Dormakaba ED100 Installation Instructions Manual

Dormakaba ED100 Installation Instructions Manual

Low/full energy swing door operators, fine cover
Hide thumbs Also See for ED100:
Table of Contents

Quick Links

ED100 / ED250
Low/Full Energy Swing Door Operators
(Fine cover)
Installation Instructions
DL4615-005 – 01-2020
| EN |
Table of Contents
loading

Summary of Contents for Dormakaba ED100

  • Page 1 ED100 / ED250 Low/Full Energy Swing Door Operators (Fine cover) Installation Instructions DL4615-005 – 01-2020 | EN |...
  • Page 2: Table Of Contents

    ED100 / ED250 Installation Instructions – Fine cover Table of Contents Table of contents Table of contents ED100/ED250 door signage General information 10.1 Full energy operator General information 10.2 Low energy operator Product description 10.3 Door signage, full energy single swing...
  • Page 3 ED100 / ED250 Installation Instructions – Fine cover Table of Contents Measure door width, reveal depth Maintenance 15.1 Door width parameter Tb 27.1 Safety label, automatic swing doors 15.2 Tb parameter values 27.2 Safety label, low energy swing doors 15.3...
  • Page 4: General Information

    ED100 / ED250 Installation Instructions – Fine cover Chapter 1 1 General information General information 1.1.1 Installation Instructions 1.1.6 Symbols used in these instructions. This manual provides installation instructions for WARNING ED100 / ED250 swing door operators used in single, double door and double egress installations.
  • Page 5: Product Description

    • Fine cover, end and spindle caps. The ED250 or ED100 operator must be installed on an interior building surface. • Low energy or Full energy accessory installation kit (Chapter 6).
  • Page 6: Safety Information

    3.2 Door signage requirements. Proper signs and labels shall be applied and maintained on Crushing hazards at door closing edges! the door controlled by the ED100 / ED250 swing door operator. • Reference Chapter 10, ED100 / ED250 Door Signage.
  • Page 7: Ed100 / Ed250 Product Overview

    ED100 / ED250 Installation Instructions – Fine cover Chapter 4 4 ED100 / ED250 Product overview ED100 / ED250 system Fig. 4.1.1 ED100 / ED250 hardware overview Mounting plate Spindle Spring tension adjustment 4 button keypad and 2 digit display...
  • Page 8: Rh Door Configurations

    ED100 / ED250 Installation Instructions – Fine cover Chapter 4 RH door configurations Fig. 4.3.1 RH push Standard width cover 5 1/8” 27” [686] 0 - 8” [130] [0 203] 2 3/4” [70] 18” [457] Fig. 4.3.2 RH push, deep reveal 5 1/8”...
  • Page 9: Lh Door Configurations

    ED100 / ED250 Installation Instructions – Fine cover Chapter 4 Fig. 4.3.5 RH pull as a push – track mount installation LH door configurations Fig. 4.4.1 LH push Fig. 4.4.4 LH pull – Track mount installation – Fig. 4.4.2 LH push, deep reveal Fig.
  • Page 10: Double Door Configurations

    ED100 / ED250 Installation Instructions – Fine cover Chapter 4 Double door configurations Fig. 4.5.1 Push 5 1/8” Standard width cover 0 - 8” [130] 27” [686] [0 203] 2 3/4” [70] 18” [457] Fig. 4.5.2 Pull - Track mount installation 5 1/8”...
  • Page 11: Double Egress Door Configurations

    ED100 / ED250 Installation Instructions – Fine cover Chapter 4 Fig. 4.5.5 Pull as push – track mount installation 0 - 2 3/4” Double egress door configurations Fig. 4.6.1 LH double egress Standard width cover 0 - 8” 5 1/8”...
  • Page 12: Ed100 / Ed250 Operator

    ED100 / ED250 Installation Instructions – Fine cover Chapter 4 ED100 / ED250 operator Fig. 4.5.1 ED100 / ED250 operator Fig. 4.5.2 Accessory terminals, guide pin Fig. 4.5.4 ED900 operator end caps End cap, program switches End cap, power...
  • Page 13: Ed100 / Ed250 Operator Component View

    ED100 / ED250 Installation Instructions – Fine cover Chapter 4 ED100 / ED250 operator component view Fig. 4.6.1 ED100/ED250 component view 1 Fig. 4.6.2 ED100/ED250 component view 2 Power switch 120 VAC terminals Housing unit Splined spindle Operator (motor,...
  • Page 14: Axle Extensions

    ED100 / ED250 Installation Instructions – Fine cover Chapter 4 Axle extensions Fig. 4.7.2 [30 mm] Fig. 4.7.1 [20 mm] Fig. 4.7.3 [60 mm] Fig. 4.7.4 [90 mm] 1 1/8" 3 9/16" 3/4" 2 3/8"" 20 mm axle extension sleeve...
  • Page 15: Push Arm Door Stop - Option

