Removing The Cover And Thermal Insulation - Daikin Altherma M ECH2O Series Installation And Maintenance Instructions Manual

Table of Contents
4.3

Removing the cover and thermal insulation

● Raise the cover at the rear and remove forwards.
Fig. 4-6
Remove the protective cover
If the installation conditions require the hydraulic con-
nection directly upwards, the cover can be cut out along
the broken line.
Fig. 4-7
Producing the cover cut-out
Fig. 4-8
Daikin Altherma M ECH
Daikin Altherma M ECH
O
2
Solar storage tank with heating controller
008.1446799_00 – 07/2019 – EN
O without protective cover
2
4
x
Set-up and installation
CAUTION!
The thermal insulation (fig. 4-8, item A) consists
of pressure-sensitive EPP moulded parts that
can be easily damaged if not handled correctly.
● Only remove the thermal insulation in the
order stated below and in the stated direc-
tions.
● Do not use force.
● Do not use tools.
● Remove the thermal insulation in the following order:
– Pull the side insulating element off horizontally (fig. 4-9,
item A).
– Pull the rear insulating element off horizontally (fig. 4-9,
item B).
– Pull the front insulating element off horizontally (fig. 4-9,
item C).
Fig. 4-9
Removing the top thermal insulation
● As required: Remove the bottom thermal insulation in the fol-
lowing order:
– Pull the side insulating element off vertically (fig. 4-10,
item A).
– Pull the rear insulating element off vertically (fig. 4-10,
item B).
Installation and maintenance instructions
17
Table of Contents
loading

Table of Contents