Installing A 1 U Device (Usg6330/6350/6360/6370/6380/6390/6530/6550/6570/6620/6630) - Huawei USG6000 Series Hardware Manual

Unified security gateway
Hide thumbs Also See for USG6000 Series:
Table of Contents
HUAWEI USG6000 Unified Security Gateway
Hardware Guide
Procedure
The USG starts after the switch of the power supply device is turned on.
You can identify the USG status based on indicators on the front panel. Indicators shown in
Figure 2-15
Figure 2-15 Indicators when the USG6310/6320 runs normally
Before powering off the USG, ensure that configuration data is saved. Otherwise, the
configuration data may be lost.
If the USG will be administratively shut down for a long time, turn off the power switch.
After powering off the USG, set it aside properly according to storage requirements.
----End
Follow-up Procedure
After the USG is powered on, you can log in to the configuration page for management and
maintenance. For details, refer to the Administrator Guide.
2.3 Installing a 1 U Device
(USG6330/6350/6360/6370/6380/6390/6530/6550/6570/6620/66
30)
This chapter provides the cabinet-mounting, workbench-mounting, cable connection, and
expansion card installation methods of the
USG6330/6350/6360/6370/6380/6390/6530/6550/6570/6620/6630 series.
Issue 03 (2015-01-26)
Power on the USG.
indicate that the USG is running normally.
Power off the USG.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Hardware Installation
177

Hide quick links:

Table of Contents
loading

Table of Contents