Identifying The Contents Of The Server Shipping Carton; Installing Hardware Options; Installing The Server Into The Rack - HP ProLiant DL180 Gen9 User Manual

Hide thumbs Also See for ProLiant DL180 Gen9:
Table of Contents
WARNING:
secured at the top and bottom to the building structure.

Identifying the contents of the server shipping carton

Unpack the server shipping carton and locate the materials and documentation necessary for installing the
server. All the rack mounting hardware necessary for installing the server into the rack is included with the
rack or the server.
The contents of the server shipping carton include:
Server
Power cord
Rack rail hook-and-loop strap
Rack mounting hardware kit
Printed setup documentation
In addition to the supplied items, you might need:
T-25 Torx screwdriver (to loosen the shipping screws located inside the server quick-release latch rack
ears)
T-10/T-15 Torx screwdriver
Flathead screwdriver (to remove the knockout on the dedicated iLO connector opening)
Hardware options

Installing hardware options

Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page 42)."

Installing the server into the rack

To install the server into a rack with square, round, or threaded holes, refer to the instructions that ship with
the rack hardware kit.
If you are installing the server into a telco rack, order the appropriate option kit at the RackSolutions.com
website (http://www.racksolutions.com/hp-dl180-g9-rails.html). Follow the server-specific instructions on
the website to install the rack brackets.
When installing a server in a telco rack, be sure that the rack frame is adequately
Setup 36
Table of Contents
loading

Table of Contents