Paramount Fitness MDX-R3 Owner's Manual And Installation Manual page 10

SUMP INSTALLATION TO SHELL BEFORE SETTING POOL
1. Sand and clean this bottom surface area well (see arrow). This is where the gasket will seal. (Fig. 7)
2. Glue gaskets to the face of the sump with RTV Silicon glue. Be sure to line up all gasket holes with the
corresponding hole in the sump. (Fig. 8)
3. Line up ninety of the sump to face the side of the pool. Using two people or by reaching thru from the
inside of the pool position the sump so the screw holes line up keeping the sweep ninety facing the side of
the pool. Using the 12 flathead screws affix the sump to the mounting ring. (Fig. 8)
Fig. 7
MDX-R3 PRESSURE TESTING
Pressure Test-READ BEFORE INSTALLATION: New Style Test Plug
The 4" pressure test plugs (005-252-1610-00) use an o-ring to make the seal.
Wrap once with Teflon tape to prevent plastic threads from binding. Insert plug into threaded socket. Use an
adjustable wrench, a 1½" 12pt socket or pliers on lug and tighten by hand until snug. Over tightening may
cause parts to break.
Pressure should remain on the system through construction until right before filling with water.
Assemble the Drain PRIOR to Adding Water - See Illustration on Page 9:
1. Remove 4" pressure plug.
2. Install funnel assembly (#3) onto sump (#9) and
driver security T25 (#24).
3. Install the cover (#1) onto the funnel assembly (#3) and secure with 3 (three) security screws (#2).
WARNING
Release pressure on the
system before removing plugs
SUMP INSTALLATION
With Pressure Plugs
Fig. 9
4" PLUG
For technical assistance call 1.800.621.5886 or contact your regional representative
Fig. 8
SCREW HOLES
secure with 4 (four) security screws (#2) with screw
10
75mm PORT
2" HYDROSTAT PLUG
WITH 63mm SLIP PORT
loading