Fujitsu SPARC ENTERPRISE T1000 Site Planning Manual

Hide thumbs Also See for SPARC ENTERPRISE T1000:

Quick Links

Table of Contents
loading

Summary of Contents for Fujitsu SPARC ENTERPRISE T1000

  • Page 3 ® SPARC Enterprise T1000 Server Site Planning Guide Manual Code : C120-H018-01EN Part No. 875-4020-10 April 2007...
  • Page 4 Fujitsu Limited or Sun Microsystems, Inc., or any affiliate of either of them.
  • Page 5 Aucune partie de ce produit, de ces technologies ou de ce document ne peut être reproduite sous quelque forme que ce soit, par quelque moyen que ce soit, sans l’autorisation écrite préalable de Fujitsu Limited et de Sun Microsystems, Inc., et de leurs éventuels bailleurs de licence.
  • Page 7: Table Of Contents

    Contents Preface vii SPARC Enterprise T1000 Server Site Planning Guide 1 Physical Specifications Minimum Clearance for Service Access 2 Environmental Specifications Power Source Requirements 4 Acoustic Noise Emissions 4 Agency Compliance Specifications 4 General Site Preparation Notes 5 Ambient Temperature 5 Ambient Relative Humidity 5 Airflow Considerations 6...
  • Page 8 SPARC Enterprise T1000 Server Site Planning Guide • April 2007...
  • Page 9: Preface

    Keep this manual handy for further reference. Fujitsu makes every effort to prevent users and bystanders from being injured or from suffering damage to their property. Use the product according to this manual. Related Documentation...
  • Page 10 Japanese Site http://primeserver.fujitsu.com/sparcenterprise/manual/ Title Description Manual Code SPARC Enterprise T1000 Server Information about the latest C120-E381 Product Notes product updates and issues SPARC Enterprise T1000 Server Information about where to find C120-E379 Getting Started Guide documentation to get your system installed and running...
  • Page 11 Fujitsu Welcomes Your Comments We would appreciate your comments and suggestions to improve this document. You can submit your comments by using "Reader's Comment Form" Preface...
  • Page 12 Reader's Comment Form x SPARC Enterprise T1000 Server Site Planning Guide • April 2007...
  • Page 13 IN THE UNITED STATES BUSINESS REPLY MAIL FIRST-CLASS MAIL PERMIT NO 741 SUNNYVALE CA POSTAGE WILL BE PAID BY ADDRESSEE FUJITSU COMPUTER SYSTEMS AT TENTION ENGINEERING OPS M/S 249 1250 EAST ARQUES AVENUE P O BOX 3470 SUNNYVALE CA 94088-3470...
  • Page 14 xii SPARC Enterprise T1000 Server Site Planning Guide • April 2007...
  • Page 15: Sparc Enterprise T1000 Server Site Planning Guide

    SPARC Enterprise T1000 Server Site Planning Guide This guide provides the specifications and site requirements you need when planning the installation of the SPARC Enterprise T1000 server. For safety and compliance information, refer to the SPARC Enterprise T1000 Server Safety and Compliance Guide and the Important Safety Information for Hardware Systems document that came with your server.
  • Page 16: Physical Specifications

    Physical Specifications Description U.S. Metric Width 16.8 in. 425 mm Depth 18.4 in. 467 mm Height 1.75 in., 1 rack unit 43 mm Weight (without PCI card and rackmounts) 20.5 lb 9.3 kg Weight (with slide rails) 24 lb 10.9 kg Minimum Clearance for Service Access These are the minimum clearances needed for service.
  • Page 17: Environmental Specifications

    Environmental Specifications Specification Operating Non-operating Operating temperature: • Sea level to 3000 ft • 41°F to 95°F (5°C to 35°C) -40 to 60°C (900m) • Above 3000 ft (900m) • Decrease maximum -40 to 60°C temperature as altitude increases, 1.6°F/1000 ft (1°C/300m) Humidity 20 to 80% RH,...
  • Page 18: Power Source Requirements

    Power Source Requirements The SPARC Enterprise T1000 server has an autoranging power supply. Description Specification Operating input voltage range 100 to 240 VAC, 50-60 Hz (Input voltage tolerance ± 10%) Maximum operating input current 2.2 A at 100 to 120 VAC 1.1 A at 200 to 240 VAC Typical operating input power 180 W...
  • Page 19: General Site Preparation Notes

    General Site Preparation Notes Your environmental control system must provide intake air for the server that complies with the limits specified in “Environmental Specifications” on page To avoid overheating, do not direct warmed air: Toward the front air intake of the server ■...
  • Page 20: Airflow Considerations

    Electrostatic discharge (ESD) is easily generated and less easily dissipated in areas where the relative humidity is below 35%, and becomes critical when levels drop below 30%. Airflow Considerations Ensure unobstructed airflow through the chassis. ■ Ensure that inlet air enters at the front of the server and exits from the back. ■...