    ED100 / ED250 Installation Instructions – Fine cover Chapter 4 Push arm door stop - option Fig. 4.9.1 Door stop assembly Fig. 4.9.2 Mounting screw kit 1/2" thick base plate DC4633-002 1/4" thick base (4) 5.1 plate DC4633-001 Rubber bumper...
  • Page 16: Accessory Kits, Axle Extension Kits

    ED100 / ED250 Installation Instructions – Fine cover Chapters 4 and 5 4.10.2 Full width cover kit, double door DK3401-07X. Fig. 4.10.2 Full width cover kit DK3401-07X Cover, pair End cap set Mounting plate connectors Mounting plate, pair dormakaba logo...
  • Page 17: Ed100 And Ed250 Low Energy Accessory

    ED100 / ED250 Installation Instructions – Fine cover Chapter 5 Fig. 5.1.7 Communication cable Fig. 5.1.6 Program switch panel Program switch panel DX4604 Communication cable DX4607 for program switch panel Reference Para. 5.6 for optional key switch panels. ED100 and ED250 low energy accessory kit Fig.
  • Page 18: Double Door Ed100/Ed250 Operator Connection Cables

    ED100 / ED250 Installation Instructions – Fine cover Chapter 5 Double door ED100/ED250 operator connection cables Fig. 5.3.1 Communication cable Fig. 5.3.2 115 VAC power cable Communication cable DX3485-010, 250 mm, 9 7./8" DX3485-020, 1030 mm, 40 1/2" DX3485-030, 2030 mm, 80"...
  • Page 19: Operational Mode Overview

    ED100 / ED250 Installation Instructions – Fine cover Chapter 6 6 Operational mode overview ED100/ED250 door closer modes 6.1.1 Automatic mode TIPS AND RECOMMENDATIONS Door closer mode parameter hd=0. Designed for automatic access following pulse Parameter descriptions can be found in generation by a motion detector or pushbutton.
  • Page 20: Technical Data

    ED100 / ED250 Installation Instructions – Fine cover Chapter 7 7 Technical data ED100 / ED250 Technical data 7.1.1 Required operating conditions 7.1.4 Outputs Maximum wire size Ambient temperature 5 to 122 °F [-15 to 50⁰ C] 16 AWG Connector plug 1/16”...
  • Page 21: Operating Specifications

    ED100 / ED250 Installation Instructions – Fine cover Chapter 7 Operating specifications 7.2.1 ED250 7.2.2 ED100 Maximum power input 240 watt Maximum power input 120 watt Closing torque Closing torque FE: 320 lb [145 kg] FE: 250 lb [113kg],...
  • Page 22: User Interface

    ED100 / ED250 Installation Instructions – Fine cover Chapter 8 8 User interface Overview Fig. 8.1.1 Operator keypad and display 8.1.1 Operator user interfaces 2 digit display 1. 4 button keypad and 2 digit display. 4 button keypad •...
  • Page 23: Program Switches

    ED100 / ED250 Installation Instructions – Fine cover Chapter 8 Program switches 8.3.1 Program switch control modes Fig. 8.3.1 Program switches • Close, door closes automatically, or Exit Only switch, remains closed. 2 position Program switch, 3 position •...
  • Page 24: System Accessories

    ED100 / ED250 Installation Instructions – Fine cover Chapter 9 9 System accessories System accessory electrical connections Fig. 9.1.1 Electrical connections, single door External program 3 x 12 AWG switch, mechanical 115 VAC power 3 x 4.0 mm External program...
  • Page 25: Ed100 / Ed250 Terminal Board Interfaces

    ED100 / ED250 Installation Instructions – Fine cover Chapter 9 ED100 / ED250 terminal board interfaces Fig. 9.3.1 Terminal board electrical connections Green LED (Para. 8.4) Night- Activation inputs Yellow LED (Para. 8.4) Interior Exterior bank Safety sensors Red LED (Para. 8.4)
  • Page 26: Ed100/Ed250 Door Signage

    ED100 / ED250 Installation Instructions – Fine cover Chapter 10 10 ED100/ED250 door signage 10.1 Full energy operator 10.1.1 Overview Fig. 10.1.1 One decal, approach, non-approach Signage and warnings are specified in ANSI /BHMA A156.10, American National Standard for Power DO NOT Operated Pedestrian Doors, paragraph 11.
  • Page 27: Door Signage, Full Energy Single Swing Door

    ED100 / ED250 Installation Instructions – Fine cover Chapter 10 10.3 Door signage, full energy single swing door Fig. 10.3.1 One way traffic Fig. 10.3.2 Two way traffic DO NOT AUTOMATIC CAUTION ENTER DOOR dormakaba dormakaba dormakaba AUTOMATIC AUTOMATIC...
  • Page 28: Door Signage, Full Energy Double Door

    ED100 / ED250 Installation Instructions – Fine cover Chapter 10 10.5 Door signage, full energy double door Fig. 10.5.1 One way traffic, approach side Fig. 10.5.4 One way traffic, non-approach side DO NOT DO NOT ENTER ENTER dormakaba dormakaba...
  • Page 29: Door Signage, Full Energy Double Egress Door

