page 89 ECA PCA only For more information cable respective requirements refer Channel Attachment note Processor Installation configuration Interface Configuration Document Number which on UniverCD available print This configuration 78-1342-xx FRUs ships with also note spare parts 7513 Hardware Maintenance 2-24 Cisco Installation...
  • Page 90 Preparing Network Connections Ethernet Connection Equipment need will 802.3 or an Ethernet transceiver transceiver cable between each the Ethernet network Ethernet port connectors are standard 5-pin DB-15 AUI receptacles that or transceiver require cable with interface plug 2-14 Figure 2-14 Ethernet Interface Cable Connectors...
  • Page 91 IEEE connected with cable The same station transceiver 802.3 refers specification media type of device attachment unit the cable attachment unit interface AUIs Both transceiver cables connect ports directly 2-26 7513 Hardware Maintenance Cisco Installation...
  • Page 92 Network Connections Preparing Transceivers from are available variety of sources 1OBASE-5 for thick-wire thin-wire 1OBASE-2 Mbps or unshielded 1OBASE-T 2-15 shows twisted-pair cabling Figure examples of transceivers connection equipment connect Ethernet either Version Version 2/IEEE 802.3 interfaces both automatically types supports 2-15 Figure...
  • Page 93 Sliding Thumbscrew Post Jackscrew slide-type locks are standard however conversion included with each kits ports the slide-type locks with jackscrews For refer replace instructions replacement specific document accompanies the jackscrew installation that 7513 Hardware 2-28 Cisco and Maintenance Installation...
  • Page 94 Preparing Network Connections Connection Fast Ethernet Equipment The two FEIP connectors D-shell type and adapter 40-pin port single single RJ-45 be used either or the other Only one one time The FEIP connector have up Each IEEE installed connection port adapters 802.3u interfaces supports...
  • Page 95 Type 2-19 plug large Figure TRIP Token 2-19 Lobe Cable Connectors DB-9 Ring Type Types Figure TRIP MSAU 7513 Hardware 2-30 Cisco Maintenance Installation...
  • Page 96 Network Connections Preparing Type lobe cables shielded twisted either or unshielded twisted pair cable pair network TRIP terminate with RT-ll plug 2-20 Figure of both cable DB-9 plug types TRIP Token 2-20 Ring Type Lobe Cable DB-9 Figure Connectors RJ-11 Types IEIIIIIID TRIP...
  • Page 97 While frame the information network the ring there token early token unless circling which enabled must release described so other transmit section wanting later this stations wait Therefore Token Ring networks cannot occur collisions 7513 2-32 Cisco Hardware Maintenance Installation...
  • Page 98 Network Connections Preparing scheme allows the user which priority designate station high priority allows station use the ring more than stations Stations seize or reserve frequently lower-priority cannot token with which passing than allows higher designated priority priority highest-priority seize the token frame stations soon...
  • Page 99: Connection

    In addition transmitters usually fiber LBDs source and diode which transmitters use single-mode laser light capable data Both faster rates types use detector the receiver sustaining to translate photodiode light into electrical signal signals 7513 Hardware 2-34 Cisco Installation Maintenance...
  • Page 100 Network Connections Preparing FDDI and Cable Connectors Transceivers interface uses simplex FC-type connectors for the transmit receive ports single-mode 2-22 connector standard 8.7/125 10/125-micron Figure accepts single-mode cable interface supports connections distances miles single-mode fiber-optic kilometers FDDI Network 2-22 Single-Mode Interface Figure Connectors...
  • Page 101 Class ring physical designated ports Each connects both the primary receiver station secondary rings port ring transmitter for the other For example ring and receives the primary traffic from transmits the primary ring 7513 Hardware 2-36 Cisco Maintenance Installation...
  • Page 102 Network Connections Preparing FDDI Management Fault FDDI network down dual rings in an tolerance fault dual ring shuts station provide fails such Station in Figure 2-25 the ring automatically wraps doubles back form itself This removes from single contiguous ring failed station but allows...
  • Page 103 Another tolerance dual fault homing devices are attached whereby technique critical the designated concentrators concentrator active unless Only primary link fails does concentrator activated the ring backup passive primary fail sustains automatically 7513 Hardware 2-38 Cisco Installation Maintenance...
  • Page 104 Network Connections Preparing MultiChannel Connection Equipment interface cable each connectors connect with 15-pin shows external 2-27 interface cable Figure connectors 2-27 Cable Interface Figure modem null connector typical four cables are available for use with serial have All four connectors end and DB-15 Twinax...
  • Page 105: Equipment

    2-32 interface type Cables data respective Figure interfaces except mode mode EIA-530 network are available with or in with plug network mode labeled the connectors both ends receptacle the cables 7513 Hardware 2-40 Cisco Installation Maintenance...
  • Page 106 Preparing Network Connections 2-32 Serial Port Adapter Cables Figure Router FSIP connections 1ko1 iiiiJ oo000000ololl 11JlI 00000000 _________ _______ ____________________ 000000000 _____________ 00000000 EINTIA-232 EIA/TIA-449 V.35 EIA-530 X.21 modem CSU/DSU Network connections Metric thumbscrews are included with each cable allow connection devices port adapter...
  • Page 107: Cables

    DB-15 down screwed FSIP connector backshell are securely while jackscrews operating E1-GG.703/G.704 FSIP and are the interface cables connect Following BNC cableCAB-E1-BNC or equivalent DB-1 cableCAB-E1-DB or equivalent Twinax cableCAB-B1-TWINAX or equivalent 7513 Hardware 2-42 Cisco Maintenance Installation...
  • Page 108: Formats

    Network Connections Preparing and NRZI Formats communications All data both interfaces nonreturn zero nonreturn support zero NRZI formats Both inverted formats different for transmission voltage levels signals maintain constant with levels return transitions voltage signal zero voltage level decoded NRZI interval during using absolute values...
  • Page 109: Connections

    Auxiliary only asynchronous ports support connections Adapter Cable Connectors 2-36 EIA/TIA-232 Network Figure RSP2 Console further information the section Port refer ports Auxiliary Connection cable the appendix Equipment this refer Cabling chapter pinouts Specifications 7513 Hardware Maintenance 2-44 Cisco Installation...
  • Page 110: Connections

    Network Connections Preparing EPAITIA-449 Connections EIAJTIA-449 which and unbalanced balanced EIAJTIA-422 EIAJTIA-423 supports EIA/TIA-232 Mbps version faster transmissions more functions that provides The EIAITIA-449 transmissions greater distances supports over standard intended replace not widely EIA/TIA-232 EIA/TIA-449 resistance convert adopted Industrys DB-25 the large base...
  • Page 111 4-40 replace thumbscrews network of those cables with thumbscrews Refer the section Devices Metric-Based in the chapter Router Connecting for replacement Installing instructions 7513 Hardware 2-46 Cisco Maintenance Installation...
  • Page 112: Equipment

