Vaillant Flue pipe Installation Manual
Vaillant Flue pipe Installation Manual

Vaillant Flue pipe Installation Manual

Modular gas condensing boiler flue pipe

Quick Links

For the heating engineer
Installation Manual
Flue pipe for ecoCRAFT
Modular gas condensing boiler
GB
VKK GB 806/3-E-H
VKK GB 1206/3-E-H
VKK GB 1606/3-E-H
VKK GB 2006/3-E-H
VKK GB 2406/3-E-H
VKK GB 2806/3-E-H
Table of Contents
loading

Summary of Contents for Vaillant Flue pipe

  • Page 1 For the heating engineer Installation Manual Flue pipe for ecoCRAFT Modular gas condensing boiler VKK GB 806/3-E-H VKK GB 1206/3-E-H VKK GB 1606/3-E-H VKK GB 2006/3-E-H VKK GB 2406/3-E-H VKK GB 2806/3-E-H...
  • Page 2: Table Of Contents

    Tested and approved air/ flue pipes - room-sealed ........5 Description ..............5 Tested and approved air/flue pipes ......5 Air/flue pipe – room sealed, combustion air from the shaft ..............6 Air/flue pipe – room sealed, combustion air through the external wall .......... 8 Air/flue pipe –...
  • Page 3: Notes On The Documentation 1

    Risk to life from poisoning as a result of escap- ing flue gases! CE label All openings in the flue pipe that can be opened The ecoCRAFT VKK GB 806/3-E-H, VKK GB 1206/3-E-H, for inspection purposes must be closed before VKK GB 1606/3-E-H, VKK GB 2006/3-E-H, start-up and during operation.
  • Page 4: Regulations

    IGE/UP/1A Soundness testing and purging of small low pressure industrial and commercial natural gas installa- tions. IGE/UP/10 Installation of gas appliances in industrial and commercial premises. Part 1 Flued appliances Installation manual flue pipe for ecoCRAFT 0020058722_03...
  • Page 5: Tested And Approved Air/Flue Pipes - Room-Sealed

    Crowther Estate, Washington, Tyne & Wear NE 38 0AQ Prima Plus L50060 O200 Vent Ltd steel Tel.: 0044 191 416 11 50 - TUV 0036 CPD 9195 018 www.schiedel.co.uk Table 4.1 Manufacturers of air/flue pipes (GB) Installation manual flue pipe for ecoCRAFT 0020058722_03...
  • Page 6: Air/Flue Pipe - Room Sealed, Combustion Air From The Shaft

    The air supply must be installed in such a way that no rainwater can enter the boiler. Rainwa- Fig. 4.1 Air / flue pipe – room sealed, combustion air from the ter ingress can cause a short-circuit of electri- shaft cal components and can cause corrosion in the unit.
  • Page 7 Maximum length of horizontal pipes: each 4 m air pipe plus 2 x 87° elbows and 4 m flue gas pipe plus 2 x 87° elbows Minimum diameter of the air supply pipe 150 mm Table 4.2 Maximum total pipe length (combustion air from the shaft) Installation manual flue pipe for ecoCRAFT 0020058722_03...
  • Page 8: Air/Flue Pipe - Room Sealed, Combustion Air Through The External Wall

    4 System - certifi ed fl ue pipe - open fl ued Air/flue pipe – room sealed, combustion air through the external wall Fig. 4.2 Air / flue pipe – room sealed, combustion air through the external wall Maximum total pipe length (L...
  • Page 9: Air/Flue Pipe - Room Sealed, Combustion Air And Flue Gas Evacuation Via The Roof

    The opening of the exhaust gas pipe must be at least 0.5 m above the air pipe to avoid functional problems caused by exhaust gas re-circulation. Fig. 6.3 Air / flue pipe – room sealed, combustion air and flue gas evacuation via the roof Maximum total pipe length (L...
  • Page 10: Air/Flue Pipe - Room Sealed, Combustion Air Through The External Wall, Flue Pipe On The Facade

    Air/flue pipe – room sealed, combustion air through the external wall, flue pipe on the facade Fig. 6.47 Air/flue pipe – room sealed, combustion air through the external wall, flue pipe on the facade Appliance type Maximum total pipe length (L...
  • Page 11: Guarantee 5

    (this does not affect the customer's statutory rights). Disposal Make sure that the flue pipe is handed over to a proper disposal organisation. Note Please observe the applicable national statuto- ry regulations.

Table of Contents