Honeywell RP920A Installation Instructions Manual

Honeywell RP920A Installation Instructions Manual

Modular pneumatic controllers
Available languages

Available languages

INSTALLATION

Adjustments Before Mounting

1. If a connection to port 4, 6, 7, or 8 (Fig. 2) is required,
remove the self-tapping screw from port 8 and use the
screw to tap the appropriate port.
2. Install 14003755-001 Barb Fitting and O-ring finger-tight
in the appropriate port.
3. Reinstall the screw in port 8 if not used.
4. If a remote restriction is used for the primary sensor,
block the internal air supply (adjustable after gage
installation, but easier to adjust before installation):
a. Loosen the screw one turn (Fig. 3) and rotate the
switchplate (light grey) 90 degrees counterclockwise
to the sensor supply blocked position.
b. Retighten the screw and check for leaks. If a leak is
found, reposition the switchplate.
NOTES:
The switchplate screw must be tightened securely
to prevent a false inoperative sensor condition.
The compensation sensor on port 5 requires an
external restricted main air supply.

Device Mounting

1. Mark and drill two No. 8 fastener mounting holes using
the controller or Fig. 1 dimensions as a template.
2. Mount the controller with two No. 8 fasteners (not
supplied).

Connections

1. Push the tubing on the port barb fittings according to
the job drawings. See Fig. 2 for port locations.
2. Install the gage or plug:
a. If no gage is used, tighten gage plugs finger-tight.
If a gage is used, remove the plug and, by hand,
screw the gage into the gage port three turns.
b. If the gage is not oriented for correct viewing, rotate
the gage counterclockwise until correct.
NOTE: A soft-rubber, factory-installed seal allows
plug or gage rotation (for alignment) without
leakage.
® U.S. Registered Trademark
Copyright © 2000 Honeywell • All Rights Reserved
RP920A,B,C,D
INSTALLATION INSTRUCTIONS
3 (75) MINIMUM CLEARANCE
1/8 (3)
MINIMUM
RP920A: 1-1/2 (36)
RP920B-D: 3-1/4 (83)
SPACING
BETWEEN
RP920A: 1-7/8 (48)
MODULES
RP920B-D: 3-13/16 (96)
Fig. 1. RP920 Dimensions in in. (mm).
After Mounting Adjustments and Changes
Controller Action Change
1. Loosen the four Proportional Module screws (Fig. 4).
2. Remove the module.
3. Rotate the module and its gasket 180 degrees, and
reinstall. Ensure that the notch on the module lines up
with the proper indication on the controller label (base).
4. Retighten the four screws.
5. Recalibrate if required.
Negative (Winter) to Positive (Summer)
Compensation Change (RP920B and D only)
1. Loosen the four compensation module screws (Fig. 5).
2. Remove the module.
3. Rotate the module and its gasket 180 degrees, and
reinstall. Ensure that the notch on the module lines up
with the proper indication on the controller label (base).
4. Retighten the four screws.
5. Recalibrate, if required.
5-7/8
(148)
4
(102)
3-3/8 (86)
9/32
(7)
M17581
95- 7392EF
Table of Contents
loading

