Vaillant auroSTOR VIH S GB 300/3 BES Installation And Maintenance Instructions Manual

Vaillant auroSTOR VIH S GB 300/3 BES Installation And Maintenance Instructions Manual

Aurostor vih s gb .../3 bes
Table of Contents
For the competent person
Installation and maintenance instructions
Publisher/manufacturer
Vaillant GmbH
Berghauser Str. 40
D-42859 Remscheid
Tel. +49 21 91 18‑0
Fax +49 21 91 18‑2810
www.vaillant.de
Installation and maintenance instructions
auroSTOR
VIH S GB .../3 BES
GB, IE
Table of Contents
loading

Summary of Contents for Vaillant auroSTOR VIH S GB 300/3 BES

  • Page 1 Installation and maintenance instructions For the competent person Installation and maintenance instructions auroSTOR VIH S GB .../3 BES GB, IE Publisher/manufacturer Vaillant GmbH Berghauser Str. 40 D-42859 Remscheid Tel. +49 21 91 18‑0 Fax +49 21 91 18‑2810 [email protected] www.vaillant.de...
  • Page 2: Table Of Contents

    Contents Contents Inspection and maintenance work – Overview............. 17 Technical data............ 17 Safety ..............3 Commissioning Checklist......... 20 Action-related warnings ......... 3 Index ................... 23 Risk caused by inadequate qualifications....3 Intended use ............3 General safety information ........3 Regulations (directives, laws, standards) ....
  • Page 3: Safety 1

    Safety 1 Safety Intended use There is a risk of injury or death to the user or Action-related warnings others, or of damage to the product and other Classification of action-related warnings property in the event of improper use or use The action-related warnings are classified in for which it is not intended.
  • Page 4: Regulations (Directives, Laws, Standards)

    1 Safety tact opening of at least 3 mm, e.g. fuse or line protection switch). ▶ Secure against being switched back on again. ▶ Check that there is no voltage. 1.4.3 Risk of being burned or scalded by hot components ▶...
  • Page 5: Notes On The Documentation

    VIH S GB 300/3 BES 0010019223 Benchmark Vaillant is a licensed member of the Benchmark Scheme. Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturer’s instructions by a competent person approved...
  • Page 6: Installation

    4 Installation Installation Transport Caution. Observing the requirements for the Risk of material damage caused by incor- product's installation site rect transport. Caution. The components must not be used to trans- Material damage due to frost port the cylinder. Otherwise there is a risk If the water in the system freezes, there is that the cylinder could malfunction.
  • Page 7: Checking The Scope Of Delivery

    Installation 5 Checking the scope of delivery Product dimensions Dimensions (mm) VIH S GB VIH S GB VIH S GB 200/3 BES 250/3 BES 300/3 BES 1,265 1,535 1,745 ▶ Check that the scope of delivery is complete. 1,210 1,421 Refer- Quant- Description...
  • Page 8 5 Installation 5.2.2 Connecting the product to the heating Caution. circuit Risk of material damage by drilling through the product. Connect the heating circuit to the inlet (5) and the outlet (3). The product may be damaged by drilling – Minimum diameter of the copper pipe: ≥...
  • Page 9 Installation 5 5.2.5 Installing an expansion vessel Install the expansion vessel close to the product. Install a pipe at the expansion vessel and connect the terminal to the safety group (1). 5.2.6 Installing a discharge pipe ≥ 300 mm Connection for the Outlet for the expansion expansion vessel (22 relief valve (15 mm)
  • Page 10 5 Installation Sample calculation Conditions: With multi-functional module or controller The following example corresponds to a temperature and pressure reducing valve G1/2 with a discharge pipe (D2) with four 22 mm elbows and a length of 7 m from the tundish to the drain point.
  • Page 11: Electrical Installation

