Stuart Turner Jet 55-45 B Installation, Operation & Maintenance Instructions Manual

Electric motor driven centrifugal pump
Installation, Operation & Maintenance
Instructions
Please leave this instruction booklet with the owner as it contains
important guarantee, maintenance and safety information
Read this manual carefully before commencing installation.
This manual covers the following products:
Jet 55-45 B
Pt. No. 46619
Jet 80-45 B
Pt. No. 46620
CE compliant product
Table of Contents
loading

Summary of Contents for Stuart Turner Jet 55-45 B

  • Page 1 Please leave this instruction booklet with the owner as it contains important guarantee, maintenance and safety information Read this manual carefully before commencing installation. This manual covers the following products: Jet 55-45 B Jet 80-45 B Pt. No. 46619 Pt. No. 46620...
  • Page 2 PRODUCT DESCRIPTION Electric motor driven centrifugal pump complete with an automatic control system, consisting of flow switch, pressure switch, pressure vessel and electronic control. APPLICATION The Stuart Jet Boostamatic range is designed for pressure boosting applications in vented stored, cold, clean water systems, where under gravity, no flow is available and can be used in systems where either a positive or negative head exists.
  • Page 3 CONTENTS Page Checklist ............4 Pre-Installation .
  • Page 4: Checklist

    CHECKLIST IMPORTANT: With the pump removed from its packaging check for any damage prior to installation. If any damage is found contact Stuart Turner Ltd within 24 hours of receipt. Fig. 1 Item Description Qty Item Description Pump Pressure vessel Your product may vary slightly from the picture above.
  • Page 5: Pre-Installation

    PRE-INSTALLATION ASSEMBLY Re-positioning of Pressure Vessel The pressure vessel can be rotated to alternative positions (Fig. 3) in the event of the factory fitted position being unsuitable for a specific installation. 1 Remove pressure vessel by unscrewing anti-clockwise. 2 Using a 2 mm allen key, carefully loosen all three retaining grub screws by two turns (Fig.
  • Page 6 1 READ BEFORE COMMENCING PUMP INSTALLATION A. Water storage capacity. 1.11 The cold water storage capacity must be sufficient to meet the flow rates required by the pumped equipment and any other water using fittings and appliances, which may be operated simultaneously. 1.12 Ensure the pump is primed as described in the priming section before starting, damage to the shaft seal will result otherwise.
  • Page 7: Location

    2 LOCATION - GENERAL 2.11 Access: For emergencies and maintenance the pump must be easily accessible. 2.12 Protection: The pump must be located in a dry position, frost free and protected from freezing, particularly when installed in a loft (not recommended).
  • Page 8 2 LOCATION - PUMP MOUNTED BELOW WATER SOURCE Cold water pump Fig. 4 2.25 Water supply: Must be made via a tank connector offering a dedicated supply direct to the pump. Cont ... - 8 -...
  • Page 9 Fig. 5 2.26 Self Priming: Jet 55-45 B and 80-45 B pumps are capable of self priming the suction hose assembly, providing a footvalve and strainer (not supplied) is always used for this type of installation. The Jet pump can be used in a suction lift installation providing the height of lift is no greater than maximum permitted (Fig.
  • Page 10: Electrical Installation

    3 ELECTRICAL INSTALLATION / EARTHING 3.11 Regulations: The electrical installation must be carried out in accordance with the current national electrical regulations and installed by a qualified person. 3.12 Safety: In the interests of electrical safety a 30 mA residual current device (R.C.D.
  • Page 11 The wire which is coloured green and yellow must be connected to the terminal in the connection unit which is marked with the letter E or by the earth symbol: or coloured green or green and yellow. The wire which is coloured blue must be connected to the terminal which is marked with the letter N or coloured black.
  • Page 12: Commissioning

    4 COMMISSIONING 4.11 System Flushing: The pipework system should be flushed out prior to the pump being connected to ensure any contaminants/ chemical residues and foreign bodies are removed from elsewhere in the system. 4.12 Water Supply: Always ensure that water storage capacity is adequate to meet the demand.
  • Page 13 The pump chamber must be full of water at all times. Seal  damage will result if the pump runs dry. 4.17 For Further Technical Support: Phone the Stuart Turner PumpAssist team on +44 (0) 844 98 000 97. Our staff are trained to help and advise you over the phone.
  • Page 14: Maintenance

    5 MAINTENANCE 5.11 Pressure vessel: The pressure vessel should be checked once every 6 months to have its air charge checked or replenished, this should be carried out as follows:- a) Isolate pump electrically. b) Isolate the water supply by closing the appropriate isolating valves. c) Release system water pressure by opening a system outlet on the system.
  • Page 15: Technical Specification

    6.11 Noise: The equivalent continuous A-weighted sound pressure level at a distance of 1 metre from the pump does not exceed 73 dB(A) for Jet 55-45 B or 76 dB(A) for Jet 80-45 B.
  • Page 16: Trouble Shooting

    7 TROUBLE SHOOTING GUIDE Symptoms Probable Cause Recommended Action Pump will not start. Electrical supply. Check wiring connections. Check all switches are ‘on’. Check fuse (see fuse section). Check circuit breaker is set. Faulty reed switch/PCB, Contact PumpAssist. pressure switch Recommended static inlet/ Re-position pump (see Section 2 - Location).
  • Page 17 10 seconds before switching on again. If the pump fails to operate normally after three attempts to re-start, then please consult Stuart Turner PumpAssist +44 (0) 844 9800097. 7.13 Fault Finding: The PCB is also fitted with a “power on” indicator light. This will remain illuminated when mains power is supplied to the board.
  • Page 18 Briefly reconnect the mains power supply to the pump – the ‘power on’ light  should illuminate if the pump has been correctly wired. Isolate the mains electrical power supply from the pump.  Re fit the terminal box lid ensuring no cables are trapped. ...
  • Page 19: Guarantee

    Installers – Register with Stuart Turner and move up to Approved Installer status We receive thousands of enquiries every month from people seeking a Stuart Turner installer and by registering your details with us, we can offer consumers the opportunity to quickly locate an installer in their area.
  • Page 20 Signed ......... Stuart Turner are an approved company to BS EN ISO 9001:2008...

This manual is also suitable for:

Jet 80-45 bStuart jet 55-45 bStuart jet 80-45 bStuart 46620Stuart 46619

Table of Contents