Honeywell acuix es Quick Installation Manual
Honeywell acuix es Quick Installation Manual

Honeywell acuix es Quick Installation Manual

Ptz
Hide thumbs Also See for acuix es:

Quick Links

ACUIX™ ES PTZ Dome Quick Installation Guide
Pre-installation Cautions
All types of installations must be performed by qualified technical personnel and must be in accordance with all national and local mechanical and electrical codes.
Ensure the mounting surface and installation hardware can hold the combined weight of the scan assembly, housing, lower dome and mount. Any wall or ceiling
mounting of the product should follow the manufacturer's instructions for the mount used and use best installation practice appropriate for the structure and
material the mount is being attached to.
To prevent damage to the mainboard, follow standard industry precautions for electrostatic discharge sensitive devices.
Cable preparation should be completed prior to the installation. Each dome requires 24V AC at 1 A or 12V DC at 1.5 A. The power supply should be located as
close to the dome as possible for service and electrical isolation purposes.

How to Use this Guide

1. Follow the instructions on pages 2 or 3 for your specific installation type (indoor pendant, surface mount or in-ceiling).
2. Refer to pages 1 and 4 for switch, power and wiring information, which is the same for all installations.
3. Numbered steps have cross references to the insets labeled A through F.
These instructions are only a basic guide. Refer to the ACUIX ES Installation and Configuration Guide for detailed safety and installa-
tion information not included here and to configure the domes. Not all models or options are shown and the step order may vary.
Scan Assembly Mainboard Switches SW2 to SW5
A
Typical SW2 and SW3 Switch Settings (Protocol, Baud and Parity)
Baud and Parity
Protocol
IntelliBus™
38400 baud, no parity
MAXPRO*
9600 baud, even parity*
VCL - RS485** 9600 baud, no parity**
VCL UTC
9600 baud, no parity
Diamond
9600 baud, even parity
Pelco P
4800 baud, no parity
(default for P-type control)
Pelco D
2400 baud, no parity
(default for D-type control)
* NTSC default settings: MAXPRO-mode protocol, 9600 baud, even parity.
** PAL default settings: VCL 485 protocol, 9600 baud, no parity.
SW5 on
other side
SW4 - Address
SW2 - Baud/Parity
SW4: Dome Address
Binary Value/Dome
Address
SW4/1
SW4/2
ON
1 (default)
OFF
2
ON
3
OFF
4
ON
5
See the ACUIX ES Installation and Configuration Guide for a more extensive table.
SW2 - Baud and Parity Settings
Description
1
2
3
OFF ON
ON
OFF OFF ON
OFF OFF ON
OFF OFF ON
OFF OFF ON
ON
ON
OFF OFF OFF OFF OFF OFF ON
OFF ON
OFF OFF OFF OFF OFF OFF OFF ON
SW5 RS485 Termination
ON
SW3 - Protocol
SW4/3
SW4/4
SW4/5
SW4/6
SW4/7
OFF
OFF
OFF
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
OFF
4
5
6
7
8
1
OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF ON
OFF ON
OFF OFF OFF OFF ON
OFF OFF OFF OFF OFF ON
OFF OFF OFF OFF OFF OFF OFF ON
OFF ON
OFF OFF OFF ON
NTSC or PAL settings are
based on camera model.
SW5: RS485 Termination
SW5 is located on the
opposite side from the
DIP switches.
SW2: Baud Rate and Parity
Baud Rate
SW2/1
SW2/2
600
OFF
OFF
1200
ON
OFF
SW4/8
2400
OFF
ON
OFF
4800
ON
ON
OFF
9600
OFF
OFF
(default)
OFF
19200
ON
OFF
OFF
38400
OFF
ON
OFF
57600
ON
ON
115200
OFF
OFF
SW3 – Protocol Setting
2
3
4
5
6
7
OFF OFF OFF OFF OFF ON
ON
OFF OFF OFF OFF OFF ON
OFF OFF OFF OFF ON
OFF OFF OFF OFF OFF OFF ON
OFF ON
OFF OFF OFF OFF ON
ON
OFF OFF OFF OFF ON
For most installations,
leave SW3-8 ON,
otherwise users can
make changes from
the OSD menu.
Switch SW5 RS485 Termination
OFF (default)
Not terminated
ON
Terminated in 120 Ohms
SW2/3
SW2/4
Parity
OFF
OFF
None (PAL default)
OFF
OFF
Even (NTSC default)
OFF
OFF
Odd
OFF
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
DIP Switch Close Up
OFF
ON
8
SW2/5
SW2/6
OFF
OFF
ON
OFF
OFF
ON
1
loading

Summary of Contents for Honeywell acuix es

  • Page 1: How To Use This Guide

    3. Numbered steps have cross references to the insets labeled A through F. These instructions are only a basic guide. Refer to the ACUIX ES Installation and Configuration Guide for detailed safety and installa- tion information not included here and to configure the domes. Not all models or options are shown and the step order may vary.
  • Page 2 Installing the Indoor Pendant or Surface Mount Dome All ACUIX ES pendant/surface mount shipments include both the skirt and top cap. Pendant Use the part appropriate to the type of installation. and Surface Refer to inset Components Indoor Pendant (Using the Top Cap) Drill the mount holes into the ceiling or wall.
  • Page 3 Installing the In-Ceiling Dome into a Dropped or Hard Ceiling In-ceiling Refer to inset Wiring access Hard Ceiling hole and clamp Using the mounting template, cut a 7 5/8” (194 mm) diameter ceiling hole. Cable can If the ceiling is drywall or plaster, seal the perimeter of the hole with tape or Turning screws and wing tabs plastic channel to prevent debris from contaminating the scan assembly.
  • Page 4: Power Supplies

    Power Supplies determined. 9 Contact input common Application Specification 24V AC 1 amp x 1, or Internal - 1 per ACUIX ES 12V DC 1.5 amp x 1 Video Switch SW1, Plugs and BNC Connector BNC Connector SW1 Video SW1 Video...