Slant/Fin EUTECTIC EC-10DV Series Installation And Operating Instructions Manual

Slant/Fin EUTECTIC EC-10DV Series Installation And Operating Instructions Manual

Direct vent oil-fired water boiler/no. 2 oil
Hide thumbs Also See for EUTECTIC EC-10DV Series:
EUTECTIC
DIRECT VENT OIL-FIRED WATER BOILER/NO. 2 OIL
SAFETY WARNING:
KEEP BOILER AREA CLEAR AND FREE FROM
COMBUSTIBLE
MATERIALS,
OTHER
FLAMMABLE
FAILURE
TO
ADHERE
WARNING, MAY RESULT IN PERSONAL INJURY
OR DEATH AND PROPERTY DAMAGE.
CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .PAGE
Ratings and Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Boiler Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Clearances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4
Vent Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Boiler Internal Baffles . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Vent Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Installing Water trim . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Installing Burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
Oil Supply Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Wiring the Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Precautions Before Starting . . . . . . . . . . . . . . . . . . . . . .6
Start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Cleaning and Filling New Water Boiler . . . . . . . . . . . . . .6
Wiring Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-11
Burner Data:
Riello . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12
Extended Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . . .14
Freezing Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
Oil Burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
General Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . .14
THIS BOILER OPERATES WITH POSITIVE PRESSURE IN
THE FLUE AND OVER FIRE, ALL SEALS MUST BE IN
PLACE WHEN OPERATING THE BOILER. ALL VENTING
MUST BE INSTALLED AND SEALED ACCORDING TO THE
VENT MANUFACTURER'S INSTRUCTIONS.
CAUTION
The information in this manual must be followed exactly
to avoid personal injury, property damage or loss of life.
SEE BACK COVER FOR
SERVICE PERSONNEL
INSTALLATION AND OPERATING INSTRUCTIONS
GASOLINE
AND
VAPORS
AND
LIQUIDS.
TO
ABOVE
SAFETY
EC-10DV Series
IMPORTANT: The installation of this equipment must conform
to the requirements of the authority having jurisdiction or, in
the absence of such requirements, to the Installation of Oil
Burning Equipment, ANSI/NFPA 31, latest edition, and to the
National Electrical Code ANSI/NFPA 70, latest edition. The
installation must also conform to the additional requirements in
this Slant/Fin Instruction Manual. Where there is any differ-
ence, the more stringent requirement shall govern.
In addition, where required by the authority having jurisdiction,
the installation must conform to American Society of
Mechanical Engineers Safety Code for Controls and Safety
Devices for Automatically Fired Boilers, No. CSD-1, latest
edition.
THIS MANUAL MUST BE LEFT WITH OWNER AND
SHOULD BE HUNG ON OR ADJACENT TO THE
IMPORTANT: This boiler must be installed by a trained,
experienced, service technician, licensed for the installation
and servicing of oil burning equipment or otherwise qualified by
the authorities having jurisdiction over the installation.
Part No. 470908000 Publication No. EC-10DV-40 Rev.B
BOILER FOR REFERENCE.
Printed in U.S.A. 1214
Table of Contents
loading

Summary of Contents for Slant/Fin EUTECTIC EC-10DV Series

  • Page 1: Table Of Contents

    Riello ........12 this Slant/Fin Instruction Manual. Where there is any differ- Care and Maintenance: ence, the more stringent requirement shall govern.
  • Page 2: Ratings And Dimensions

    1.15 (water). D.O.E. capacity output is NOTE: All boilers under 300,000 Btuh (87.9 kw) input are tested and rated for divided by the allowance to obtain net rating. The Slant/Fin Technical Service capacity under the U.S. Department of Energy (D.O.E.) Test Procedures for department should be consulted before selecting a boiler for unusual piping Boilers.
  • Page 3: Installation Requirements: Boiler Location

    MINIMUM clearances from combustible materials: prevent it from sagging. BACK-6" C. Maximum wall thickness is 14”. Contact Slant/Fin Corp. for SIDES-2" recommendations in case of thicker wall. NOTE: Except in closets and alcoves, clearances above may be reduced by D.
  • Page 4: Piping

    EUTECTIC EC-10 DV Figure 2. Typical Installation Sufficient space shall be left clear around the boiler. The figures stated in inches in the drawings below are the minimum recommended dimensions for providing Do not stack items on or box in the appliance within easy access around the boiler.
  • Page 5: Installing Burner

    EUTECTIC EC-10 DV Air Eliminator Automatic as per Manufacturer Air Vent Specifications To Circ. (s) and Zones 1-1/4” Suppy Pipe Mounted Supply 13-31/32 Tridicator 7-11/16 Panel Mounted Tridicator Pressure Sensor Well Relief valve 3/4 1/2” NPT Tapping for Feed Valve and Expansion Tank Panel Mounted Tridicator Temperature...
  • Page 6: Oil Supply Piping

    EUTECTIC EC-10 DV CAUTION: DO NOT USE GASOLINE, CRANKCASE CLEANING AND FILLING A NEW WATER BOILER I. BEFORE FILLING WATER BOILER DRAININGS, OR ANY OIL CONTAINING GASOLINE. A. Check burner to be certain it is ready for firing. DO NOT FIRE into an empty boiler.
  • Page 7: Wiring Diagrams

    EUTECTIC EC-10 DV...
  • Page 8 EUTECTIC EC-10 DV...
  • Page 9 EUTECTIC EC-10 DV...
  • Page 10 EUTECTIC EC-10 DV Honeywell L7248L, See “Adjusting Settings” Beckett 7600A and & error codes for HydroLevel 3250 Controls L7248L on page 11...
  • Page 11 EUTECTIC EC-10 DV FOR  L7248L °F or °C. Pressing the I button again (on L7224 models) will display the ADJUSTING SETTINGS Low Limit (LL) followed by a three-digit number and the corresponding To discourage unauthorized changing of Aquastat settings, a procedure degree designator.
  • Page 12: Riello

    EUTECTIC EC-10 DV RIELLO BURNER DATA Nozzles Riello Firing Approx. Boiler Burner Approx. Burner Blast Rate Size Angle & Oil Pump Head Flue Insertion Model Tube (GPH) Type Mfg. (PSIG) Setting Baffle Depth Boiler Model Setting EC-13DV BF-3 Long 0.65 0.55 80*A Delavan...
  • Page 13 EUTECTIC EC-10 DV Figure 5. Model F-5 Figure 6. Model F-3 SETTING THE AIR DAMPER ADJUSTMENT (see figure 7 & picture 2) 1. The initial air damper setting is made by turning screw (2) until the top edge of the air damper (3) is aligned with the number according to the burner setup chart.
  • Page 14: Care And Maintenance

    Technical action. Topics No. 2A, available from the Slant/Fin website, go to 4. The burner mounting door must be fully open to http://slantfin.com. Go to library, select current literature, clean the flue passages and the combustion select boiler model.
  • Page 15 ___________________________________ Telephone ___________________________ Model #_____________________________ Serial # _____________________________ ©Slant/Fin Corp. 2014. Printed in the U.S.A. 1214. Publication No. EC-10DV-40. Rev.B P/N 47-0908000 SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516) 484-2600 FAX: (516) 484-5921 • Canada: Slant/Fin , Mississauga, Ontario LTD/LTEE www.slantfin.com...

Table of Contents