Section 4 Mounting; Required Tools; Checking Environmental Conditions And Mounting Space; Mounting The Ied - ABB Relion 650 Series Installation Manual

Intelligent electronic device
Hide thumbs Also See for Relion 650 Series:
Table of Contents
1MRK 514 013-UEN -
Section 4
4.1
4.2
4.3
4.3.1
650 series
Installation Manual
Mounting

Required tools

Use Torx TX10 and TX15 screwdrivers when attaching the mounting kits to the IED.
Checking environmental conditions and mounting
space
The mechanical and electrical environmental conditions at the installation site must
be within the limits described in the technical manual.
Avoid installation in dusty, damp places.
Avoid places susceptible to rapid temperature variations, powerful vibrations
and shocks, surge voltages of high amplitude and fast rise time, strong induced
magnetic fields or similar extreme conditions.
Check that sufficient space is available.
Sufficient space is needed at the front and rear of the IED to allow access to
wires and optical fibres and to enable maintenance and future modifications.
Flush mounted IEDs should be possible to be added or replaced without
excessive dismantling.

Mounting the IED

Flush mounting the IED

1.
Make a panel cut-out and drill four holes according to the dimensional drawing.
2.
Locate the IED securely in the mounting frame using the required screws.
3.
Tighten the screws.
4.
Mount the IED with the mounting frame to the panel cut-out.
Section 4
Mounting
13
Table of Contents
loading

Table of Contents