7.8.1 Switching on the boiler at the control unit ..29 2.9.1 Dimensions and connections Condens 7000 FP..8 7.8.2 Carrying out a flue gas test ..... . 29 Regulations .
Page 3
17.4.2 Burner control unit ......70 17.4.3 Diagrammatic representation of supply air/flue gas monitor and gas tightness ....71 Condens 7000 FP – 6721846699 (2022/12)
In doing so, observe the regulations ( chapter 3). ▶ Do not repair, manipulate or bypass safety equipment. ▶ Observe all relevant instructions for system components, accessories and spare parts. Condens 7000 FP – 6721846699 (2022/12)
Scope of delivery there is a risk of explosion from gas escaping. The Condens 7000 FP is delivered with a control unit, which is assigned ▶ Do not use wall mounted gas boilers in rooms where there is an when ordering, in 2 packaging units.
Refer to the Technical product brochure for a complete overview of all 2.8.1 Product description available accessories. The main components of the Condens 7000 FP are: • Control unit The following accessories are available from your local sales office: • Boiler block •...
Page 7
Product Information 0010042180-001 Fig. 1 Condens 7000 FP, 350...500 kW main components (shown: right-hand version; cleaning cover and flow and return are located on the right) Boiler front panel (2-part) Air/gas ratio control valve Control unit CC83xx (optional) Regelgerät MX25 (optional)
For guidance see the ICOM water treatment guide for commercial heating systems. • Make sure that the regional approvals required for the flue system and condensate connection to the public sewage system have been obtained. Condens 7000 FP – 6721846699 (2022/12)
The following applies for open-flue mode: ▶ Provide a combustion air opening that complies with the minimum size specified in table 4 1) In addition to this, country-specific and local regulations must be observed. Condens 7000 FP – 6721846699 (2022/12)
Remove the air hose to the top 0010036119-001 Fig. 3 Transport the floor standing boiler with pallet truck (example for illustration purposes) 0010041667-001 Pallet truck Fig. 5 Turn the inlet duct of the fan downwards Condens 7000 FP – 6721846699 (2022/12)
Page 13
11.7 for the Figs. 50 and 51. 6x screws ▶ Remove the 4 screws on the holding plate of the burner base Supporting plate for air hose (Fig. 10, [2]). Plug on differential pressure sensor Plug for solenoid valve Condens 7000 FP – 6721846699 (2022/12)
▶ Remove the front and rear wooden crate (do not remove the upper wooden frame) ▶ Check the screws of the transport timber for a secure seat. 0010041669-001 Fig. 11 Remove the burner base Condens 7000 FP – 6721846699 (2022/12)
4 – 6) and lift the boiler far enough so that the second partial pallet purposes) can be removed. ▶ Once the boiler is located at the final installation location, screw in the 4 boiler feet to the traverses on the side (Fig. 16). Condens 7000 FP – 6721846699 (2022/12)
▶ Position the pipes approx. 400 mm apart on the floor. purposes) ▶ Lift the floor standing boiler onto the lengths of pipe and carefully roll Transport rollers it to the boiler room. Transport timber Commercially-available transport rollers can be used. Condens 7000 FP – 6721846699 (2022/12)
0010012544-001 Fig. 19 Wall clearances at the installation location (right-hand version) DANGER Risk of fire through flammable materials or liquids. ▶ Never store flammable materials or liquids in the immediate vicinity of the boiler. Condens 7000 FP – 6721846699 (2022/12)
▶ Attach the condensate hose to the condensate drain [5] and secure with hose clamps. ▶ Insert the condensate drain with condensate hose through the siphon bracket from behind and secure with the lock nut (not shown). Condens 7000 FP – 6721846699 (2022/12)
▶ Wear protective gloves. ▶ Fill the siphon below the flue outlet with roughly 3 litres of water. Centrocerin must be used as a lubricating paste when installing the flue system on the connector. Condens 7000 FP – 6721846699 (2022/12)
Page 20
The boiler must not be connected to any combined flue system with motorised motor systems (e.g. combined heat and power unit). 0010041192-001 Fig. 24 Mount the flue pipe vertically Flue gas routing upwards Flue pipe vertical (Fig. 24) 2x screws 2x nuts Condens 7000 FP – 6721846699 (2022/12)
