ABB i-bus KNX Product Manual

Time receiver gps, tr/a 1.1
Hide thumbs Also See for i-bus KNX:

Quick Links

PRODUCT MANUAL
ABB i-bus® KNX
TR/A 1.1
Time Receiver GPS
Table of Contents
loading

Summary of Contents for ABB i-bus KNX

  • Page 1 — PRODUCT MANUAL ABB i-bus® KNX TR/A 1.1 Time Receiver GPS...
  • Page 3: Table Of Contents

    ® ABB i-bus Contents Page Contents General ....................3 Using the product manual ......................3 Notes ............................4 Overview of product and functions ....................5 Device technology ................7 Technical data ..........................7 Connection diagram ........................9 Dimension drawing ........................10 Mounting and installation ......................11...
  • Page 4 ® ABB i-bus General 2 2CDC509082D0201 | TR/A 1.1...
  • Page 5: General

    Using the product manual This manual provides detailed technical information relating to the function, installation and programming ® of the ABB i-bus KNX Time Receiver GPS TR/A 1.1. The device is explained using examples. This manual is divided into the following chapters:...
  • Page 6: Notes

    ® ABB i-bus General Notes Notes and safety instructions are represented as follows in this manual: Note Tips for usage and operation Examples Application examples, installation examples, programming examples Important These safety instructions are used as soon as there is danger of a malfunction without risk of damage or injury.
  • Page 7: Overview Of Product And Functions

    ® ABB i-bus General Overview of product and functions The Time Receiver GPS is used to receive the current time and to send it on the KNX bus. This allows the Time Receiver GPS to act as the internal clock for every time switch or also for devices with time- dependent logic.
  • Page 9: Device Technology

    ® ABB i-bus Device technology Device technology The Time Receiver GPS is a surface The TR/A 1.1 is powered via the ® mounted device. Physical address ABB i-bus and does not require an assignment and device parameterization additional auxiliary voltage supply.
  • Page 10 Note ETS and the current version of the device application are required for programming. The current version of the application is available for download at www.abb.com/knx. After import into ETS, it is available in ETS under ABB/Timer/Switch. The device does not support the locking function of a KNX device in ETS. Using a BCU code to block access to all the project devices has no effect on this device.
  • Page 11: Connection Diagram

    ® ABB i-bus Device technology Connection diagram TR/A 1.1 Programming button Programming LED Bus connection terminal GPS reception LED TR/A 1.1 | 2CDC509082D0201 9...
  • Page 12: Dimension Drawing

    ® ABB i-bus Device technology Dimension drawing 10 2CDC509082D0201 | TR/A 1.1...
  • Page 13: Mounting And Installation

    Commissioning requirement ® In order to commission the device, a PC with ETS, as well as a connection to the ABB i-bus e.g. via a KNX interface, is required. The device is ready for operation after the bus voltage is applied. No auxiliary voltage is required.
  • Page 14 ® ABB i-bus Device technology Supplied state The device is supplied with the physical address 15.15.255. The application is pre-installed. Hence, only group addresses and parameters need to be loaded during commissioning. The complete application can be reloaded if required. Downloads may take longer after a change of application or a discharge.
  • Page 15: Commissioning

    Parameters The ETS Engineering Tool Software is used to parameterize the device. The application is available in ETS under ABB/Timer/Switch. This chapter describes the device parameters using the parameter windows. Parameter windows are structured dynamically so that further parameters are enabled depending on the parameterization and function of the outputs.
  • Page 16: Parameter Window Time Standard - Date/Time

    ® ABB i-bus Commissioning Parameter window Time standard – Date/Time The time standard settings can be made in this parameter window. Time offset to UTC [hh:mm] Options: -12:00 -11:30 -11:00 … 0:00 +0:30 +1:00 … +12:00 The time offset to UTC (Greenwich Mean Time) is set with the parameter. The time is added to the value received via GPS and then sent on the bus.
  • Page 17 ® ABB i-bus Commissioning Date/time by receiver or bus value Options: Receiver (internal) Bus (external) This parameter is used to select whether the internal GPS receiver is to be used to control the integrated time switches or whether the value is to be received externally via the bus.
  • Page 18: Parameter Window Time Standard - Daylight Saving Time

