Warehouse Storage; On-Site Storage - Emerson Bettis RPE-Series Installation, Operation And Maintenance Manual

Rack and pinion pneumatic actuators
Hide thumbs Also See for Bettis RPE-Series:
Table of Contents
Section 1: Before You Start
October 2021
1.2

Warehouse Storage

1.3

On-Site Storage

NOTICE
Failure to follow the above guidelines (Warehouse and On Site Storages) will void warranty.
2 2
All actuators should be stored in a clean, dry warehouse, free from excessive
vibration and rapid temperature changes.
All actuators should not be stored directly to the floor surface - it must be placed
in racks/shelves or use a pallet.
All actuators should be stored in a clean, dry warehouse, free from excessive
vibration and rapid temperature changes.
Prevent moisture or dirt from entering the actuator. Plug or seal both air
connection ports.
Installation, Operation and Maintenance Manual
DOC.IOM.BE.EN Rev. 12
Before You Start
Table of Contents
loading

Table of Contents