ATS GDS-8 Installation, Operation And Maintenance Manual

ATS GDS-8 Installation, Operation And Maintenance Manual

Ultraviolet disinfection systems
Ultraviolet Disinfection Systems
Installation, Operation and
Maintenance Manual
CAUTION: Read and Follow all safety rules and
operating instructions before first use of product.
Dealer Info:
Models:
GDS-8
GDS-12
GDS-20
Table of Contents
loading

Summary of Contents for ATS GDS-8

  • Page 1 Ultraviolet Disinfection Systems Models: GDS-8 GDS-12 GDS-20 Installation, Operation and Maintenance Manual CAUTION: Read and Follow all safety rules and operating instructions before first use of product. Dealer Info:...
  • Page 2 GDS ©2016...
  • Page 3: Table Of Contents

    Table of Contents Installation Instructions: General Safety Instructions ................4 Function / Description ..................5 Installation ....................... 6 Installation Diagram ..................7 Electronic Controls & Startup Procedures ............8 Sanitation Procedures: ....................10 Maintenance: ........................12 Unit Parts Breakdown: ....................13 Circuit Board Layout: ......................
  • Page 4: General Safety Instructions

    General Safety Instructions WARNING - to guard against injury, basic safety 1. SAVE THESE INSTRUCTIONS. precautions should be observed, including the 2. WARNING: The ultraviolet light given off by this following: unit can cause serious burns to unprotected eyes and skin. Never look directly at a lit U.V.
  • Page 5 Model ATS series have a number code designation correspondent to the maximum GPM (gallons per minute) flow rate of the unit. I.E., GDS-8 has a maximum flow capacity of 8 GPM. Applications: GDS Units are designed to destroy micro-organisms in water supplies. The Ultraviolet lamp peak radiation of 254 nanometer wavelength (nm) destroys or inactivates the D.N.A.
  • Page 6: Installation

    Installation GENERAL CONSIDERATIONS FOR ALL DISINFECTION UNITS: STEP BY STEP INSTALLATION: 1. When installing the equipment, it is necessary that the 1. Turn off the water before cutting into the water line. unit be isolated from vibration, heavy equipment, and poorly connected piping.
  • Page 7: Installation Diagram

    Installation Diagram GDS ©2019 • www.aquat.com GDS ©2016...
  • Page 8: Electronic Controls & Startup Procedures

    Electronic Controls & Startup Procedures ALARM CONDITIONS OPERATING INSTRUCTIONS U.V. lamp Detector and Timer circuit board Lamp Your U.V. System is equipped to provide a continuous Operation and Alarm features: monitoring system of the U.V. lamp operational status. This is also equipped with an internal and external fused surge •...
  • Page 9 Sample Screen Shots MONTH MONTH ALARM ALARM Fig. 1 Fig. 2 MONTH MONTH ALARM ALARM Fig. 3 Fig. 4 GDS ©2019 • www.aquat.com GDS ©2016...
  • Page 10: Sanitation Procedures

    Sanitation Procedure HOW TO DISINFECT A WATER SYSTEM: continue to run pump if water doesn’t flow. Every new well, or existing water supply system that B. The high level of chlorine required to sanitize has been disrupted for service or repair, should be a water system is corrosive to most metals and disinfected before it is returned to use.
  • Page 11 Sanitation Procedure Continued **TOO MUCH CHLORINE IS BETTER THAN TABLE 2 TOO LITTLE: In situations where it is inconvenient to NOTE: determine depth of water or diameter of a drilled well, a minimum of 1/2 gallon of household bleach may be Pellets Weight = 1.14 gram each, 25 pellets/oz., 400 used for wells up to 8 inches in diameter with estimated pellets/lb.
  • Page 12: Maintenance