    ® ABB i-bus Commissioning Parameter window Time standard – Daylight saving time The parameters in this window are used to define the beginning and end of daylight saving time. Select DST rule Options: No DST DST according to local time...
  • Page 19 ® ABB i-bus Commissioning Time DST begins Options: 0:00 0:30 1:00 … 2:00 2:30 … +23:30 The parameter determines the time when daylight saving time should begin. Time DST ends Options: Same as start of DST +1h as start of DST This parameter defines the time when daylight saving time should end.
  • Page 20 ® ABB i-bus Commissioning Weekday or fixed date DST begins Options: Weekday Date The parameter defines whether daylight saving time should always begin on a fixed weekday or on a fixed date. The following parameters are displayed if Weekday is selected.
  • Page 21 ® ABB i-bus Commissioning The following parameters are displayed if Date is selected. Month DST begins Options: January February March April June July August September October November December The parameter determines the month when daylight saving time begins. Day DST begins Options: 1 …...
  • Page 22 ® ABB i-bus Commissioning Weekday or fixed date DST ends Options: Weekday Date The parameter defines whether daylight saving time should always end on a fixed weekday or on a fixed date. The following parameters are displayed if Weekday is selected.
  • Page 23 ® ABB i-bus Commissioning The following parameters are displayed if Date is selected. Month DST ends Options: January February March April June July August September October November December The parameter determines the month when daylight saving time ends. Day DST ends Options: 1 …...
  • Page 24: Parameter Window Gps Coordinates And Sun Data - Gps Coordinates

    ® ABB i-bus Commissioning Parameter window GPS coordinates and sun data – GPS coordinates The settings for reception of the GPS coordinates are made in this parameter window. Parameters can be used to define how the values are received and whether the coordinates are to be sent on the bus.
  • Page 25 ® ABB i-bus Commissioning The following parameter appears with the option Receiver (internal): Send GPS coordinates Options: Never On request On request and automatically/cyclically • Never: Sending on the bus is deactivated. • On request: The 1-bit object Bus request to send GPS coordinates – Reception is activated.
  • Page 26: Parameter Window Gps Coordinates And Sun Data - Gps Sun Data

    ® ABB i-bus Commissioning Parameter window GPS coordinates and sun data – GPS sun data All settings for the GPS sun data are made in this parameter window. This allows the sun azimuth and elevation, as well as the sunrise and sunset times, to be sent on the bus.
  • Page 27 ® ABB i-bus Commissioning Send sun azimuth and elevation Options: Never On request On request and automatically/cyclically This parameter can be used to decide when the current position of the sun (azimuth and elevation) is to be sent on the bus.
  • Page 28 ® ABB i-bus Commissioning Send sunrise/sunset times Options: Never On request On request and automatically/cyclically This parameter can be used to decide when the current sunrise and sunset times are to be sent on the bus. • Never: Sending on the bus is deactivated.
  • Page 29: Parameter Window Gps Coordinates And Sun Data - Fault And State Interval

    ® ABB i-bus Commissioning Parameter window GPS coordinates and sun data – Fault and state interval The settings for sending the GPS reception status can be made in this parameter window. Minutes before time receiver changes to "not OK" Options: 15 …...
  • Page 30 ® ABB i-bus Commissioning Send GPS state Options: Never On change On change and automatically/cyclically This parameter can be used to decide when the state of GPS reception is to be sent on the bus. • Never: Sending on the bus is deactivated.
  • Page 31: Parameter Window Time Switch Standard - Settings

    ® ABB i-bus Commissioning Parameter window Time switch Standard – Settings The settings for the time switch Standard are made in this parameter window. A switching signal can be sent on the bus and cancelled again at a certain time with this simple (daily) time switch. This allows the exterior lighting to be switched on/off at the same time each day, for example.
  • Page 32: Parameter Window Time Switch Standard - 1St Switching Time

    ® ABB i-bus Commissioning Parameter window Time switch Standard – 1st switching time The settings for the first switch-on and switch-off times of time switch Standard are made in this parameter window. Switch on from [hour] Option: 0 … 18 … 23 The hour at which switch-on is to occur is defined here.
  • Page 33: Parameter Window Time Switch Standard - 2Nd Switching Time

    ® ABB i-bus Commissioning Parameter window Time switch Standard – 2nd switching time The settings for the second switch-on and switch-off times of time switch Standard are made in this parameter windo Switch on from [hour] Option: 0 … 18 … 23 The hour at which switch-on is to occur is defined with this parameter.
  • Page 34: Parameter Window Time Switch Astro - Settings

