Enclosure Diagram; Battery Calculation Table - GE NetworX Series Installation And Startup Manual

Remote power supply
Hide thumbs Also See for NetworX Series:
Table of Contents

ENCLOSURE DIAGRAM

IV.
Inside the can, several 2-holed insertion points have been constructed. This allows for
either vertical or horizontal placement of the modules. Notice that the insertion
points have two sizes of holes -- a larger hole and a smaller hole.
Diagram 1: The black plastic PCB guides are grooved on one edge where the PC
Board will be seated. The end with the half-moon protrusion fits into the larger hole.
The smaller hole is for the screw.
Diagram 2: Place the first black plastic PCB guide in the top insertion point, grooved
edge downward. The half-moon protrusion will be in the large hole. It does not
require force. Insert one of the provided screws into the smaller hole (from inside the
can) to secure it in place. A screwdriver should reach through the notch that runs the
length of the guide to tighten the screw. The second PCB guide should be
positioned opposite of the first (grooved edge up) and placed in the lower insertion
point, using the same procedures described above. Once mounted, screw it in
securely.
Diagram 3: The PC board should slide freely in the grooves of both guides.

BATTERY CALCULATION TABLE

V.
STANDBY TIME
24 hours
48 hours
72 hours
NX-320E Power Supply
TOTAL AUXILIARY
CURRENT
1.9 Amps
1.25 Amps
600 mA
900 mA
600 mA
300 mA
600 mA
400 mA
200 mA
STANDBY BATTERY
CAPACITY
51 AH
34 AH
17 AH
51 AH
34 AH
17 AH
51 AH
34 AH
17 AH
ALARM CURRENT
600 mA
1 Amp
1 Amp
1 Amp
1 Amp
1 Amp
1 Amp
1 Amp
1 Amp
5
Table of Contents
loading

This manual is also suitable for:

Networx nx-320e

Table of Contents