Connection Diagram - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal (non-mitsubishi electric products 2)
Hide thumbs Also See for GOT2000 Series:
Table of Contents

11.3 Connection Diagram

The following diagram shows the connection between the GOT and the PLC.
11.3.1
RS-232 cable
■1. Connection diagram
(1) RS-232 connection diagram 1)
(2) RS-232 connection diagram 2)
*1
For details of the pin assignment, refer to the following manual.
■2. Precautions when preparing a cable
(1) Cable length
The length of the RS-232 cable must be 15m or less.
(2) GOT side connector
For the GOT side connector, refer to the following.
1.4.1 GOT connector specifications
(3) GE PLC side connector
Use the connector compatible with the GE PLC side module.
For details, refer to the GE PLC user's manual.
GOT side
CD
1
RD(RXD)
2
SD(TXD)
3
ER(DTR)
4
SG
5
DR(DSR)
6
RS(RTS)
7
CS(CTS)
8
NC
9
FG
-
GOT side
CD
1
RD(RXD)
2
SD(TXD)
3
ER(DTR)
4
SG
5
DR(DSR)
6
RS(RTS)
7
CS(CTS)
8
NC
9
FG
-
GE PLC user's Manual
Communication Modules
SHILD
1
TD
2
RD
3
RTS
4
SG
7
CTS
5
DCD
8
DTR
20
* 1
PLC
TXD
4
RXD
3
RTS
1
GND
8
CTS
2
DCD
5
DTR
6
5V
7
11.3 Connection Diagram
11
11 - 9
Table of Contents
loading

Table of Contents