    ED100 / ED250 Installation Instructions – Fine cover Chapter 10 10.6 Door signage, full energy double egress door Fig. 10.6.1 One way traffic, interior Fig. 10.6.3 One way traffic, exterior DO NOT DO NOT ENTER dormakaba ENTER AUTOMATIC AUTOMATIC...
  • Page 30: Door Signage, Low Energy Double Doors

    ED100 / ED250 Installation Instructions – Fine cover Chapter 10 10.7 Door signage, low energy double doors Fig. 10.7.4 Knowing act, non-hinge side Fig. 10.7.1 Knowing act, non-hinge side AUTOMATIC AUTOMATIC CAUTION CAUTION AUTOMATIC AUTOMATIC CAUTION CAUTION DOOR DOOR...
  • Page 31: Safety Label, Automatic Swing Doors

    The appropriate performed daily on low energy swinging door controlled 6. Inspect door's overall signage should be present by an ED100 or ED250 operator configured for the low condition. The appropriate and the hardware should signage should be present.
  • Page 32: Recommended Tools And Torque Chart

    ED100 / ED250 Installation Instructions – Fine cover Chapter 11 11 Recommended tools and torque chart 11.1 Recommended tools Fig. 11.1.1 Recommended tools T-handle hex key, 5 Hex keys, 2.5 mm, 3 mm, 6 mm Screwdriver, flat blade Door pressure...
  • Page 33: Ed100 / Ed250 Operator Installation

    ED100 / ED250 Installation Instructions – Fine cover Chapter 12 12 ED100 / ED250 operator installation 12.1 Installation preparation 12.1.4 ED100 / ED250 mounting plate installation NOTICE preparation. Installation steps listed in Chapter 12 through 14 CAUTION are a recommendation. Structural, local...
  • Page 34: Installation Templates, Single Door

    ED100 / ED250 Installation Instructions – Fine cover Chapter 12 12.2 Installation templates, single door Fig. 12.2.1 Assembly on hinge side, pull version with slide channel and short pivot pin 5 7/8” [150] 4 3/16” [106] 4 3/4” 4 3/4”...
  • Page 35 ED100 / ED250 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.2 Assembly on hinge side, pull version with slide channel and long pivot pin 5 7/8” [150] 4 3/16” [106] 3 15/16” 4 3/4” 4 3/4” 4 3/4”...
  • Page 36 ED100 / ED250 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.3 Assembly on hinge side, pull version with slide channel CPD and short pivot pin 5 7/8” [150] 4 3/16” [106] 4 3/4” 4 3/4” 4 3/4” 3 3/4”...
  • Page 37 ED100 / ED250 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.4 Assembly on hinge side, pull version with slide channel CPD and short pivot pin 5 7/8” [150] 4 3/16” [106] 3 15/16” 4 3/4” 4 3/4” 4 3/4”...
  • Page 38 ED100 / ED250 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.5 Assembly on opposite hinge side, push version with slide channel and short pivot pin 5 7/8” [150] 4 3/16” [106] 3 3/4” 4 3/4” 4 3/4” 4 3/4”...
  • Page 39 ED100 / ED250 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.6 Assembly on opposite hinge side, push version with arm assembly 5 7/8” [150] 4 3/16” [106] 3 3/4” 4 3/4” 4 3/4” 4 3/4” 3 15/16” 1 3/4”...
  • Page 40 ED100 / ED250 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.7 Assembly on opposite hinge side, push version with arm assembly EN 7 9 7/8” [250] 8 1/8” 3 3/4” 4 3/4” 4 3/4” 4 3/4” 3 15/16”...
  • Page 41 ED100 / ED250 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.8 Assembly on centrally supported door with slide channel CPD and short pivot pin 5 7/8” [150] 4 3/16” 4 3/4” 4 3/4” 4 3/4” 3 3/4” [106] 3 15/16”...
  • Page 42 ED100 / ED250 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.9 Assembly on centrally supported door with slide channel CPD and short pivot pin 5 7/8” [150] 4 3/16” 4 3/4” 4 3/4” 4 3/4” 3 3/4” [106] 3 15/16”...
  • Page 43: Installation Templates, Double Doors

    ED100 / ED250 Installation Instructions – Fine cover Chapter 12 12.3 Installation templates, double doors Fig. 12.3.1 Pull version, mounting on hinge side, Professional cover, standard axle extension 5/8” 5/8” 5 1/8” [130] [15] [15] 2 3/4” [70] 5 7/8”...
  • Page 44 ED100 / ED250 Installation Instructions – Fine cover Chapter 12 Fig. 12.3.2 Pull version with CPD lever, mounting on hinge side, Professional cover, standard axle extension 5/8” 5/8” 5 1/8” [130] [15] [15] 2 3/4” [70] 2 3/8” [61] 5 7/8”...
  • Page 45 ED100 / ED250 Installation Instructions – Fine cover Chapter 12 Fig. 12.3.3 Push version with track, mounting on opposite hinge side, Professional cover, standard axle extension 5/8” 5/8” 5 1/8” [130] [15] [15] 2 3/4” [70] 5 7/8” 5 7/8”...
  • Page 46 ED100 / ED250 Installation Instructions – Fine cover Chapter 12 Fig. 12.3.4 Push version with arm, mounting on opposite hinge side, Professional cover, standard axle extension 5/8” 5 1/8” [130] 5/8” [15] 2 3/4” [70] [15] 1 5/16” [33]...
  • Page 47 ED100 / ED250 Installation Instructions – Fine cover Blank page This page left intentionally blank. ED100 / ED250 DL4615-005 01-2020...
  • Page 48: Remove Mounting Plate From Ed150 / Ed250 Operator

