Receiving And Unpacking The Equipment - GE LOGIQ P6 Series Service Manual

Table of Contents
GE H
EALTHCARE
5394152, Revision 5
D
IRECTION
Section 3-3

Receiving and Unpacking the Equipment

When a new system arrives, check that any components are not damaged and are not in short supply.
If shipping damage or shortage occurs, contact the address shown in Chapter 1.
Do not lift the unit by the Keyboard. Equipment damage may result.
CAUTION
The crate with the LOGIQ™ P6/P6 Pro weighs approximately 80 Kg (176 lb.). Be prepared for a
CAUTION
sudden shift of weight as the unit is removed from its base (pallet)
1.) Cut the four PLASTIC BANDs.
Page 3-4
Figure 3-2 Cutting the Plastic Bands.
Section 3-1 - Overview
LOGIQ™ P6/P6 P
Plastic Bands
S
M
RO
ERVICE
ANUAL

Hide quick links:

Table of Contents
loading

Table of Contents