Start Test Operation And Set Engine Rotational Speed - Panasonic U-16GE2E5 Main Parts Replacement

Gas heat pump, 2way/3way multi/w multi
Hide thumbs Also See for U-16GE2E5:
Table of Contents
Ignition Timing Check and Adjustment

3. Start test operation and set engine rotational speed

Start test operation, and select "
Start test operation.
(1) Press the HOME key (S004) for one second or
more.
Menu item number "
displayed.
(2) Press the UP (S005) or DOWN (S006) key, displaying the menu item numbers. Select menu item
"
" in the Figure.7. The display "
(3) Press the SET key (S007). "
will be displayed. The LEVEL LED (D053) will be
illuminated.
Press the SET key (S007) for one second or more.
The TEST/WARNING LED (D052) will be
illuminated, and the test run will start.
Set the engine rotational speed to 800 min
(4) Press the HOME key (S004) for one second or
more.
Menu item number "
displayed.
(5) Press the UP (S005) or DOWN (S006) key, displaying the menu item numbers. Select menu item
"
" in the Figure.11. The display "
" forced engine rpm setting, and set 800 [min
"(Figure.6) will be
Figure
.7
" (Figure.9)
-1
.
" (Figure.10) will be
Figure
.11
" (Figure.8) will appear.
" (Figure.12) will appear.
26
-1
].
Figure
Figure
.6
.6
Figure
.8
Figure
Figure
.9
.9
Figure
Figure
.10
.10
Figure
.12