    Network Connections Preparing HSSI Connection Equipment SONET T3 E3 need HSSI STS-1 will interface cable connect with HTP HSSI network the external interface HSSI port 50-pin SCSI-il-type receptacle interface cable each twisted shows comprises 2-41 pairs 50-pin plug Figure HSSI connector both ends...
  • Page 113 EXEC command Passwords unauthorized privileged-level access interpreter prevent for individual terminal lines virtual Protocols route plan so on which whether will Bridging configuration use bridging interfaces masks Internet Protocol addresses subnet are routing 7513 Hardware Maintenance 2-48 Cisco Installation...
  • Page 114 Router Installation Checklist Zone names network node numbers numbers for the interfaces required Token Operating speeds interfaces example Ring interfaces specific at either operate Mbps or 16 serial interfaces 2Mbps of an interface operate speeds speed often depends on the speed of the remote which...
  • Page 115 Step the following are included the shipping container accessories that Verify be separate 7513 assembled except power and cable-management Cisco router supplies fully bracket boxes accessories more some shipped separately Check the contents...
  • Page 116 Unpacking System RSP2 Check Step the processor slots contains 2-42 verify that slot Figure Step the other that slots slots each contain an interface Verify interface processor processor blank interface the remaining contains that slot filler processor filler the configuration that matches the packing...
  • Page 117 Unpacking System Component Table 2-16 List Recd Component Description Chassis Cisco 7513 router chassis Accessories following accessories arrive containers shipping separate EFT-RMK Rack-mount Rack-mount hardware documentation ACS-7513-RMK described Cable management bracket Power cable cable supply power supply cables FEIP EIP and...
  • Page 118 Site Site site record actions relevant and maintenance log provides historical the router operation common near the chassis Keep site where anyone place tasks has access your performs include the following to it Site entries might progressMake of the Router Installation Checklist copy...
  • Page 119 Site Table 2-17 Site Example Date Action Performed Symptom Observed Description Initials Page 2-54 7513 Hardware Cisco Maintenance Installation...
  • Page 120 Site Cisco 7513 2-42 Processor Figure Interface Slot Numbering with Table 2-18 Table 2-18 Port Slot Configuration Worksheet with 2-42 Figure Port SIot2 Slot Slot Slot Slot S1ot51 Slot Slot Slot Slot Slot Router Name Number Location Serial RSP2 are reserved...
  • Page 121 Site 7513 Hardware Maintenance 2-56 Cisco Installation...
  • Page 122 CHAPTER Router Installing This the following the router external cable making chapter provides procedures installing connections that system power system turning verifying initializes properly the chassis rack recommended equipment optional but strongly tabletop Installing the cable recommended bracket management optional Installing external connections...
  • Page 123 Figure the chassis using the blower module lift handle or the intake legs below the card cage vent Cisco 7513 Correct Figure Lift 7513 Hardware Cisco Maintenance Installation...
  • Page 124 3-2 The intake Figure vent not designed the weight of the chassis support Cisco 7513 Incorrect Lift Figure General Installation where you router should the area and your already location will...
  • Page 125 Large flat-blade and two cable management bracket attached the chassis slotted screws panhead already 7513 Hardware Cisco Maintenance Installation...
  • Page 126 Cable Management Bracket Installing Bracket Installing Follow these the cable bracket steps to install the router management Step the interface of the chassis locate the processor slotted screws positioned below blower module and above the card cage Figure Cable Bracket Management Figure screwdriver...
  • Page 127: Removing And Replacing