Summary of Contents for Honeywell RP920A

  • Page 1 (for alignment) without with the proper indication on the controller label (base). leakage. 4. Retighten the four screws. 5. Recalibrate, if required. ® U.S. Registered Trademark Copyright © 2000 Honeywell • All Rights Reserved 95- 7392EF...
  • Page 2 RP920A,B,C,D MODULAR PNEUMATIC CONTROLLERS 1 – MAIN 1 – MAIN 2 – BRANCH 2 – BRANCH 3 – PRIMARY 3 – PRIMARY SENSOR SENSOR 4 – VENT 4 – VENT 5 – COMPENSATION 8 – CLOSED/REMOTE SENSOR SETPOINT 6 – VENT 9 –...
  • Page 3 RP920A,B,C,D MODULAR PNEUMATIC CONTROLLERS Adjustments: 1. If using a scaleplate overlay, insert the overlay between CAPTIVE SCREW (4) COMPENSATION MODULE the setpoint knob and the transparent overlay retainer. Note positions of the key and non-coded scaleplate overlay notch (Fig. 7).
  • Page 4 RP920A,B,C,D MODULAR PNEUMATIC CONTROLLERS CALIBRATION SETPOINT SETPOINT SCALEPLATE OVERLAY KNOB KEY KNOB "R" CODED SCALEPLATE Sensors OVERLAY NOTCH Sensors are calibrated to the system and require no separate OVERLAY calibration. RETAINER Systems All RP920 Controllers are factory calibrated. It is intended that...
  • Page 5 ) and desired 3. Calibrate the RP920: startpoint do not match, remove the knob and replace it a. RP920C: follow the procedure for the RP920A. so they do match. b. RP920D: follow the procedure for the RP920B 7. The compensation startpoint (W ) is now calibrated.
  • Page 6 STARTPOINT (W ) c (–18C) COMPENSATION SENSOR C5115 Fig. 14. Calibration example reset schedule. Home and Building Control Home and Building Control Honeywell Asia Pacific Inc. Honeywell Europe S.A. Honeywell Latin American Region Honeywell Honeywell Limited-Honeywell Limitée Room 3213-3225 3 Avenue du Bourget...
  • Page 7 REMARQUE : Un joint de caoutchouc souple installé en usine permet de faire tourner le manomètre (pour le mettre dans la bonne position) sans provoquer de fuites. ® Marque déposée aux É.-U. Copyright © 2000 Honeywell Tous droits réservés 95- 7392EF...
  • Page 8 RÉGULATEURS PNEUMATIQUES MODULAIRES RP920A,B,C,D 1 - CANALISATION PRINCIPALE 1 - CANALISATION 2 - CANALISATION SECONDAIRE PRINCIPALE 3 - CAPTEUR PRIMAIRE 2 - CANALISATION 4 - ÉVENT SECONDAIRE 5 - CAPTEUR DE 3 - CAPTEUR COMPENSATION PRIMAIRE 6 - ÉVENT 4 - ÉVENT 7 - ÉVENT...
  • Page 9 RÉGULATEURS PNEUMATIQUES MODULAIRES RP920A,B,C,D Passage de la compensation négative (hiver) à la 7. Raccorder les composants de commutation du blocage de l’action intégrale aux orifices 6 et 7, selon le cas. compensation positive (été) (RP920B et D seulement) 1. Desserrer les quatre vis (Fig. 5) du module de Réglage du point de consigne (W...
  • Page 10 RÉGULATEURS PNEUMATIQUES MODULAIRES RP920A,B,C,D Réglage de l’autorité (A ) (RP920B et D seulement) Ajustements : 1. Installer une canalisation entre le dispositif de réglage Régler l’autorité (A ) selon les plans en utilisant le bouton de du point de contrôle et l’orifice 9.
  • Page 11 RÉGULATEURS PNEUMATIQUES MODULAIRES RP920A,B,C,D 2. Installer un manomètre de 0 à 30 psi (0 à 207 kPa) dans REMARQUE : — Le régulateur est conçu de façon que tous les la prise d’essai de la canalisation secondaire ou dans réglages puissent être effectués indépendamment l’orifice de manomètre de la canalisation secondaire s’il...
  • Page 12 RÉGULATEURS PNEUMATIQUES MODULAIRES RP920A,B,C,D 15. Ajuster le bouton de réglage de l’autorité (A ) jusqu’à ce que la pression de la canalisation secondaire PLEINE corresponde à la pression prévue de l’appareil à régler COMPENSATION aux conditions de pleine compensation. 16. L’étalonnage est maintenant terminé.
  • Page 13 RÉGULATEURS PNEUMATIQUES MODULAIRES RP920A,B,C,D Tableau 2. Tableau de compensation Réglages d’origine : Point de consigne (W ) = 120°F (49°C) Capteur de = 40% = 7,8 psi (53,8 kPa) GAMME DE Capteur primaire compensation Pour la cinquième étape d’étalonnage :...
  • Page 14 RÉGULATEURS PNEUMATIQUES MODULAIRES RP920A,B,C,D APPENDIX / ANNEXE Table 3. Sensor Value to Equivalent Percentage or Equivalent Pressure Conversion Chart. Tableau 3. Tableau de conversion des valeurs du capteur en pourcentage équivalent ou en pression équivalente. LP915A Humidity Sensors TP925, Capteurs d’humidité...
  • Page 15 RÉGULATEURS PNEUMATIQUES MODULAIRES RP920A,B,C,D Table 3. Sensor Value to Equivalent Percentage or Equivalent Pressure Conversion Chart. (Continued) Tableau 3. Tableau de conversion des valeurs du capteur en pourcentage équivalent ou en pression équivalente. LP915A Humidity Sensors TP925, Capteurs d’humidité LP914...
  • Page 16 — — By using this Honeywell literature, you agree that Honeywell will have no liability for any damages arising out of your use or modification to, the literature. You will defend and indemnify Honeywell, its affiliates and subsidiaries, from and against any liability, cost, or damages, including attorneys’...

This manual is also suitable for:

Rp920cRp920bRp920d

Table of Contents