ABB SM1000 Installation Instructions Manual

Paperless recorders i/o module board installation
Hide thumbs Also See for SM1000:

Quick Links

A B B M E A S U R E M E N T & A N A LY T I C S | I N F O R M AT I O N | I N F 0 1 /4 9 R E V. E
SM1000, SM2000 and SM3000
Paperless recorders
I/O module board installation
1
Introduction
This publication describes the procedure for installing the
following I/O module boards in SM1000, SM2000 and SM3000
recorders.
GR2000/0703 3-relay module board service pack
GR2000/0704 6-relay module board service pack
GR2000/0705 Hybrid module board service pack
GR2000/0706 Transmitter PSU module board service pack
GR2000/0708 6-channel, analog input module board
service pack
GR2000/0714
High-specification, 6-channel analog input
module board service pack
In addition to the I/O module board, each pack contains the
following:
Description
20-way I/O connector – except GR2000/0714
20-way I/O connector – GR2000/0714 only
20-way terminal adaptor
Terminal block label
PCB terminal block guide
M3 x 4 screw
M3 x 10 screw
M3 nut
This publication – SM1000, SM2000 and SM3000
I/O module board installation
Notes.
• The 6-channel analog input module board packs
GR2000/0708 and GR2000/0714 each include 6 resistor
assemblies (part no. GR2000/0073).
• The 20-way connector included in pack GR2000/0708 has a
thermistor and cover fitted – see Notes in Figure 5 on page
4 and Figure 9 on page 7.
• The 20-way connector included in pack GR2000/0714 has a
thermometer and cover fitted – see Notes in Figure 5 on page
4 and Figure 9 on page 7.
2
• Medium, flat-bladed screwdriver
• No. 1 Pozidriv screwdriver
• Small pair of pliers (for early models SM2000 only)
• 3 mm dia. flat-bladed, parallel tip screwdriver
Part No.
Qty
B10750
1
GR2000/0162
1
GR2000/0113
1
GR2000/0186
1
PR250/0107
2
B12076
2
J/0227/383
2
B5719
2
INF01/49
1
Tools required
loading

Summary of Contents for ABB SM1000

  • Page 1 Introduction Tools required This publication describes the procedure for installing the • Medium, flat-bladed screwdriver following I/O module boards in SM1000, SM2000 and SM3000 • No. 1 Pozidriv screwdriver recorders. • Small pair of pliers (for early models SM2000 only) •...
  • Page 2 S M 1 0 0 0 , S M 2 0 0 0 A N D S M 3 0 0 0 | I/O M O D U L E B O A R D I N S TA L L AT I O N | I N F 0 1 /4 9 R E V. E I/O module board installation (SM1000 and SM2000) CAUTION The recorder is vulnerable to electrostatic damage.
  • Page 3 S M 1 0 0 0 , S M 2 0 0 0 A N D S M 3 0 0 0 | I/O M O D U L E B O A R D I N S TA L L AT I O N | I N F 0 1 /4 9 R E V. E 4 Referring to Figure 3, remove the existing I/O module board (if fitted) and fit the new I/O module board.
  • Page 4 S M 1 0 0 0 , S M 2 0 0 0 A N D S M 3 0 0 0 | I/O M O D U L E B O A R D I N S TA L L AT I O N | I N F 0 1 /4 9 R E V. E …3 I/O module board installation (SM1000 and SM2000)
  • Page 5 S M 1 0 0 0 , S M 2 0 0 0 A N D S M 3 0 0 0 | I/O M O D U L E B O A R D I N S TA L L AT I O N | I N F 0 1 /4 9 R E V. E 8 Referring to Figure 1 on page 2, refit the terminal cover 10 Referring to Figure 1 on page 2, refit the recorder (if fitted).
  • Page 6 S M 1 0 0 0 , S M 2 0 0 0 A N D S M 3 0 0 0 | I/O M O D U L E B O A R D I N S TA L L AT I O N | I N F 0 1 /4 9 R E V. E …4 I/O module board installation (SM3000) 3 Referring to Figure 8, remove the existing I/O module board (if fitted) and fit the new I/O module board.
  • Page 7 S M 1 0 0 0 , S M 2 0 0 0 A N D S M 3 0 0 0 | I/O M O D U L E B O A R D I N S TA L L AT I O N | I N F 0 1 /4 9 R E V. E 4 Referring to Figure 7 on page 5, loosen the 3 screws 6 Referring to Figure 7 on page 5, refit the terminal cover securing the terminal cover and remove the cover (if fitted).
  • Page 8 We reserve the right to make technical changes or modify the contents of this document without prior notice. With regard to purchase orders, the agreed particulars shall prevail. ABB does not accept any responsibility whatsoever for potential errors or possible lack of information in this document.

This manual is also suitable for:

Sm2000Sm3000