    Terminal Replacing Figure Loosen Terminal DC-input power supply Caution and meet maintain agency compliance emissions standards requirements Cisco 7513 must remain chassis with blank single power supply power supply power from remove blank the chassis unless supply adjacent this...
  • Page 128 Warning the terminal block could create hazard could Incorrectly wiring damage Make power supply power source and 7513 the Cisco chassis there certain components loose strands and power could short of the that circuit cause power source...
  • Page 129 Chassis this Rack-Mounting chapter processors unnecessarily 7513 Cisco Hardware Maintenance Installation...
  • Page 130 Cables Interface Connecting available cable systems strain-relief Most some from type of the cables interfaces provide strain relief prevent being accidentally disconnected Among these types of are the fasteners strain relief slide Ethernet cables cord and cable retention the screw-type power supply fasteners...
  • Page 131 PLIMs CAB-ATM-DS3IE3 PLIM Note The E3 and you have cable require CAB-ATM-DS3/E3 must follow cable to install filter assembly Steps through PLIM you do have the appropriate section your proceed configuration 7513 Hardware Maintenance 3-10 Cisco Installation...
  • Page 132 Cables Connecting Interlace XMTR RCVR Attach CAB-ATM-DS3IE3 Step cable the transmit receive ports PLIM 3-7a Figure of the cable white insulator both ends portion ensure that receive-to-transmit transmit-to-receive between maintained relationship PLIM switch of the cable with the white should insulators your portion...
  • Page 133 Ethernet equipment connector locks the section descriptions refer Connection in the chapter Equipment Preparing for Installation Connections Ethernet Figure network cable 3-12 Cisco 7513 Hardware Maintenance Installation...
  • Page 134 Note MIT and RJ-45 not simultaneously connect cables 100BASE-T RJ-45 port adapter and MIT from cables not available Cisco Systems you have RJ-45 attach the Category RJ-45 connections cable port directly FEIP See you have MIT Figure attach an...
  • Page 135 Mbps the ring or 16 either the port speed speed is set different which down will cause the ring beacon and makes brings the ring inoperable effectively 7513 Hardware Maintenance 3-14 Cisco Installation...
  • Page 136 Cables Interface Connecting FDDI Connections Both and multimode be combined connections are available on one FTP The single-mode cable connects Single-mode uses separate transmit receive fiber-optic directly ports need cables will cables single-mode single attachment connection or four cables dual attachment Multimode connection uses...
  • Page 137 FDDI from shows interface 3-16 the connections dual prevent Figure initializing multimode and attachment uses both fiber that single-mode FDDI 3-13 Ports Figure Secondary Secondary Primary Primary FORMAC 3-16 Cisco 7513 Hardware Maintenance Installation...
  • Page 138 Cables Interface Connecting whether Depending multimode are connecting upon fiber network single-mode connect follows Single-modeObserve scheme standard connection described previously refer 3-14 while follows Figure connect the interface cables Connect the cable from the primary the primary coming from ring ring receive port upstream...
  • Page 139 Single-Mode Figure Mixed-mode connectors Transmit configurations multimode To single-mode cables single-mode network mixed-mode Receive configurations To multimode network switch the next section Otherwise are connecting optical bypass proceed proceed Console Terminal this Connecting chapter 7513 Hardware Maintenance 3-18 Cisco Installation...
  • Page 140 Cables Connecting Interface Switch Bypass Installing Optical switch device between optical bypass installed the ring station that provides network additional tolerance fault connected switch that or shuts bypass fails down the bypass switch activates allows automatically signal through light pass directly it bypassing switch...
  • Page 141 PIP Connect each of the adapter cable of the control cable mini-DIN connect of the adapter cable mini-DIN bypass port optical 7513 Hardware Maintenance 3-20 Cisco Installation...
  • Page 142 Caution problems do prevent system install Serial Interface Processor also called SX-SIP PRE-FSIP 7513 Cisco chassis This early interface your not supported processor be used 7513 CyBus cannot the Cisco chassis the Router 3-21 Installing...
  • Page 143 HSSI between connect the router interface cable network port HSSI Both ends of the interface cable same connect either orDSU 3-21 Figure HSSI Network Connection 3-21 Figure HSSI cable network 13 E3 SONET DSU 7513 Hardware Maintenance 3-22 Cisco Installation...
  • Page 144 HSSI cable larger null available ports in routers separate The two must be 3-22 routers in the same be two Figure Cisco 7513s location Cisco When each 7000s you must the ports enable internal configure transmit clock HSSI in the...
  • Page 145 Auxiliary Port Connecting DB-25 modem port for connecting or other device such auxiliary port plug CSUIDSU above or other router the router located RSP2 the console port port modem shown connection 3-24 example Figure 3-24 7513 Hardware and Maintenance Cisco Installation...
  • Page 146 Cables Interface Connecting Cables Console and Using Connections Auxiliary two RSP2s with and one master slave in installed systems slots RSP2s connect console or auxiliary ports both simultaneously cable using special CAB-RSP2CON CAB-RSP2AUX RSP2 master/slave switch designates RSP2s either system master or slave shows...
  • Page 147 RSPK Software Version 10.3571 1986-1995 Cisco Systems Copyright 1106 10-May95 Compiled 7513 Hardware Maintenance 3-26 Cisco Installation...
  • Page 148 Router Starting When the router for the Step start time system enters the setup first automatically command which which determines interfaces and prompts you installed facility one On information for each the console configuration terminal after system displays and hardware the system banner see the following...
  • Page 149 Router setup this procedure refer using Products facility Guide for Cisco Release Router Configuration 11.0 Products Started Guide for Getting Cisco Release 11.0 publications know the filename image you wantyou want of the...
  • Page 150 Router tenninal config Routerconfig boot system Routerconfig boot flash system slotOnew.iinage config Router Router copy running-config startup-config Router reload When from reloads boot the Flash memory card in Slot will system image new.image 7513 Hardware Maintenance 3-30 Cisco Installation...
  • Page 151 Bootable Images between Copying Memory Cards Flash Bootable Images between Cards Flash Memory Copying future releases of Cisco lOS images become receive these available will either images from booted network card disk Flash file server file memory file floppy scenario...
  • Page 152 Router config Routerconfig boot system Routercontig boot flash slotOimage.new system config Router Router running-config atartup-config copy Router reload When from the Flash card Slot memory the system boot image.new reloads will file 7513 Hardware Maintenance 3-32 Cisco Installation...
  • Page 153 CHAPTER Installation Troubleshooting Your went router extensive burn-in before the factory However through testing leaving encounter use the information problems cause Problems in this isolate starting chapter help with most initial caused the source startup will or an interface likely power that processor...
  • Page 154 Refer chart Figure this to this strategy chapter follow resolve to isolate problems subsystem problem necessary steps specific possible Problems Troubleshooting for Startup Figure Strategy 7513 Hardware Maintenance Cisco Installation...
  • Page 155 Overview Troubleshooting Troubleshooting Overview This section describes the troubleshooting methods used defines in this the router chapter divided more into problem subsystems efficient solving Problem Solving with Subsystems The key problem solving isolate system try to problem subsystem specific compare what problems the system what...
  • Page 156 24VDC down shuts two minutes about there with line message after problem module blower Proceed Power in this the section Troubleshooting Subsystem chapter 7513 Hardware and Maintenance Cisco Installation...
  • Page 157 Router Connecting Installing that verify terminal connected RSP2 that console correctly properly port 4.65 Bootstrap Version System SOFTWARE 1986-1995 Copyright cisco Systems RSP2 with 16384 processor Kbytes memory text omitted 201235647852194864 Oxl000 Restricted Rights Legend Troubleshooting Installation...
  • Page 158 Router Power Supply the chapter Maintaining Replacing then return replacement power supply faulty goes are unable resolve determine that either problem power power supply cable contact service representative for instructions faulty 7513 Hardware Maintenance Cisco Installation...
  • Page 159: The Blower Module