    ED100 / ED250 Installation Instructions – Fine cover Chapter 12 12.4 Remove mounting plate from ED150 / ED250 operator Fig. 12.4.1 115 Vac plug removal 12.4.1 Remove 115 Vac plug from 115 Vac plug receptacle. 115 Vac socket 1. Remove 115 Vac plug (5) from its receptacle (6).
  • Page 49: Customer 115 Vac Connection To Mounting Plate Terminal Block

    ED100 / ED250 Installation Instructions – Fine cover Chapter 12 12.5 Customer 115 Vac connection to mounting plate terminal block 12.5.1 Customer 115 Vac wiring. Fig. 12.5.1 115 VAC terminal block 115 VAC terminal WARNING block Ground terminal Routing and connection of 115 Vac...
  • Page 50 ED100 / ED250 Installation Instructions – Fine cover Chapter 12 Fig. 12.5.5 115 Vac terminal block mounting 12.5.3 Install conduit box (option). 115 VAC terminal block TIPS AND RECOMMENDATIONS Ground terminal 115 Vac terminal block is secured M3.5 screw...
  • Page 51: Mounting Plate Attachment To Jamb Or Wall

    ED100 / ED250 Installation Instructions – Fine cover Chapter 12 12.6 Mounting plate attachment to jamb or wall Fig. 12.6.1 Mounting plate installation NOTICE Mounting plate installation location based on selected installation template. • Reference Para. 12.2 (single door) and 12.3 (double door) installation templates.
  • Page 52: Connect Customer 115 Vac To Mounting Plate Terminal Block

    ED100 / ED250 Installation Instructions – Fine cover Chapter 12 12.7 Connect customer 115 Vac to mounting plate terminal block Fig. 12.7.1 115 Vac wiring example 115 Vac terminal block 12.7.1 Connect customer 115 Vac wiring. Ground post WARNING...
  • Page 53: Remove Protective Film Strips From Operator

    ED100 / ED250 Installation Instructions – Fine cover Chapter 12 12.9 Remove protective film strips from operator Fig. 12.9.1 Operator heat conductive pads 12.9.1 Remove protective film strips. Heat conductive pad 1. Remove two protective film strips from operator heat conductive pads.
  • Page 54: Push Arm Installation Templates

    ED100 / ED250 Installation Instructions – Fine cover Chapter 13 13 Push arm installation 13.1 Push arm installation templates NOTICE Reference Para. 12.2 (single door) and Para. 12.3 (double door) installation templates. Fig. 13.1.1 Push arm assemblies Standard push arm, reveal depths 0 - 8"...
  • Page 55 17 ft-lb [23 Nm] Spindle M8 x __ SHCS 13.2.3 Drill two holes in door for Fig. 13.2.6 Arm assemblies attached to door and ED100 / ED250 adjustment arm shoe. Installation templates (Para. 12.2, 12.3) document location of shoe on door.
  • Page 56 ED100 / ED250 Installation Instructions – Fine cover Chapter 13 Fig. 13.2.7 Arm assemblies attached to door and ED100 / ED250 13.2.5 Connect adjustment arm to drive arm. 1. Loosen the two adjustment M6 x 10 mm flanged button head screws.
  • Page 57: Set Ed100 / Ed250 Operator Spring Tension

    ED100 / ED250 Installation Instructions – Fine cover Chapter 13 13.6 Set ED100 / ED250 operator spring tension Fig. 13.6.1 Spring tension adjustment Spring tension adjustment 13.6.1 Spring tension setting revolutions 13.6.2 Operator spring tension function. 1. Spring tension sets closing force on door.
  • Page 58: Arm With Track Mount Installation

    ED100 / ED250 Installation Instructions – Fine cover Chapter 14 14 Arm with track mount installation 14.1 Arm with track installation NOTICE Reference Para. 12.2 (single door) and Para. 12.3 (double door) installation templates. 14.2 Splined arm and track assemblies Fig.
  • Page 59: Slide Shoe Assembly

    ED100 / ED250 Installation Instructions – Fine cover Chapter 14 14.4 Slide shoe assembly 14.4.1 Install pivot pin into slide shoe. Fig. 14.4.1 Slide shoe and pivot pin 1. Insert pivot pin into slide shoe. Slide shoe Pivot pin 2.
  • Page 60: Fasten Track Assembly To Door

    ED100 / ED250 Installation Instructions – Fine cover Chapter 14 14.6 Fasten track assembly to door 14.6.1 Mount track assembly on door. Fig. 14.6.1 Track assembly Track CAUTION Fixing piece Insure track hardware is Slide shoe assembled for hand of door Bumper (Para.
  • Page 61: Arm Assembly