    ® ABB i-bus Commissioning Parameter window Time switch Astro – Settings All settings for time switch Astro are made in this parameter window. Switching times can be activated following the sunrise and sunset times (function of an astronomical time switch). Depending on the parameterization, a value (switching bit or scene) is sent on the bus at sunrise and sunset.
  • Page 35 ® ABB i-bus Commissioning Astro time switch application Options: OFF at darkness / ON at brightness ON at darkness / OFF at brightness • OFF at darkness / ON at brightness: The time switch Astro switches off at darkness and on at brightness.
  • Page 36: Parameter Window Time Switch Astro Plus

    ® ABB i-bus Commissioning Parameter window Time switch Astro Plus All settings for time switch Astro Plus are made in this parameter window. Switching times can be activated following the sunrise and sunset times (function of an astronomical time switch). Depending on the parameterization, a value (switching bit or scene) is sent on the bus at sunrise and sunset.
  • Page 37 ® ABB i-bus Commissioning Astro Plus time switch application Options: OFF at darkness / ON at brightness ON at darkness / OFF at brightness • OFF at darkness / ON at brightness: The time switch Astro Plus switches off at darkness and on at brightness.
  • Page 38: Parameter Window Time Switch Astro Plus - Astro Time Switch Offset

    ® ABB i-bus Commissioning Parameter window Time switch Astro Plus – Astro time switch offset The offset settings for the switching times of time switch Astro Plus can be made in this parameter window. This permits earlier or later switch-on and switch-off.
  • Page 39: Parameter Window Time Switch Astro Plus - Extra Time Switch

    ® ABB i-bus Commissioning Parameter window Time switch Astro Plus – Extra time switch The settings for the extra switching times can be made in this parameter window. The window is visible only if the Extra time switch parameter is set to Active in the Settings parameter window.
  • Page 40 ® ABB i-bus Commissioning Switch off from [hour] Option: 0 … 18 … 23 The hour of the switch-off time is defined with this parameter. The scene value or the corresponding switching-bit value defined for “Off” will be sent at this time.
  • Page 41 ® ABB i-bus Commissioning Switch ON Options: Inactive Active An additional “On” period can be activated for time switch Astro Plus with this parameter. An “On” signal is additionally sent via the output object of the time switch during this period, e.g. to switch on lighting additionally during a certain period.
  • Page 42: Parameter Window Light - Light Sensor

    ® ABB i-bus Commissioning Parameter window Light – Light sensor The settings for the light sensor are made in this parameter window. The light sensor’s measurement value can be sent on the bus and/or light control can be activated (twilight switch function). Corresponding...
  • Page 43 ® ABB i-bus Commissioning The parameter is used to set when the value of the internal brightness sensor is to be sent. • Never: Sending on the bus is deactivated. • On request: The 1-bit object Bus request to send lux – Reception is activated. The measured lux value is sent on the bus via the corresponding object when the “On”...
  • Page 44: Parameter Window Light - Light Control

    ® ABB i-bus Commissioning Parameter window Light – Light control The light control settings can be made in this parameter window. Lux switching Options: Inactive Active This parameter is used to set whether light control is activated or deactivated. •...
  • Page 45 ® ABB i-bus Commissioning Light control depending on internal measurement or external bus value Options: Measurement value (internal) Bus (external) This parameter is used to select whether the internal brightness sensor is to be used to measure the brightness or whether the value is to be received externally via the bus.
  • Page 46 ® ABB i-bus Commissioning Threshold 2 Options: Inactive Active A second switching threshold for brightness-dependent control can be enabled with this option. • Inactive: The second brightness threshold is deactivated. • Active: The second brightness threshold is active. The dependent parameter page Threshold 2 and the object Sends light above/below threshold 2 –...
  • Page 47: Parameter Window Light - Threshold 1

    ® ABB i-bus Commissioning 3.2.14.1 Parameter window Light – Threshold 1 The settings for brightness control threshold 1 are made in this window. The data entered here influence the object Sends light above/below threshold 1 – Sending. Threshold in [lux] Options: 1 …...
  • Page 48 ® ABB i-bus Commissioning Delay darkness in [s] Options: 0 … 60 … 3,600 The parameter is used to define a delay for falling below the parameterized threshold. Switchover takes place only after the threshold (plus hysteresis) has been fallen below for the parameterized time.
  • Page 49 ® ABB i-bus Commissioning Enable blocking object Options: A 1-bit object to block brightness control can be enabled with this object. If brightness control is blocked, the output object is no longer changed until the block is canceled, even if the brightness exceeds/falls below the parameterized thresholds.
  • Page 50 ® ABB i-bus Commissioning Reaction on removing the block Options: Send current value No action The parameter defines the brightness control reaction when the block is canceled. • Send current value: The currently valid brightness control value is sent. •...
  • Page 51: Parameter Window Light - Threshold 2