    Troubleshooting Cooling Subsystem Troubleshooting Cooling Subsystem Check the following isolate help problem When does start blower go system whether blower determine blower motor for the operating listen In noisy environments near the middle of the front of the chassis the interface panel opposite plastic...
  • Page 160 RSP2 normal the system software the system initialized successfully operational RSP2 halt hardware normal the system has detected failure should This processor operation Contact service instructions representative 7513 Hardware and Maintenance Cisco Installation...
  • Page 161 Processor Troubleshooting Subsystem Processors Interface Troubleshooting Check the following isolate problem help LEDs interface enabled processor the system Proceed the instructions operational the interfaces configuring software documentation appropriate Are any LEDs interface enabled processor LEDs check RSP2 any of the enabled normal which be on...
  • Page 162 Processor Subsystem Troubleshooting 7513 Hardware 4-10 Cisco Installation Maintenance...
  • Page 163 CHAPTER Router Maintaining the This maintenance for the router chapter provides procedures modules processor Your router order replaceable parts spare configured ready installation your startup when leaves the factory In the future communication want your requirements change system add components upgrade change This...
  • Page 164 7513 downloadable Cisco upgrades supports memory You them in Flash then download microcode images store remotely microcode image from...
  • Page 165 Processor Modules Installing Configuring When you remove insert interface the backplane send notify the processor pins signals system which then follows perfonns the backplane Rapidly scans for configuration does interfaces changes reset inserted Initializes interface newly any removed interfaces processors noting placing them...
  • Page 166 Place the collapsible black-cardboard board racks Note that processor shown with in Figure material provided your packing Board Rack Processor Modules with Figure 7513 Hardware Maintenance Cisco Installation...
  • Page 167 Processor Modules Installing Configuring Tools Required need number will or 3/16-inch flat-blade screwdriver any blank remove Phillips interface carriers the captive processor fillers tighten screws the interface installation that secure slot Most interface carriers processor screws some were slotted processor manufactured with Whenever...
  • Page 168 MAS-RSPBLANK One RSP with each system shipped single-RSP2 filler Levers and Screws Installation Figure Ejector Captive Bottom lever ejector Processor Processor module module slot carrier guide Captive installation screw STOPI contact 7513 Hardware Cisco Maintenance Installation...
  • Page 169 Processor Modules Installing Configuring Processors Interface Installing install interface of the interface numbered processor slots processor through from from end See through left to the chassis the interface viewing right processor RSP2 Slots Figure contain only an Following installation steps for the interface which be removed while...
  • Page 170 Interface EthernetO/l down %LINK-5-CHANGEIJ changed state administratively %LINK-5--CHANGED Interface Ethernet0/5 state down changed administratively Router %OIR-6-INSCARD Card inserted slot interfaces administratively shut down %LINK-5-CHANGED Ethernet0/l Interface changed state %LINK-5-CHANGED EthernetO/5 Interface changed state 7513 Hardware Maintenance Installation Cisco...
  • Page 171 Processor Modules Installing Configuring Microcode Component Replacement Each interface microcode which contains default firmware processor image of board-specific EPROM software instructions board Microcode each single with the system operates software controls features functions an interface that unique type processor and enhancements features the system are often...
  • Page 172 Step remove from extractor the socket PLCC-type component chip removed foam Place or into antistatic component antistatic microcode Step in the socket with notched Insert component in the same orientation the previous component 7513 Hardware 5-10 Cisco and Maintenance Installation...
  • Page 173 Processor Modules Installing Configuring Step replace the interface follow the steps in the section processor Interface Installing Processors in this chapter the enabled Step that on and Verify remains interface does processor goes use the immediately levers the interface to eject in the ejector processor...
  • Page 174 Installation Troubleshooting troubleshooting procedures 7513 Hardware Maintenance 5-12 Cisco Installation...
  • Page 175 Processor Modules Installing Configuring RSP2 Configuring RSP2 This section describes the following maintenance of the aspects and removing Flash card memory Installing the software Making changes configuration register DRAM SIMMs Replacing and Removing Card Flash Memory Installing RSP2 might become replace or Flash card...
  • Page 176 Configuring Installing press the appropriate button Step card 5-5c eject ejector Figure Remove from the card slot antistatic Step place protect Note cards Series Flash Intel memory only Card Flash Memory Removing Figure Installing 7513 Hardware 5-14 Cisco Maintenance Installation...
  • Page 177 Processor Modules Installing Configuring Changes Making Software Configuration Register This section describes the software RSP2 used with that virtual configuration register the information included Following this section Software configuration register settings of boot field Explanation Changing configuration register settings Software meanings configuration register...
  • Page 178 Table in the following Routerconfig Oxvalue config-regiater mode Ctrl-Z The value saved Step Exit the configuration will entering settings the system reloaded effect until however not take software memory settings the router rebooting 7513 Hardware Maintenance 5-16 Cisco Installation...
  • Page 179 Router server creates default boot filename part of the automatic To form configuration processes the boot the server name filename with cisco adds starts of the boot octal field equivalent number name hyphen the processor-type Table the default lists...
  • Page 180 Address ones ones zeros zeros zeros ones Bits baud 12 in the configuration determine of the console terminal Table rate register shows baud baud 9600 thefour available rates default factory-set rate settings 7513 Hardware Maintenance 5-18 Cisco Installation...
  • Page 181 Processor Modules Installing Configuring Baud Table System Console Rate Terminal Settings Baud 9600 4800 1200 2400 Bit 13 determines the server bootload failure Setting causes the server load response software from Flash unsuccessful memory after five from operating load boot attempts file network...
  • Page 182 The squeeze which log of of these functions been performed that operation keeps on sudden power come back process The continue with failure place right command character means the successful this erased after operation squeeze 7513 Hardware 5-20 Cisco Maintenance Installation...
  • Page 183 Processor Modules Installing Configuring 0x2101 configuration the system boot the default tells image the register setting image first from onboard Flash Break check but does disable memory reset default netboot filename 0x2102 the system from configuration tells boot Flash register memory setting netboot...
  • Page 184 About This preface SIMM SIMMs manufacturers are defined numbers must Although specifications part meet the following requirements DRAM SIMMs approved vendor must be from obtained Minimum 60 nanoseconds speed Maximum one inch height 7513 Hardware and Maintenance 5-22 Cisco Installation...
  • Page 185 Processor Modules Installing Configuring Parts Tools Required need SIMMs the following you need tools additional replace equipment contact parts customer service representative information ordering Medium and number fiat-blade screwdriver loosen the captive Phillips installation screws RSP2 the chassis cover SIMMs 60-ns one-inch from...
  • Page 186 RSP2 from device such wrist strap Position the handle that away toward shown connector the opposite of the position this edge Figure DRAM SIMMs SIMMs Bank Locate Step occupy Bank Figure 7513 Hardware Maintenance 5-24 Cisco Installation...
  • Page 187 Processor Modules Configuring Installing SIMM Step Release the spring from SIMM you want remove that release the clips from the socket Figure SIMM Releasing Figure Spring Clips tabs away with Pull your thumbs your bracing forefingers against Connector Raise SIMM edge posts card...
  • Page 188 SIMM the socket the spring Step push into until Gently over the ends of the clips snap SIMM SIMM back rock forth seat necessary gently properly SIMMs for the remaining Step Repeat Steps through 7513 Hardware 5-26 Cisco Maintenance Installation...
  • Page 189 Processor Modules Installing Configuring When SIMMs check SIMM Step on each are installed holes alignment ensure SIMM the spring retainer SIMM that visible not seated properly SIMM remove Push misaligned reseat the socket appears carefully firmly back the socket into until retainer into...
  • Page 190 Ox7B hexadecimal hexvalue virtual filter path vp-filter Receive rxbuff buffers Transmit txbuff buffers Maximum 2048 number atm maxvc AAL5 aal5 encapsulation cell size queue rawq-size 1024 vc-per-vp G.804 interface framing framing g751 7513 Hardware Maintenance 5-28 Cisco Installation...
  • Page 191 Processor Modules Configuring Installing new AlP After verify that is installed enabled use the correctly goes command configure interface with the information configure prepared will maximum need such the interface IP address transmission unit size Adaptation mode desired Layer rate queues Command Using...
  • Page 192 ATM4/O %WARNING rate disabled queues combined rates exceed interface bandwidth physical layer queue follows will maximum warning appear message %WANINGATM4/O Total rate allocation exceeds maximum queue nhbps nMbps 7513 Hardware Maintenance 5-30 Cisco Installation...
  • Page 193 Processor Modules Configuring Installing Values Default Changing The AlP default be changed match values network environment Perform the tasks your the following you need sections customize Interface Selecting Setting the Size SONET Configuring Framing Interface Local Loopback Configuring Setting the Reassembly Buffers Framing on...
  • Page 194 Autonomous of IP packets switching Pseudobroadcast for multicast packets support These enabled interfaces features can turned fast default switching switching commands Autonomous must be off with interface enabled configuration switching explicitly each interface 7513 Hardware Maintenance 5-32 Cisco Installation...
  • Page 195 Processor Modules Installing Configuring Permanent Virtual Circuit Configuration PVCs the router into remain configured removed from active until circuit PVCs configuration also connection switch require permanent PVCs When virtual circuit characteristics apply the configuration configured PVCs NVRAM These options passed are writable into the nonvolatile when...
  • Page 196 All other cells will cells will incoming processing AAL5 reassembled processing Address Protocol Mapping can be scheme remote This address address hosts/routers mapping identifies specified NSAP or an address either operation 7513 Hardware and Maintenance 5-34 Cisco Installation...
  • Page 197 Processor Modules Installing Configuring commands Enter mapping groups multiple entries exist create list First then associate the with name command list an interface Enter the map-list list then enter the protocol protocol address other variables follows map-list name protocol protocol address atm-vc atm-nsap...
  • Page 198 AAL5SNAP ATM4/0 2722 AAL5SNAP ATM4/0 show atm where command statistics display given follows Router show ATM4/0 Flags 0x34 VCIJ AAL5 etypeOxBAD PeakRate 32cells Rate Burst Vcmode OxE200 Average Broadcasts InPkts OutPkts InFest OutFast 7513 Hardware and Maintenance 5-36 Cisco Installation...
  • Page 199 Processor Modules Installing Configuring show command when from following sample output specified AAL3/4 SMDS enabled been subinterface defined message range numbers MIDs identifier been assigned Router show ATM4/0.1 etype0x1 SMDS Flags APL3/4 0x35 PeakRate Rate Burst 32cells VCmode Average 0xE200 start InPkts OutPkts...
  • Page 200 However does not necessarily an interface you change the adapter cable line repoll 7513 Hardware Maintenance 5-38 Cisco Installation...
  • Page 201 Processor Modules Configuring Installing ensure down that system interface type you must shut recognizes reenable When the cable interface after interface mode changing or changing setting from when interface you must the clock loopback also test setting rate interface commands also use software invert the clock necessary...
  • Page 202 32-bit use the diag Number Hardware indicates Part 81-0050-01 Version cannot use the resulting display CRC-32 Number 81-0050-02 Hardware 1.1 you feature the display indicates Part Version CRC-32 use the feature Hardware Maintenance 7513 5-40 Cisco Installation...
  • Page 203 Processor Modules Installing Configuring numeric calculated that error-checking technique uses value detect errors Because transmitted data 32-bit transmits longer data streams at faster rates provides better ongoing detection However with retransmits both the sender error less receiver must same default interfaces all serial 16-bit...
  • Page 204 LEDs remain interface will the clock will the interface not function will until mode clock of the default rate regardless 7513 Hardware Maintenance 5-42 Cisco Installation...
  • Page 205 Processor Modules Installing Configuring mode of the interface from you do need changing change the clock for the port After replace the rate cable with cable system recognizes interface use the external from remote will clock device signal ignore clock internal that interface...
  • Page 206 You may Remove them need them aside to install Step the jackscrews washers port adapter standoff and remove screws Step screwdriver loosen Figure Phillips need will the standoff screws install port adapter and Maintenance 7513 Hardware Installation 5-44 Cisco...
  • Page 207 Processor Modules Installing Configuring While Step contact with thumb and traces avoiding components board insert your holes of the port adapter into sides forefinger the port finger lift gently upward adapter connectors the port adapter dislodge resists rock very from side side free of the...
  • Page 208 Step lockwasher each jackscrews Install the four jackscrews the front of the Step 10 insert the front of the through carrier faceplate of both port connectors into the holes either side faceplate 7513 Hardware Maintenance 5-46 Cisco Installation...
  • Page 209 Processor Modules Installing Configuring When screws connectors Step aligned properly screwdriver tighten Phillips the standoff 3/16-inch screws nut driver the four tighten jackscrews of the screws overtighten Step Proceed the next section FSIP the chassis to reinstall 5-10 FSIP Port Figure Installing Adapters...
  • Page 210 Step After configure command of the interfaces status display command procedure For This completes the port adapter complete descriptions replacement documentation the related software refer instructions 7513 Hardware Maintenance 5-48 Cisco Installation...
  • Page 211 Processor Modules Installing Configuring Configuring new MIP installed you want change the configuration of an existing controller must enter the configuration mode that replaced previously configured new MIP will recognize the existing configuration system bring new MIP After that installed verify enabled use the...
  • Page 212 This could of severe that risk default directly setting pose injury J6 has no jumper installed safety Removing After jumper the section proceed Port Adapters Replacing replace port adapter 7513 Hardware 5-50 Cisco Maintenance Installation...
  • Page 213 Processor Modules Installing Configuring Commands Using Configure are instructions for Following that enables controller configuration IP routing specifies also need might enter other configuration subcommands the requirements for your depending the protocols configuration route the interface must system plan channel-groups be mapped before controller can...
  • Page 214 Processor Modules Configuring Installing 7513 number Note Cisco interfaces routers identify serial slot interface channel-groups number slots channel-group through through applique processor For example in the the address of the Ti and format slot/portchannel-group 4/15 would with interface slot installed...
  • Page 215 Processor Modules Installing Configuring assign an IP address Step mask prompt subnet the interface with the ip address subcommand the following configuration example Routerconfigif ip address 1.1.1.1 255.255.255.0 Routerconfigif Step additional subcommands enable configuration required routing protocols adjust the interface characteristics After including Step...
  • Page 216 Router show vera RSP-K Software Version 10.3571 1986-1994 cisco Copyright Systems 10May95 1552 Compiled 4.61 Bootstrap Version System SOFTWPRE Router uptime minutes restarted System reload System image file myfilegs7-k booted from 1.1.1.1 tftp 7513 Hardware 5-54 Cisco Maintenance Installation...
  • Page 217 Processor Modules Configuring Installing RSP2 Risc 4600 with 16384K X.25 software processor bytes memory Version NET2 software GOSIP compliant Bridging Processor Route Switch controller Ethernet Ring TRIP controller Token Serial FSIP controller controller forth Ethernet/IEEE 802.3 interfaces interfaces Token 802.5 Ring/IEEE interfaces Serial...
  • Page 218 El linecode b8zs hdb3 forth 1357 channel-group 2468-10 channel-group interface Ethernet ipaddress 1.1.1.1 255.255.255.0 enabled interface Ethernet ip address shutdown interface Ethernetl/2 ip address shutdown interface Ethernetl/3 display omitted text 7513 Hardware Maintenance 5-56 Cisco Installation...
  • Page 219 Configuring Processor Modules Installing The show command displays the global protocols system-wide interface-specific status Level configured protocol Router show protocols Global values Internet Protocol routing enabled address CLIPS routing enaiDled 4l.0000.0000.0000.000l.i000.000000 Fddi0/0 down line is down protocol Internet address 1.1.1.1 subnet mask 255.255.255.0...
  • Page 220 5-12 the following refer port adapter Figure steps foam You Ensure should Step that antistatic antistatic resting still ESD-preventive wearing strap shown 5-12 Position in the orientation in Figure Step that same 7513 Hardware and Maintenance 5-58 Cisco Installation...
  • Page 221 Processor Modules Installing Configuring be removed and Step Locate port adapter 3/16-inch nut driver loosen side of the cable jackscrews one on either connector 5-12 Figure 5-12 Removing Figure Port Adapter screws Standoff Board stiffener shield Jackscrews Remove the jackscrews Step them washers...
  • Page 222 As shown back the cable connector of the cutout 5-13 insert Step partially through Figure not force the cable connector the cutout carrier through until faceplate standoffs connector aligned 7513 Hardware 5-60 Cisco Maintenance Installation...
  • Page 223 Processor Modules Installing Configuring With Step the cable connector inserted the faceplate back into lower partially cutout slowly side of the port adapter opposite Continue the cable ease connector the cutout through until connector meet the standoffs port adapter with are aligned the standoff holes...
  • Page 224 Using Show Commands commands Status Verify the section refer earlier this commands Router the options Products refer complete descriptions available Command Guide and Router Products Configuration publication Reference 7513 Hardware Maintenance 5-62 Cisco Installation...
  • Page 225 Replace unit cooling through interior this blower the control board fails front-panel PWR-7513-DC Power the 1200-watt supply DC-input power supply Power 1200W supply AC-input power Depending the type cable supply power the order number...
  • Page 226 Note arbiter spares which part of the card assembly considered backplane only cage Cisco-certified service removed/replaced provider Tools Materials Required of the You need internal the following tools replace spares blower module and power...
  • Page 227 Removing Replacing Chassis Components Follow blower module these steps replace blower which Locate module Step above the card the interface cage processor the chassis 5-14 Figure Step fiat-blade screwdriver loosen the captive screws fasten each of the that module See blower 5-14 Figure...
  • Page 228: Removing Power Supply