    ED100 / ED250 Installation Instructions – Fine cover Chapter 14 14.7 Arm assembly Fig. 14.7.1 Arm assembly 14.8 Arm assembly with CPD lever 14.8.1 Arm with CPD lever assembly. Fig. 14.8.1 Slotted Fig. 14.8.2 M6 x 10 spring SHCS...
  • Page 62: Fasten Arm To Ed100 / Ed250 Operator

    ED100 / ED250 Installation Instructions – Fine cover Chapter 14 14.9 Fasten arm to ED100 / ED250 operator 14.9.1 Mount drive arm to operator. Fig. 14.9.1 Mount drive arm to operator at 12 degrees WARNING 12° Use caution when working in proximity of door and pull arm!.
  • Page 63 ED100 / ED250 Installation Instructions – Fine cover Chapter 14 Fig. 14.9.7 Fastening drive arm to pivot pin 14.9.2 Attach drive arm to pivot pin. 1. Open door as required to access pivot pin M8 socket head. 2. Use 6 mm T handle hex key to rotate pivot pin M8 socket head into drive arm and tighten.
  • Page 64: Measure Door Width, Reveal Depth

    ED100 / ED250 Installation Instructions – Fine cover Chapter 15 15 Measure door width, reveal depth 15.1 Door width parameter Tb 15.2 Tb parameter values 15.2.1 ED100 / ED250 door widths Parameter Description Reference Door width measurement Door width...
  • Page 65: Reveal Depth Parameter Rd

    ED100 / ED250 Installation Instructions – Fine cover Chapter 15 15.3 Reveal depth parameter rd Fig. 15.3.1 Positive reveal Parameter Description Reference Positive reveal depth Reveal depth Chapter 18 Mounting surface 15.3.1 Reveal depth parameter Door 1. Reveal depth is set in increments of 10 mm frame (approximately 3/8").
  • Page 66: Braking Circuit Plug

    ED100 / ED250 Installation Instructions – Fine cover Chapter 16 16 Braking circuit plug 16.1 Braking circuit plug position Fig. 16.1.1 Braking circuit socket and plug, plug factory installed in pull installation location Braking circuit plug Braking circuit 3 pin socket User interface 16.1.1 Braking circuit plug.
  • Page 67: Power Fail Closing Speed

    ED100 / ED250 Installation Instructions – Fine cover Chapter 17 17 Power fail closing speed 17.1 Set power fail closing speed Fig. 17.1.1 Power fail closing speed potentiometer Power fail closing speed potentiometer Control board 17.1.1 Power fail closing speed Fig.
  • Page 68: Parameters

    ED100 / ED250 Installation Instructions – Fine cover Chapter 18 18 Parameters 18.1 Parameters 18.1.1 Firmware version and updates. 18.1.4 Changing parameter values. • Operator firmware version is displayed during first 1. Set program switches to the CLOSE position commissioning.
  • Page 69 ED100 / ED250 Installation Instructions – Fine cover Chapter 18 18.1.5 Configuration parameters. TIPS AND RECOMMENDATIONS Parameter Description Driving parameter details can be found in Appendix A. Installation type Reveal depth Driving parameter Door width Description Input 4/4a and X3, 1G 24V locking...
  • Page 70 ED100 / ED250 Installation Instructions – Fine cover Chapter 18 18.1.7 Configuration parameters, detail Door width Parameter and value ED100 range, factory setting Parameter description 7 to 11 Door width is set in increments of = bold. 100 mm (4"),;"9" = 900 mm (35.4").
  • Page 71: Single Door First Commissioning

    ED100 / ED250 Installation Instructions – Fine cover Chapter 19 19 Single door first commissioning 19.1 First commissioning Fig. 19.1.1 Program switch Conditions prior to commissioning. Program switch, 3 position 1. ED100 / ED250 operator is installed. 2. Standard push arm or arm with track is installed.
  • Page 72: Set Configuration Parameters

    ED100 / ED250 Installation Instructions – Fine cover Chapter 19 19.2 Set configuration parameters 19.2.1 Set parameter AS, installation type. Fig. 19.2.1 4 button keypad, 2 digit display Step 1 Press PRG greater than 3 s to enter Four button...
  • Page 73: Full Width Cover Option; Set Parameter Ps, Program Switch Type

    ED100 / ED250 Installation Instructions – Fine cover Chapter 19 19.2.3 Set parameter Tb, door width. Fig. 19.2.2 4 button keypad, 2 digit display Step 13 Four button Press Scroll to Tb parameter. keypad < 3s Quit Two digit display >...
  • Page 74: Perform Learning Cycle

    ED100 / ED250 Installation Instructions – Fine cover Chapter 19 19.4 Perform learning cycle CAUTION Step 1 Secure motion range of door. Learning cycle must be performed while Set program switch to CLOSE position, Step 2 motor is cold! Fig.
  • Page 75: Double Door First Commissioning

