Piping Connection; Vacuum Drying; Flare Nut Fastening Torque - LG A2UN186FA0 Service Manual

Inverter multi type room air conditioner
Table of Contents

Piping Connection

1. Form the piping according to its routing. Avoid
bending and bending back the same piping point
more than three times. (This will result in hard-
ening the pipe.)
2. After deforming the piping, align centers of the
union fitting of the indoor unit and the piping, and
tighten them firmly with wrenches.
3. Connect pipe to the service valve or ball valve
which is located below the outdoor unit.
4. After completing the piping connection, be sure
to check if there is gas leakage in indoor and
outdoor connection.

Vacuum drying

After completing the piping connection, execute
vacuum drying for the connecting piping and the
indoor unit.
The vacuum drying must be carried out using the
service ports of both the liquid and gas side valves.
CAUTION
Use two wrenches and tighten with regular torque.

Flare nut fastening torque

Ø6.35mm(1/4")
Ø9.52mm(3/8")
Ø12.7mm(1/2")
Ø15.88mm(5/8")
1.8kg . mm
4.0kg . mm
5.5kg . mm
6.6kg . mm
Outdoor
unit
- 38 -
Liquid side
Indoor
unit
Flare connection
Gas side
Flare connection
Union
Table of Contents
loading

Table of Contents