    Step Grasp power supply supply power pull hand eight inches then with other under power supply approximately your out of the 5-16 completely Figure pull Power SupplyAC-Input Power Shown 5-16 Supply Supporting Figure 7513 Hardware and Maintenance 5-66 Cisco Installation...
  • Page 229 Replacing Chassis Removing Components Caution maintain and meet agency compliance emissions requirements standards Cisco 7513 chassis with must remain single blank power supply power supply power 5-17 Do supply adjacent power remove blank from supply Figure this you do chassis unless...
  • Page 230 12OVAC racks minimum equipment AC-input power supplies 20-amp operating require service with The power 20-amp cable receptacle source with the chassis uses power supplied 20-amp plug 7513 Hardware 5-68 Cisco Installation and Maintenance...
  • Page 231 Removing Replacing Chassis Components When Step AC-input power cable cable leads are DC-input power reconnected reconnect cable source turn power power power power supply rotating the switch power clockwise position DC OK LEDs will 5-19 stay Figure fail might momentarily few seconds will after...
  • Page 232 2-42 Figure Remove board modules from them Step the card cage carefully place processor material 5-20 Do racks with not stack your original packing Figure supplied modules top of another one on processor 7513 Hardware Maintenance 5-70 Cisco Installation...
  • Page 233 Removing Replacing Chassis Components With modules Step the processor removed loosen the four large supplies power captive screws located of the card left opening right cage Figure 5-21 Removing Card Figure Cage Replacing Backplane Assembly screw Caution mounted Unless the chassis rack or otherwise anchored...
  • Page 234 5-21 the chassis opening into assembly Figure carefully slide components the card assembly This the procedure removing backplane replacing cage completes 7513 Hardware Maintenance Cisco Installation 5-72...
  • Page 235 PPENDIX Cabling Specifications This appendix the pinouts for ports RSP2 lists EIP FEIP TRIP FIP and for the serial HSSI interface cables each that FSIP and connect the external network All pins port mentioned connected listed are not specifically of the signal summaries Following contained...
  • Page 236: Auxiliary Port Signals