    ED100 / ED250 Installation Instructions – Fine cover Chapter 20 20 Double door first commissioning 20.1 Separately commission active and inactive doors 20.1.1 Commission active door first. 1. Refer to Chapter 19 and commission active door. 20.1.2 Commission inactive door.
  • Page 76 ED100 / ED250 Installation Instructions – Fine cover Chapter 20 20.2.2 Active door, set parameters dL and Ad. Door type 1. Set active door program switches to CLOSE. 2. Set parameters dL (door type) and Ad (caster angle ) Parameter for active door.
  • Page 77: Connect Communication Cable Between Operators

    ED100 / ED250 Installation Instructions – Fine cover Chapter 20 20.2.3 Inactive door, set parameter dL. 1. Set program switch to CLOSE. 2. Set parameter dL (door type) for inactive door. Step 1 Step 5 Press and hold PRG > 3 s to enter...
  • Page 78: Set Track Bumper Stop

    ED100 / ED250 Installation Instructions – Fine cover Chapter 21 21 Set track bumper stop 21.1 Set track bumper stop position 20.1.1 Set bumper stop position. Fig. 21.1.1 Program switches OPEN position 1. Set program switch to OPEN. 2. Door moves to set opening angle.
  • Page 79: Install Push Arm Door Stop (Optional Assembly)

    ED100 / ED250 Installation Instructions – Fine cover Chapter 22 22 Install push arm door stop 22.1 Install push arm door stop (optional assembly) Fig. 22.1.1 Door stop assembly TIPS AND RECOMMENDATIONS 1/2" thick base plate Contact local dormakaba USA, Inc.
  • Page 80: Install Door Signage

    ED100 / ED250 Installation Instructions – Fine cover Chapter 23 23 Install door signage 23.1 Install door signage 23.1.1 Install door signage based on type of door operation. Install applicable door signage as outlined in Chapter 10, ED100 / ED250 door signage.
  • Page 81: Install Cover, End Caps And Spindle Caps

    ED100 / ED250 Installation Instructions – Fine cover Chapter 24 24 Install cover, end caps and spindle caps 24.1 Install cover and end caps 24.1.1 Install cover. Fig. 24.1.1 ED100 / ED250 standard cover 1. Align cover with operator, press inward until cover snaps into place.
  • Page 82: Install Spindle Caps

    24.2.1 Install spindle caps. 1. Install spindle caps on ED100 / ED250 cover. Spindle cap Spindle cap Fig. 24.2.2 Spindle cap installation, ED100 / ED250 cover top Spindle cap Spindle cap Fig. 24.2.3 Spindle cap installation, ED100 /ED250 cover bottom Spindle cap...
  • Page 83: Ansi/Bhma Standards

    ED100 / ED250 Installation Instructions – Fine cover Chapter 25 25 ANSI/BHMA standards 25.1 A156.10 Power operated pedestrian doors The following table references portions of content from ANSI/BHMA A156.10. Refer to the standard, available through ANSI or BHMA for additional information. Standard material reprinted with BHMA permission.
  • Page 84: A156.19 Low Energy Power Operated Doors

    ED100 / ED250 Installation Instructions – Fine cover Chapter 25 25.2 A156.19 Low energy power operated doors The following table references portions of content from ANSI/BHMA A156.19. Refer to the standard, available through ANSI or BHMA for additional information. Standard material reprinted with BHMA permission.
  • Page 85 ED100 / ED250 Installation Instructions – Fine cover Chapter 25 25.1.2 A156.19, Table I: Minimum opening and closing times. "W" door weight, pounds "D" door width, inches 3.0 s 3.0 s 3.0 s 3.0 s 3.5 s 3.0 s 3.5 s...
  • Page 86: Upgrade Cards

    26.1 Upgrade cards 26.2 Container module 26.1.1 Upgrade card installation. 26.2.1 Container module dormakaba upgrade cards can be used to expand the range of • The first upgrade card installed becomes functions of ED100 / ED250 operators. the container module.
  • Page 87: Installing Upgrade Cards

    ED100 / ED250 Installation Instructions – Fine cover Chapter 26 26.3 Installing upgrade cards 26.3.1 Set program switch to CLOSE. 26.3.3 Installing additional upgrade cards. Upgrade card slot Barrier free toilet 1. Remove container Set program switch to Close.
  • Page 88: Maintenance

    ED100 or ED250 operator configured for the low 7. Have door inspected by an 6. Have door inspected by an energy mode.
  • Page 89: Ed100 / Ed250 Environment And Cleaning

    27.3.3 Cleaning WARNING Cleaning of ED100 / ED250 cover surfaces must be done with program switches in Close position! AUTOMATIC ED100 / ED250 cover can be cleaned with a damp cloth CAUTION DOOR and commercial cleaning agents. DD0586-010 ACTIVATE SWITC H...
  • Page 90: Pull Arm Maintenance

    ED100 / ED250 Installation Instructions – Fine cover Chapter 27 27.5 Pull arm maintenance Fig. 27.5.1 Arm and track assembly Fig. 27.5.5 Program switch 27.5.1 Track mounting screws. 1. Set program switch to CLOSE. 2. Remove track end caps 3.
  • Page 91: Arm Fasteners - Torque Requirements