    ® ABB i-bus Commissioning 3.2.14.2 Parameter window Light – Threshold 2 The settings for brightness control threshold 2 are made in this window The data entered here influence the object Sends light above/below threshold 2 – Sending. Threshold in [lux] Options: 1 …...
  • Page 52 ® ABB i-bus Commissioning Delay darkness in [s] Options: 0 … 60 … 3,600 The parameter is used to define a delay for falling below the parameterized threshold. Switchover takes place only after the threshold (plus hysteresis) has been fallen below for the parameterized time.
  • Page 53 ® ABB i-bus Commissioning Enable blocking object Options: A 1-bit object to block brightness control can be enabled with this object. If brightness control is blocked, the output object is no longer changed until the block is canceled, even if the brightness exceeds/falls below the parameterized thresholds.
  • Page 54 ® ABB i-bus Commissioning Reaction on removing the block Options: Send current value No action The parameter defines the brightness control reaction when the block is canceled. • Send current value: The currently valid brightness control value is sent. •...
  • Page 55: Parameter Window Light - Extra Time Switch

    ® ABB i-bus Commissioning 3.2.14.3 Parameter window Light – Extra time switch The settings for the extra switching times can be made in this parameter window. The window is visible only when the Extra time switch parameter is set to Active in the Light control parameter window. The extra switching times affect both threshold objects (Sends light above/below threshold 1 –...
  • Page 56 ® ABB i-bus Commissioning Switch off from [hour] Option: 0 … 18 … 23 The hour of the switch-off time is defined with this parameter. The scene value or the corresponding switching-bit value defined for “Off” will be sent at this time.
  • Page 57 ® ABB i-bus Commissioning Switch ON Options: Inactive Active An additional “On” period can be activated for time switch Astro Plus with this parameter. An “On” signal is additionally sent via the output object of the time switch during this period, e.g. to switch on lighting additionally during a certain period.
  • Page 58: Parameter Window Temperature -Temperature Sensor

    ® ABB i-bus Commissioning Parameter window Temperature –Temperature sensor The parameter window is used to make the settings for the integrated temperature sensor. The temperature sensor can be used to put the outside temperature on the KNX bus. Send measurement value...
  • Page 59 ® ABB i-bus Commissioning The parameter is used to set when the value of the internal temperature sensor is to be sent. • Never: Sending on the bus is deactivated. • On request: The 1-bit object Bus request to send temperature – Reception is activated.
  • Page 60: Parameter Window Temperature -Temperature Control

    ® ABB i-bus Commissioning Parameter window Temperature –Temperature control The parameter window is used to make the temperature control settings. Simple (outside) temperature- dependent control can be implemented with temperature control. The measured temperature is compared with a pre-parameterized threshold here, and the output object is switched over correspondingly. A 1-bit switching object or a 1-byte scene object is available as the output object here.
  • Page 61 ® ABB i-bus Commissioning Temperature control depending on internal measurement or external bus value Options: Measurement value (internal) Bus (external) This parameter is used to select whether the internal temperature sensor is to be used for temperature control or whether the value is to be received externally via the bus.
  • Page 62 ® ABB i-bus Commissioning Delay temperature setpoint in [s] Options: 0 … 60 … 3,600 A delay for evaluating the actual temperature with the setpoint temperature can be set in this parameter. This permits compensation for brief fluctuations, e.g. when the sun appears briefly through the cloud cover on a heavily overcast day.
  • Page 63 ® ABB i-bus Commissioning Switching bit or scene Options: Switching bit Scene • Switching bit: The 1-bit object Sends temperature above/below setpoint temperature – Sending is enabled. The object value changes according to the reaction parameterized in the Temperature logic parameter.
  • Page 64 ® ABB i-bus Commissioning Enable blocking object Options: A 1-bit object to block temperature control can be enabled with this object. If temperature control is blocked, the output object is no longer changed until the block is canceled, even if the temperature exceeds/falls below the parameterized setpoint temperature.
  • Page 65 ® ABB i-bus Commissioning Reaction on removing the block Options: Send current value No action The parameter defines the temperature control reaction when the block is canceled. • Send current value: The currently valid temperature control value is sent. •...
  • Page 66: Group Objects