    Auxiliary Signals Direction Signal Description used hardware flow To Send control Request used hardware To Send flow control Clear Ground Ground Signal Signal modem Detect used Carrier control modem Data Terminal Ready used control only 7513 Hardware Maintenance Cisco Installation...
  • Page 237 Note dual-RSP2 This not available with release of the RSP2 functionality initial processor The two CAB-RSP2CON cables CAB-RSP2-AUX ship with the Cisco 7513 chassis available console Y-cable spare parts pinouts listed Table the auxiliary Y-cable in Table listed pinouts...
  • Page 238 Control Out not used Circuit CO-S Control Out Circuit Shield not used Cl-A Control In Circuit Cl-B Control In Circuit Cl-S Control In Circuit Shield Common Voltage Voltage Plus Shield Voltage Ground Shell Protective 7513 Hardware and Maintenance Cisco Installation...
  • Page 239 Fast Ethernet Connector Signals Fast Ethernet Connector Signals The two FEIP connectors type and 40-pin D-shell RJ-45 single single either or the other Only one one time Each connector used connection supports IEEE 100BASE-X 100BASE-T 802.3u interfaces with The RJ-45 compliant standards connection...
  • Page 240: Token Ring Port Signals

    Installation the section the chapter Installing Preparing Router Switch Table Bypass Pinout Optical Description switch secondary primary switch Ground primary switch to enable Ground switch to enable secondary kohm Sense circuiti GroundSense circuit return 7513 Hardware Maintenance Cisco Installation...
  • Page 241: Serial

    Serial Adapter Cable Pinouts Adapter Cable Pinouts Serial The FSIP EIA/TIA-232 X.21 supports EIA/TIA-449 V.35 EIA-530 and E1-G.703/G.704 serial interfaces FSIP universal which ports use port adapter 60-pin receptacle that available supports interface this is E1-G.703/G.704 which types exception DB-15 uses port adapter connector...
  • Page 242 LLIDCD DCD/LL LTST LTST Notused Notused Notused Notused DTRIDSR DSR/DTR Not used Not used Not used Not used TxCEITxC TxCE TxCE RxC/TxCE Notused Notused Notused Notused Mode Mode Ground Ground Shorting group group Shorting Mode_DCE 7513 Hardware Maintenance Cisco Installation...
  • Page 243 Adapter Cable Pinouts Serial Table A-Il EIA/TIA-449 Adapter Cable Signals FSIP Network End HD FSIP Network 60-Position Cable DB-37 Plug Cable 60-Position Plug DB-37 Plug Receptacle Signal Signal Signal Signal Shield ground Shield Shield ground Shield ground ground TxDIRxD RxD/TxD TxDIRxD RxD/TxD TxCIRxC...
  • Page 244 TxCIRxC RxC/TxCE Timing-I Timing RxC/TxCE TxC/RxC Timing Timing Circuit ground Circuit ground Circuit ground Circuit ground Ground Ground group Shorting Shorting group Mode_2 Mode_2 Ground group Shorting Mode_DCE Not used used Not used Not used 7513 Hardware Maintenance Installation Cisco...
  • Page 245 Adapter Cable Pinouts Serial A-13 Table V.35 Adapter Cable Signals Network End HD End HD FSIP Cable Network FSIP Cable 34-Position 60-Position Plug 34-Position Plug 60-Position Plug Receptacle Signal Signal Signal Signal Shield ground Shield ground Shield ground Shield ground Circuit ground Circuit...
  • Page 246: Adapter Cable Pinouts