    ED100 / ED250 Installation Instructions – Fine cover Chapter 27 27.6 Arm fasteners – torque requirements 27.6.1 Check drive arm M8 SHCS torque. Fig. 27.6.1 Arm M8 SHCS cap 1. Set program switch to CLOSE. 2. Remove cap over M8 SHCS.
  • Page 92: Push Arm Maintenance

    ED100 / ED250 Installation Instructions – Fine cover Chapter 27 27.6 Push arm maintenance Fig. 27.6.1 Push arm assembly 27.6.1 Push arm maintenance. WARNING Set program switch to CLOSE before performing maintenance! 1. Adjustment arm. • Check for wear or damage.
  • Page 93: Appendix A - Driving Parameters

    ED100 / ED250 Installation Instructions – Fine cover Appendix A Appendix A - Driving parameters Driving parameters – detail A.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Opening speed, automatic mode 1. Opening speed refers to automatic mode, speed can be adjusted using this parameter.
  • Page 94 ED100 / ED250 Installation Instructions – Fine cover Appendix A A.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Wall masking on door hinge side 1. Wall masking required if door opens against an obstacle. 2. When door reaches set wall masking angle, system will ignore signal from safety sensor on door swing (hinge) side.
  • Page 95 ED100 / ED250 Installation Instructions – Fine cover Appendix A A.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Delayed opening time for locking 1. Delayed opening time delay starts as soon as door opening pulse has been generated.
  • Page 96 ED100 / ED250 Installation Instructions – Fine cover Appendix A A.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Motor driven latching action, automatic 1. System offers a motor driven latching action in automatic mode in addition to mode mechanical latching action.
  • Page 97 1. Status relay activated when door is opened further than opening angle parameter OA, set during learning cycle. 2. Parameter OA value can only be changed using dormakaba handheld or by performing another learning cycle. Locking device output configuration;...
  • Page 98 Service interval is reset to 12 months. • Yellow LED not illuminated. 0 - 1 2. Parameter is then automatically reset to "0". 3. Values other than default values must be set using dormakaba USA, Inc. handheld: • Maintenance interval •...
  • Page 99 ED100 / ED250 Installation Instructions – Fine cover Appendix A A.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Opening angle 1. Door opening angle set during learning cycle is displayed. 2. Opening angle can only be changed during learning cycle.
  • Page 100 ED100 / ED250 Installation Instructions – Fine cover Appendix A A.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Upgrade card units codes Upgrade card not installed, function not available. Upgrade card installed, function not activated. 0 - 3 Upgrade card installed, function activated.
  • Page 101 ED100 / ED250 Installation Instructions – Fine cover Appendix A A.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting COM 1 configuration interface Interface programmed for communication with dormakaba handheld. 0 - 1 Interface programmed for use with dormakaba TMS Soft control software.
  • Page 102 ED100 / ED250 Installation Instructions – Fine cover Appendix A A.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Castor angle for double doors Primary door with astragal, angle active door must open before secondary door opens.
  • Page 103: Appendix B - Troubleshooting

    ED100 / ED250 Installation Instructions – Fine cover Appendix B Appendix B - Troubleshooting Information and error codes B.1.1 Overview Fig. B.1.1 User interface Operator monitors internal circuits and external safety 4 button keypad circuits managed by the operator.
  • Page 104: Red Led Status Codes

    ED100 / ED250 Installation Instructions – Fine cover Appendix B B.1.7 Error message memory. 1. There are ten error message memory locations; E 0 through E 9. 2. The latest error message is always stored in error memory location E 0: •...
  • Page 105: Troubleshooting Chart, "Ln" Codes

    ED100 / ED250 Installation Instructions – Fine cover Appendix B Troubleshooting chart, "ln" codes B.3.1 Troubleshooting chart, information messages. Display Description Troubleshooting information messages Sustained operation on a door with an obstruction can result in damage to drive. 1. Object or person obstructing door movement.
  • Page 106: Troubleshooting Chart, "E" Codes

    ED100 / ED250 Installation Instructions – Fine cover Appendix B B.3.1 Troubleshooting chart, information messages. Display Description Troubleshooting information messages Communication error, double 1. Check communication cable connection at the two operators. door system • No communication • Cable connects to the horizontal RJ 45 connector next to the user ln 61 between the two operators.
  • Page 107 ED100 / ED250 Installation Instructions – Fine cover Appendix B B.4.1 Troubleshooting chart, "E" codes. Display Red LED • Description Troubleshooting error codes Overcurrent detection 1. Motor is consuming too much power, check for any external • Motor is consuming more Flashing causes.
  • Page 108: Appendix C - Dormakaba Handheld

    ED100 / ED250 Installation Instructions – Fine cover Appendix C Appendix C - dormakaba handheld dormakaba handheld terminal C.1.2 Handheld key functions. 1. OFF ON, switches Handheld on or off. Fig. C.1.1 dormakaba handheld 2. Function keys F1 - F3, trigger functions shown in bottom line of display (e.g., "RPT"...
  • Page 109: Dormakaba Handheld; Configuration Parameters