    Installation 5 Conditions: Installation with secondary return 230~ 60 50 60 50 60 50 Cylinder Contact thermostat Non-return valve Non-return valve Thermostat mixing Circulation pump valve Secondary circuit hose Controller Solar circuit thermostat Immersion heater ther- Expansion relief valve Hot water hose mostat Primary circuit thermo- Cold water inlet...
  • Page 12 5 Installation 5.3.2.2 Immersion heater 5.3.4 Connecting the immersion heater to the power supply 60 50 60 50 Thermal cut-out and Immersion heater tem- fault clearance but- perature control ton for the immersion heater 5.3.3 Cable route Remove the cover for the electrics on the cylinder. Install a separate power supply for the immersion heater in accordance with the applicable standards.
  • Page 13 Installation 5 – 5.3.5 Connecting the solar circuit to the power Diameter of the cable: 2.5 mm² supply Conditions: S plan 60 50 60 50 60 50 60 50 ▶ Establish the connection to the electronics box. ▶ Conditions: Y plan Connect the thermal cut-out.
  • Page 14: Start-Up

    6 Start-up 5.3.9 Connecting the 2-way motorised valve to Total Water hardness at specific system volume the power supply heating > 20 l/kW output ≤ 20 l/kW > 50 l/kW ▶ ≤ 50 l/kW Connect the 2-way motorised valve; to do this, see the instructions for the controller or multi-functional module.
  • Page 15: Setting The Immersion Heater Thermostat

    Handing the product over to the operator 7 Setting the immersion heater thermostat Filling and purging the heating circuit Note The heating circuit can be filled using a filling device or a separate filling cock, which is installed at a location that is easily accessible. The separate filling cock must be removed after filling.
  • Page 16: Troubleshooting

    The inspection may require maintenance to be carried that arrangements are made for a Maintenance Agreement. out earlier, depending on the results. Please contact Vaillant Service Solutions for further details: Inspection and maintenance work – Overview (→ Page 17) Telephone: 0330 100 3461 The immersion heater can be removed in order to inspect the inside of the cylinder.
  • Page 17: B Inspection And Maintenance Work - Overview

    Appendix Appendix Detecting and rectifying faults Fault Possible cause Remedy No throughput at the Water supply valve closed Check and open the valve. valve Main filter blocked Close the water supply valve, clean the filter and the water pressure reducer. Pressure reducer not installed correctly Check whether the pressure reducer has been installed correctly.
  • Page 18 Appendix VIH S GB 200/3 VIH S GB 250/3 VIH S GB 300/3 Pressure of the pressure reducer 0.35 MPa 0.35 MPa 0.35 MPa (3.50 bar) (3.50 bar) (3.50 bar) Opening pressure in the expansion relief valve 0.6 MPa 0.6 MPa 0.6 MPa (6.0 bar) (6.0 bar)
  • Page 19 Appendix VIH S GB 200/3 VIH S GB 250/3 VIH S GB 300/3 3-way motorised valve 230/240 V, 50Hz 230/240 V, 50Hz 230/240 V, 50Hz Thermostat 230/240 V, 50Hz 230/240 V, 50Hz 230/240 V, 50Hz Level of protection Technical data – Material VIH S GB 200/3 VIH S GB 250/3 VIH S GB 300/3...
  • Page 20: D Commissioning Checklist

    Appendix Commissioning Checklist Benchmark Commissioning and Servicing Section It is a requirement that the boiler is installed and commissioned to the completed in full. www.centralheating.co.uk © Heating and Hotwater Industry Council (HHIC) Installation and maintenance instructions auroSTOR 0020221298_02...
  • Page 21 Appendix MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.
  • Page 22 Appendix SERVICE RECORD It is recommended that your hot water system is serviced regularly and that the appropriate Service Record is completed. Service Provider Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions. SERVICE 01 SERVICE 02 Date:...
  • Page 23: Index

    Index Index Article number ............... 5 CE label ................. 5 Checking the pre-charge pressure of the expansion vessel .................. 16 Competent person..............3 Decommissioning ..............16 Decommissioning the product ..........16 Discharge pipe ..............9 Documents ................5 Drain valve ................8 Draining the product ............
  • Page 24 0020221298_02 09.08.2016 supplier Vaillant Ltd. Nottingham Road Belper Derbyshire DE56 1JT Telephone 0330 100 3461 [email protected] www.vaillant.co.uk © These instructions, or parts thereof, are protected by copyright and may be reproduced or distributed only with the manufacturer's written consent. We reserve the right to make technical changes.

This manual is also suitable for:

Aurostor vih s gb 250/3 besAurostor vih s gb 200/3 bes

Table of Contents