    DSRJDTR DSRIDTR DCDIDCD DCDIDCD TxCIRxC TxCIRxC RxC/TxCE RxC-1- RxC/TxCE LLIDCD Ground Circuit Circuit ground DThIDSR DTRJDSR TxCE TxCE/TxC TxCE TxCE/TxC Mode_i Ground Shorting group Mode_2 Ground group Shorting Mode_DCE Notused used Notused Not used A-12 7513 Hardware Maintenance Cisco Installation...
  • Page 247 Serial Adapter Cable Pinouts A-15 shows Table E1-G.703/G.704 pinouts for each type of interface cable All cables signal DB-15 D-shell FSIP end 15-pin connector A-15 Table E1-G.703/G.704 Adapter Cable Connector Pinouts FSIP End Network Modem Null DB-151 DB-15 DB-15 Twinax Signal2 Signal Signal...
  • Page 248: Hssi Connector Signals

    Receive Data Reserved Loopback Circuit Send Timing Ground Signal Available Terminal Timing Circuit Loopback Send Data Circuit Loopback Ground SG-Signal 3943 1418 Ancillary Ground Signal 2024 4549 from Ancillary Ground Signal Router side side A-14 7513 Hardware Maintenance Cisco Installation...
  • Page 249: Null

    Signals Modem Cable Null modem null cable -HNUL back back The two connect routers routers directly must be be two 7513 location Cisco same 7000 chassis Cisco series chassis modem each null connection HSSI allows verify the operation of the...
  • Page 250: Mip

    Tx-i Tx-2 shield ring ring ring ring shield shield shield shield Shield Rx-i Rx-2 shield ring ring ring ring shield shield Shield shield shield are not connected not described pins this table transmit receive Hardware Maintenance A-16 7513 Installation Cisco...
  • Page 251: Led

    PPENDIX Reading Indicators This appendix sunm-lary of indicators used LEDs provides in the router and on RSP2 front panel indicate the system LEDs power and status processor interface indicate of the individual interface processors status interfaces processor LEDs Front Panel Three LEDs the front of the router...
  • Page 252 Power LEDs Supply LEDs Power Supply Each 7513 There types of for the Cisco power power supplies input input DC OK LEDs AC shown supply contains the following output fail Figure Shown Power Power LEDsAC-Input Supply Supply Faceplate Figure Power...
  • Page 253: Rsp2 Leds And Reset Switch

    RSP2 LEDs Reset Switch RSP2 LEDs and Reset Switch LEDs The two RSP2 which shown RSP2 in Figure indicate the system status The normal indicate the system During normal that goes operational operation RSP2 halt should unless the detects hardware system stay processor...
  • Page 254: Alp Leds

    When cell This will indicates has received flicker cells that normal traffic operation indicating When cable For indicates has detected fiber carrier that carrier means detected this that optic interface simply light 7513 Hardware Maintenance Cisco Installation...
  • Page 255: Cipleds

    Processor LEDs Interface LEDs The CIP LEDs an enabled and two banks Figure for each interface be any ESCON interfaces bus and LEDs combination tag or indicate status specific these interface types LEDs Figure LEDs Following are the functions of the Figure EnabledIndicates been...
  • Page 256 Present Loaded Online Signal Port Port microcode indicates downloading that following sequence Present Loaded Online Signal Port Port microcode indicates execute that starting following sequence Online Present Loaded Signal Port Port 7513 Hardware Maintenance Installation Cisco...
  • Page 257 LEDs Processor Interface LEDs LEDs The EIP contains bank LEDs horizontal for each of the Ethernet shown interfaces Figure with the other interface when the enabled enabled processors goes operation LEDs Figure LEDs Three for each port indicate the following CollisionA frame been...
  • Page 258: Leds

    MITLights port port from network when FEIP LinkLights carrier receiving signal when RJ45 the active port the controller selected RJ-45Lights port both RJ-45 be on one time or the should never Either 7513 Hardware and Maintenance Cisco Installation...
  • Page 259: Fipleds

    LEDs Processor Interface LEDs LEDs The FTP shown LEDs the top indicate state Figure those bottom indicate above state interface also interface the face of the with the other interface when the enabled processors goes enabled for operation LEDs Figure LEDs of each pair of...
  • Page 260 Dual with active which normal Single plus both condition plus homed attachment attachment Dual failed Single Single plus homed attachment Dual attachment Single failed Single plusAon means means means does not apply Refer Figure patterns 7513 Hardware Maintenance Cisco Installation...
  • Page 261 LEDs Processor Interface LEDs FSIP The FSIP LEDs shown with the other interface the enabled Figure processors when FSIP However enabled for operation unlike cluster goes other interface LEDs for each port are adjacent the connector Table processors serial descriptions lists of each LEDs...
  • Page 262 FSIP becomes interface cable connected to it If type port cable connected port with clock will ignore the clock rate rate from remote the external clock sent signal that B-12 7513 Hardware Maintenance Cisco Installation...
  • Page 263: Hipleds

    LEDs Processor Interface LEDs LEDs HSSI Four the lilPindicate of the interface with the other interface state processors when the enabled LEDs HSSI enabled four above goes operation port B-li indicate the following Figure TimingWhen Receive indicates has detected Receive Clock that signal During normal...
  • Page 264: Mipleds

    Local loss or unavailability errors loss from remote end due Remote alarmIndicates remote alarm received local alarm remote controller LoopIndicates local loopback B-14 7513 Hardware and Maintenance Cisco Installation...
  • Page 265: Trip Leds