    ED100 / ED250 Installation Instructions – Fine cover Appendix C NOTICE Parameters and detail may change depending on firmware version. dormakaba handheld; configuration parameters "#" refers to reference numbers in Parameter list, Chapter 18. C.2.1 Configuration parameters Parameter and...
  • Page 110: Dormakaba Handheld; Driving Parameters

    ED100 / ED250 Installation Instructions – Fine cover Appendix C C.2.1 Configuration parameters Parameter and Parameter and Description / Selections Description / Selections default default Manual mode on. NO contact; night- Manual bank function mode Normal* Manual mode disabled.
  • Page 111: Dormakaba Handheld; Special Functions

    ED100 / ED250 Installation Instructions – Fine cover Appendix C dormakaba handheld; special functions (Upgrade cards) ED100 / ED250 C.4.1 Special functions (upgrade cards) Parameter and Parameter and Description / Selection Description / Selection default default • locked: not available...
  • Page 112: Dormakaba Handheld; Diagnostics

    ED100 / ED250 Installation Instructions – Fine cover Appendix C dormakaba handheld; diagnostics C.5.1 Diagnostics Parameter name Description Setting Parameter name Description Setting FW vers BM Displays firmware (FW) x.x y y (e.g.,0190 Wartungs x x y y (month, version of basic module v 1.9.0)
  • Page 113 ED100 / ED250 Installation Instructions – Fine cover Appendix C C.5.1 Diagnostics Parameter name Description Setting Parameter name Description Setting Clamp X3, 1G and 3, 0, low active Klemme 1G 24 V out Setting code (function on) 1, function off...
  • Page 114: New Dormakaba Handheld; Language

    ED100 / ED250 Installation Instructions – Fine cover Appendix C New dormakaba handheld; language change to English C.6.1 New dormakaba handheld; language 5. Press to select Sprachen (Fig. 26.6.6). ENTER Fig. C.6.1 change. Fig. C.6.7 Sprachauswahl (Language dormakaba handheld...
  • Page 115: Dormakaba Handheld; Firmware Update

    ED100 / ED250 Installation Instructions – Fine cover Appendix C dormakaba handheld; firmware update C.7.1 Firmware update procedure CAUTION For all firmware changes, set program switch to CLOSE and allow door to close completely before any updates are made! Fig.
  • Page 116 ED100 / ED250 Installation Instructions – Fine cover Appendix C Fig. C.7.5 Select Firmware upload Fig. C.7.4 Select UpDoLd ENTER button F2 button Up/down arrows DOWN/UPLOAD Connected with: Download data ED100_US Upload file FW-Version: 02.30 Firmware upload Revision: Door Again UpDoLd Door 4.
  • Page 117 ED100 / ED250 Installation Instructions – Fine cover Blank page This page left intentionally blank. ED100 / ED250 DL4615-005 01-2020...
  • Page 118: Appendix D - Full Width Cover Options

    ED100 / ED250 Installation Instructions – Fine cover Appendix D Appendix D - Full width cover options Full width cover installation instructions – single door Fig. D.1.1 Mounting plate D.1.1 Install ED100 / ED250 mounting plate. Mounting plate installation: •...
  • Page 119 DC3482-010 Program switch wiring. Once ED100 / ED250 operator is installed, program switch wires will be connected to terminal board (Fig. D.1.10). Fig. D.1.9 ED100 / ED250 installation with mounting plate extension Professional cover bracket DC3481-010 Program switch kit DC3482-010 Program switch Fig.
  • Page 120 ED100 / ED250 Installation Instructions – Fine cover Appendix D Full width cover installation instructions – double door D.2.1 Full width cover kit, double door DK3401-07X Fig. D.2.1 Full width cover kit DK3401-05X Cover, pair End cap set DC3466-01X...
  • Page 121 ED100 / ED250 Installation Instructions – Fine cover Appendix D Fig. D.2.4 Mounting plate connectors and fasteners 2. Secure the operator mounting plates to the pair mounting plate (6) using: • (2) mounting plate connectors (4) • (2) M6 x 10 mm SHS with washer (8) •...
  • Page 122: Appendix E - Wiring Diagrams

    ED100 / ED250 Installation Instructions – Fine cover Appendix E Appendix E - Wiring diagrams E1.1 DX4604-21C Key Switch Panel with RJ45 connector Fig. E1.1.1 Key switch panel Fig. E1.1.2 Key switch panel wiring diagram DX4604-21C 3 B A 1...
  • Page 123: E2.1 Dx4604-11C Key Switch Panel

    ED100 / ED250 Installation Instructions – Fine cover Appendix E E2.1 DX4604-11C Key Switch Panel Fig. E2.1.1 Key switch panel Fig. E2.1.2 Key switch panel wiring diagram DX4604-11C 3 B A 1 57 57a 15 17 13 3 Swing...
  • Page 124 USA, Inc. 1 Dorma Drive, Drawer AC Reamstown, PA 17567 T: 717-336-3881 www.dormakaba.com F: 717-336-2106...

This manual is also suitable for:

Ed250

Table of Contents