Installing Active Bus Modules And Modules; Figure 3-2 Protective Conductor Connection On The Mounting Rail - Siemens SIMATIC ET 200PA SMART Operating Instructions Manual

Process
Hide thumbs Also See for SIMATIC ET 200PA SMART:
Table of Contents
Protective conductor connection
The following figure shows you how to realize the protective conductor connection on the
mounting rail.
Figure 3-2
See also
Clearance Measurements (Page 18)
3.2.3

Installing active bus modules and modules

Installing bus modules and modules
To install the active bus modules and modules, proceed as follows:
ET 200PA SMART
Operating Instructions, 06/2019, A5E34192013-AB
Protective conductor connection on the mounting rail
Installation
3.2 Installation
35
Table of Contents
loading

This manual is also suitable for:

Simatic pcs 7

Table of Contents