    LEDs Processor Interface LEDs TRIP TRIP LEDs shown Each LEDs Token Figure horizontal of three each indicates the speed or 16 Mbps Ring interface of the interface whether the interface inserted the ring into B-13 LEDs TRIP Figure TRIPs whether bank LEDs or four ports...
  • Page 266 LEDs Processor Interface B-16 7513 Hardware Maintenance Cisco Installation...
  • Page 267 PPENDIX Plans lndustry-Standard Wiring When more than face install terminals of organizing problem wiring uniform scheme has devised for the telephone numbers wires for dealing with industry large codesone The scheme uses color for large numbers of wires organized the other pairs numbers which...
  • Page 268 Orange Yellow Orange Green Yellow Green Yellow Brown Yellow Brown Yellow Yellow Slate Yellow Slate Blue Violet Blue Violet Violet Orange Violet Orange Green Violet Green Violet Brown Violet Brown Violet Violet Slate Slate Violet 7513 Hardware Maintenance Cisco Installation...
  • Page 269 Cables with more than of wires from have are constructed large cables 25-pair pairs groups Very other variations not encountered inside terminal wire generally plants numbers smaller wires such wires for an individual station or terminal telephone second color code scheme code Table...
  • Page 270 7513 Hardware Maintenance Cisco Installation...
  • Page 271 INDEX Numerics 3-11 filter clip installation 2-22 commands 5-365-38 information LEDs 100BASE-FX linkloss 2-11 100BASE-T EPROM microcode 5-10 location 100BASE-TX size 5-31 1OBASE-2 multimode and single-mode 2-12 transmission network Ethernet descriptions network connections 3-10 1OBASE-5 PLIMs 2-24 2-23 See Ethernet network connections 2-10 budget...
  • Page 272 CAB-FMDD FDDI 2-35 cable FSIP 2-20 bypass 1-26 optical modem CAB-HNUL HSSI 2-20 A-iS null cable guidelines modem HSSI 2-47 interface null interference lobe Token Ring 2-32 lobe thumbscrews 2-41 metric RJ-45 FEIP 2-29 MIII 7513 Hardware Maintenance Cisco Installation...
  • Page 273 2-32 Token Ring See CIP patch command A-1--A-16 5-53 pinouts channel-group 5-52 5-52 safety guidelines channel-groups A-14 CHAS-7513 SCSI-il and 2-47 with AC-input power chassis spare 2-40 5-63 serial supply FDDI CHAS-7513-DC 2-34 single-mode with DC-input chassis power spare...
  • Page 274 2-34 conn release early 5-51 enable 5-16 5-22 connecting 3-83-24 5-17 Flash-related interface cables fortheMiP 5-51 power 5-53 framing 5-52 3-23 hssi internal-clock 5-21 initialize 5-29 interface 5-40 invert-transmit-clock 5-54 ip address 5-53 5-53 linecode 7513 Hardware Maintenance Cisco Installation...
  • Page 275 connector agency approvals CSMAICD 2-25 2-25 description 2-20 1-16 auxiliary port console 1-16 port current rating DB-15 2-25 Customer Center Response DB-9 TRIP 2-31 numbers phone e-mail address CxBus description E1-G.703/G.704 CX-FIP-MM connections 3-19 1-27 bypass switch optical EIAITIA-232 1-26 2-44 bypass switch connections 3-19...
  • Page 276 2-34 approvals agency 2-33 description 2-17 chassis cover EEPROM interface carriers processor 1-16 description 2-22 filter clip installation bank address 1-34 shielding command enable 5-51 5-22 B-4B-l4 enabled interface processors 7513 Hardware Cisco Maintenance Installation...
  • Page 277 environment 2-15 command site 3-14 ring-speed environmental monitor show command 1-39 cxbus 5-42 description controller EPROM show command cxbus controller 5-11 output microcode 5-10 show command environment 1-43 output microcode show command replacement environment 1-42 output show 5-40 error detection 2-43 command environment...
  • Page 278 3-21 5-39 5-42 1-28 rates speeds 5-385-48 configuration troubleshooting 2-41 command connectors using show 5-40 diag HSSI 1-24 description also 5-39 speed interface pinouts LEDs B-il EPROM microcode 5-10 location modes and timing 2-43 7513 Hardware Maintenance Cisco Installation...
  • Page 279 HSSI interface A-14 cable pinouts addresses 1-31 2-47 connectors cables EIAITIA-6 12/613 1-28 2-13 3-83-24 connections EIAITIA-612/613 2-13 standard and equipment tools Processor Interface configuration disabled 1-36 LEDs B-13 loopback 5-31 configuring network connections 3-22 1-17 illustration processors modem null cable down A-15...
  • Page 280 3-13 cable command 5-53 linecode cable specifications LinkLED FEIP 2-29 connections 2-11 linklossAIP loaded pinouts lobe cables mini-DIN connector 3-19 1-24 pinouts Token 2-32 Ring and Type 2-31 Type alarm B-14 local 7513 Hardware Maintenance Cisco Installation...
  • Page 281 VRAM connections 3-23 cable 1-15 description A-16 cable 1-40 pinouts 2-40 cables 2-39 commands 5-51 5-495-62 configuration connection 2-39 equipment 1-29 description command 5-21 reset 5-50 direct current isolation 2-39 cable functional 1-35 description LEDs B-14 interface 1-17 processor support EPROM microcode 5-10...
  • Page 282 PLCC IC on FSIP environmental monitor 1-39 PLIMs 2-24 1-19 2-20 2-23 description 3-26 port LEDs 2-25 PWR-7513-AC 2-44 5-63 1-16 auxiliary spare PWR-7513-AC console 5-63 for Italy 1-162-47 spare PWR-7513-ACA EIAITIA-232 5-63 1-26 Australia spare EIATHA-449...
  • Page 283 1-14 memory 13-AC PWR-75 5-63 normal 1-16 power supply spare PWR-75 13-ACA 5-63 normal supply for Australia startup power spare PWR-7513-ACE 5-63 1-8 4-4 supply Europe operating voltages power spare PCMCIA PWR-75 13-ACI 5-63 5-13 card supply replacement power spare...
  • Page 284 SNMP command 1-13 management 2-48 setup facility PKG-7513 5-63 material software shipping spare commands command show 5-35 interface minimum map command show 5-36 5-37 system requirements show command 5-37 traffic 5-36 upgrades show command 5-155-2 atm vc 5-36 software functions...
  • Page 285 standards physical description 2-43 32-bit 1-8 4-4 power ANSI X3.1 2-35 1-23 problems startup ANSIJCCITIF 2-20 1-13 processor EIAIflA-232 2-44 components replaceable EIAITIA-449 2-45 shutdown 1-8 4-4 EIA/TIA-612/613 2-13 spares EIA-530 2-46 5-63 internal replacing FDDI 3-26 startup IEEE EIATflA-232 2-50 unpacking 9314...
  • Page 286 E1-G.703/G.704 2-42 1-27 code color telephone industry 25-pair 2-39 PCMCIA 5-13 write card protection unattached 5-42 universal cable message universal serial port adapter 1-25 description 7513 Hardware and Maintenance Cisco Installation...
  • Page 287 X.21 cable pinouts 2-46 description 1-26 adapter port serial cable 2-41 adapter port 2-46 standard transmission distances cable 3-25 description pinout Index...
  • Page 288 7513 Hardware Maintenance Cisco Installation...
  • Page 289 Corporate Headquarters Cisco Systems 170 West Tasman Drive 95134-1706 Jose Wide World http//www.cisco.com 408 526-4000 800 553-NETS 6387 408 526-4100 Cisco over Systems worldwide sales offices Call companys corporate headquarters California 408 526-4000 contact your account local representative North America...

Table of Contents