    Maintenance QUARTZ SLEEVE: acid container. It is important to handle the quartz sleeve with care to prevent breakage. Make certain that all finger Installation of the Quartz Sleeve: prints are wiped clean before reinstalling (see installation of the quartz sleeve). Replace O-Ring [ATS8-544(1)] every Always handle quartz sleeves carefully to prevent breaking time a quartz sleeve is cleaned or replaced.
  • Page 13 Molded Lamp 03-SA-015 Cord 07-00017 Fuse ATS1-421P-GDS Ballast TITLE NAME DATE ATS-GDS CUSTOMER BOM DRAWN 3/29/2017 ESS OTHERWISE SPECIFIED: PROPRIETARY AND CONFIDENTIAL CHECKED NSIONS ARE IN INCHES THE INFORMATION CONTAINED IN THIS RANCES: DRAWING IS THE SOLE PROPERTY OF SIZE DWG.
  • Page 14 Parts Breakdown GDS-8 ITEM PART NUMBER DESCRIPTION QTY. ATS-476D Domed Quartz ATS4-450 UV Lamp ATS-5172 Sightport Lens Orange .7" OD Viewport ATS-5173 O Ring ATS-5171 Sightport Nut ATS5-410 Lock Nut ATS-GDS GDS Control Box 8 Gallon Per Minute STS-8GPM Bottom Feed Assembled...
  • Page 15 Parts Breakdown - GDS-12 ITEM NO. PART NUMBER DESCRIPTION QTY. ATS1-759D Domed Quartz ATS4-739 UV Lamp Orange .7" OD Viewport O ATS-5173 Ring ATS-5172 Sightport Lens ATS-5171 Sightport Nut ATS5-410 Lock Nut ATS-12GPM 12 GPM Flow Control 12 Gallon Per Minute Feed...
  • Page 16 Parts Breakdown - GDS-20 ITEM PART DESCRIPTION QTY. NUMBER ATS-832D Domed Quartz ATS4-810 UV Lamp Orange .7" OD Viewport O ATS-5173 Ring ATS-5172 Sightport Lens ATS-5171 Sightport Nut ATS5-410 Lock Nut Quartz Sleeve Black 1.2" OD ATS8-544 ORing ATS5-414 End Nut...
  • Page 17: Circuit Board Layout

    Circuit Board Layout GDS ©2019 • www.aquat.com GDS ©2016...
  • Page 18: Wiring Diagram

    TITLE MALE PLUG NAME DATE DRAWN 4/21/16 PROPRIETARY AND CONFIDENTIAL ATS-281P Circuit Bo THE INFORMATION CONTAINED IN THIS CHECKED DRAWING IS THE SOLE PROPERTY OF AQUA TREATMENT SERVICES. ANY SIZE DWG. NO. REPRODUCTION IN PART OR AS A WHOLE ENG APPR.
  • Page 19: Troubleshooting

    Troubleshooting TROUBLESHOOTING GUIDE PROBLEM CAUSE CORRECTION U.V. lamp will not light Check input voltage if below Install a voltage regulator or above 120 volts Electrical cord disconnected Check, replace or outlet defective Defective U.V. lamp Replace lamp Defective lamp ballast Check output voltage Replace ballast Loose open-circuit wire...
  • Page 20: Sterile Water Sample Precedures

    Sterile Water Sample Procedures SUGGESTED PROCEDURE FOR OBTAINING STERILE WATER SAMPLES: Prior to taking the water sample, be sure to have on hand an adequate supply of sterile bottles (as shown in Fig 1). These sterile bottles should be obtained from a reputable laboratory and should have been autoclaved and contained within a plastic outer wrapping.
  • Page 21: Specifications

    Specifications GDS ©2019 • www.aquat.com GDS ©2016...
  • Page 22: Notes

    Notes GDS ©2019 • www.aquat.com GDS ©2016...
  • Page 23 Notes GDS ©2019 • www.aquat.com GDS ©2016...
  • Page 24: Warranty

    Warranty GDS ©2019 • www.aquat.com GDS ©2016...

This manual is also suitable for:

Gds-12Gds-20

Table of Contents