    ® ABB i-bus Commissioning Group objects Note As standard, the write flag (with the exception of 1-bit group objects) is deleted with the group object values. Thus the group object value cannot be changed via the bus. If this function is required, the write flag must be set in ETS.
  • Page 67 ® ABB i-bus Commissioning Flags Data Point GO No. Function Name Length Type (DPT) Reception Bus request to send the temperature 1.017 1 bit Reception Bus request to send the light value 1.017 1 bit Sending Sends Astro 1.001 1 bit...
  • Page 68: General Group Objects

    ® ABB i-bus Commissioning General group objects Function Object name Data type Flags Sending Sends the current date on the 3-byte C, T bus – Sending DPT 11.001 The group object is enabled if the Send date and time parameter is set to On request or On request and automatically/cyclically in the Time standard –...
  • Page 69 ® ABB i-bus Commissioning Sending Sends the longitude on the 4-byte C, T bus – Sending DPT 14.007 The group object is enabled if the Send GPS coordinates parameter is set to On request or On request and automatically/cyclically in the GPS coordinates and sun data – GPS coordinates parameter window.
  • Page 70 ® ABB i-bus Commissioning Sending Sends sun azimuth (east=90°, 2-byte C, T south =180°) 2-byte – Sending DPT 9.xxx The group object is enabled if the Send sun azimuth and elevation parameter is set to On request or On request and automatically/cyclically in the GPS coordinates and sun data –...
  • Page 71 ® ABB i-bus Commissioning Sending Sends sun elevation, 2-byte – 2-byte C, T Sending DPT 9.xxx The group object is enabled if the Send sun azimuth and elevation parameter is set to On request or On request and automatically/cyclically in the GPS coordinates and sun data – GPS sun data parameter window.
  • Page 72 ® ABB i-bus Commissioning Reception Bus request to send sun 1-bit C, W times – Reception DPT 1.017 The group object is enabled if the Send sunrise and sunset times parameter is set to On request or On request and automatically/cyclically in the GPS coordinates and sun data –...
  • Page 73 ® ABB i-bus Commissioning Sending Sends Astro – Sending 1-bit C, W DPT 1.001 The group object is enabled if the Switching bit or scene parameter is set to Switching bit in the Time switch Astro – Settings parameter window.
  • Page 74 ® ABB i-bus Commissioning Sending Sends scene light 1-bit C, T above/below threshold 2 – DPT 17.001 Sending The group object is enabled if the Switching bit or scene parameter is set to Scene in the Light – Threshold 2 parameter window.
  • Page 75 ® ABB i-bus Commissioning Sending Sends Astro Plus – Sending 1-bit C, T DPT 1.001 The group object is enabled if the Switching bit or scene parameter is set to Switching bit in the Time switch Astro Plus – Settings parameter window.
  • Page 76 ® ABB i-bus Commissioning Reception Receives light value (lux) 1-byte C, W from bus – Reception DPT 9.004 The group object is enabled if the Light control depending on internal measurement or external bus value parameter is set to Bus (external) in the Light – Light control parameter window.
  • Page 77: Appendix

    ® ABB i-bus Appendix Appendix Scope of delivery The Time Receiver GPS is supplied together with the following components. Please check your delivery against the list below: • 1 pc. TR/A 1.1, Time Receiver GPS, SM • 1 pc. mounting bracket •...
  • Page 78: Code Table, 8 Bit Scene

    ® ABB i-bus Appendix Code table, 8 bit scene                               ...
  • Page 79: Ordering Details

    ® ABB i-bus Appendix Ordering details Short description Description Order No. bbn 40 16779 Weight 1 pcs. Packaging [kg] [pcs.] TR/A 1.1 Time Receiver GPS, SM 2CDG120060R0011 015721 0.09 TR/A 1.1 | 2CDC509082D0201 77...
  • Page 80 ® ABB i-bus Appendix Notes 78 2CDC509082D0201 | TR/A 1.1...
  • Page 81 ® ABB i-bus Appendix Notes TR/A 1.1 | 2CDC509082D0201 79...
  • Page 82 ® ABB i-bus Appendix 80 2CDC509082D0201 | TR/A 1.1...
  • Page 84 With regard to purchase or- ders, the agreed particulars shall prevail. ABB AG does not accept any responsibility whatsoever for potential errors or pos- sible lack of information in this document. We reserve all rights in this document and in the subject matter and illustrations con- tained therein.

Table of Contents