Inspecting The System - Cisco 2524 - Router - EN Preparing To Install

Installation guide
Hide thumbs Also See for 2524 - Router - EN:
Table of Contents

Inspecting the System

Do not unpack the router until you are ready to install it. If the final installation site will not
be ready for some time, keep the chassis in its shipping container to prevent accidental
damage. When you have determined where you want the router installed, proceed with
unpacking it.
The router, cables, UniverCD or printed publications, and any optional equipment you
ordered might be shipped in more than one container. When you unpack each shipping
container, check the packing list to ensure that you received all of the following items:
Cisco 2524 or Cisco 2525 router
6-foot (1.8-meter) power cord
Jackscrews for the AUI connector (Cisco 2524 router only)
Console and auxiliary cable kit, which includes the following items:
— RJ-45-to-RJ-45 roll-over cable
— RJ-45-to-DB-9 female DTE adapter (labeled Terminal)
— RJ-45-to-DB-25 female DTE adapter (labeled Terminal)
— RJ-45-to-DB-25 male DCE adapter (labeled Modem)
Optional equipment (such as network interface cables and WAN modules)
Cisco Information Packet publication, UniverCD, and optional printed publications
specified on your order
Inspect all items for shipping damage. If anything appears to be damaged, or if you
encounter problems when installing or configuring your system, contact a customer service
representative.
Preparing to Install the Cisco 2524 and Cisco 2525 Routers 2-17
Inspecting the System
Table of Contents
loading

This manual is also suitable for:

2525

Table of Contents