Job Card Phy A044 - Remove/Reinstall Gantry Covers - GE Senographe DS Manual

Hide thumbs Also See for Senographe DS:
Table of Contents
GE Healthcare
Revision 1

Job Card PHY A044 - Remove/Reinstall Gantry Covers

1
SUPPLIES
None
2
TOOLS
Standard Tool Box
3
REQUIRED EFFORT
Personnel: 1 Field Engineer
Time: 20 minutes to remove covers, and 30 minutes to reinstall covers
4
SAFETY PRECAUTIONS
WARNING
Before beginning work, shut down the equipment and switch off the Generator hospital
supply circuit breaker. Lock it in the off position or mark it clearly with a warning sign to
prevent others from applying power.
Never lay a cover down with the painted side on a hard surface.
5
PREREQUISITES
None
6
OVERVIEW
For an overview of the covers, refer to
List of covers:
Column Covers (section 7)
-
Cable Exit Cover
-
Top Column Cover (Left and right)
-
Bottom Column Covers (Rear and front)
-
Front covers (Left and right)
Compression and Arm Covers (section 8)
-
Compression Carriage Cover
-
Compression Arm Covers (Left and right)
Tube Head Covers (Left and right) (section 9)
Detector Covers (Upper and lower covers) (section 10)
There are different types of covers
Pilot covers
Series covers which are divided into two kinds:
-
Flexible covers
-
Rigid covers
The procedure is valid for all covers except where specified.
JC-PHY-A-044.fm
Service Information and Procedures Class A 2385072-16-8EN
Job Card PHY A044 - Remove/Reinstall Gantry Covers
Gantry Covers on page 189.
Page no. 523
Senographe DS
Chapter 6
Chapter 6

Hide quick links:

Table of Contents
loading

Table of Contents