To avoid condensate formation in the combustion air pipe (inside and Boiler size [kW] Connection outside), insulate the combustion air pipe. 350 – 500 DN100, PN6 standard flange EN1092 Table 8 Water connection sizes Condens 7000 FP – 6721846699 (2022/12)
▶ Observe the installation instructions for the accessories. ▶ Remove the drain valve mounted on the return (Fig. 27) ▶ Unscrew the 2” reduction. ▶ Mount accessory set with gasket (tightening torque: 35 Nm). Condens 7000 FP – 6721846699 (2022/12)
We recommend that the hood supply air cover [2] is installed before routing the electric cable. 6 720 615 876-59.2T Fig. 30 Pressure gauge for sealed systems Red needle Pressure gauge needle Green marking Condens 7000 FP – 6721846699 (2022/12)
▶ Document connection and services in the inspection and ▶ Route all cables through the cable conduits to the control unit and maintenance record. connect them as shown in the connection diagram. Condens 7000 FP – 6721846699 (2022/12)
▶ Burners contaminated during building work must be cleaned before commissioning. ▶ Inspect flue and combustion air pipe (with room sealed operation) and combustion air supply and ventilation openings ( Chapter 5.6, page 19). Condens 7000 FP – 6721846699 (2022/12)
Chapter 17.6, page 72). If the boiler is to be replaced in existing systems: ▶ Consult gas suppliers to ensure that the nominal gas pressure according to table 10, page 29 is adhered to. Condens 7000 FP – 6721846699 (2022/12)
▶ Check whether the flue gas connection complies with the applicable regulations ( Chapter 5.6, page 19). ▶ Have any faults rectified immediately. 0010042283-001 Fig. 34 Venting the gas line Test nipple for measuring the gas supply pressure and for venting Condens 7000 FP – 6721846699 (2022/12)
To check the gas pressure regulator or the gas static pressure in the gas necessary, supply each boiler or consumer via a separate pressure installation: regulator. ▶ Shut down the burner from full load. Condens 7000 FP – 6721846699 (2022/12)
Commissioning ▶ Identify and eliminate the fault. For higher supply pressures than shown in table 10, Bosch offers additional gas pressure regulators as accessories. 7.10 Check and adjust the gas/air ratio The deviation between the measures CO value in full load and partial load must not be greater than 0.5% CO...
7.14.1 Checking the ionisation current (flame current) ▶ To test the ionisation current, observe the corresponding technical documentation for the control unit. 1) (lf) = air-free Condens 7000 FP – 6721846699 (2022/12)
▶ If necessary, install the top flue gas cover [8]. ▶ First hook the side panels [6] at the rear into the bottom rail, lift slightly and hook in at the top. With the rear fold, place over the rear panel. Condens 7000 FP – 6721846699 (2022/12)
You can find more information here: www.weee.bosch-thermotechnology.com/ Batteries Batteries must not be disposed together with your household waste. Used batteries must be disposed of in local collection systems. Condens 7000 FP – 6721846699 (2022/12)
▶ Remove the fixing screws on the top of the floor standing boiler and remove the upper boiler front panel. ▶ To do this, slightly raise the lower boiler front panel and remove it towards the front. Condens 7000 FP – 6721846699 (2022/12)
-white gas line) [13] Valve check system [14] Air/gas ratio control valve [15] Relay box [16] Test cable for gas outlet pressure (transparent gas line) [17] Compensation line (blue) X View without gas pipe Condens 7000 FP – 6721846699 (2022/12)
Page 36
Fig. 42 Detail overview of the components, side view right side (shown: without combustion air inlet hose, gas pipe and thermal insulation 500 kW rating) Gas pressure test nipple with temperature switch Flow temperature sensor Flue gas pressure limiter Water pressure sensor Return temperature sensor Condens 7000 FP – 6721846699 (2022/12)
15 x 1 18 x 1 22 x 1 28 x 1.5 35 x 1.5 45 x 1.5 – – – Table 13 Pipework volume (V ) in litres, subject to pipe length and diameter pipe Condens 7000 FP – 6721846699 (2022/12)
(V test ▶ Remove the hose. ▶ After completing the measurements, retighten the locking screw of the test nipple. ▶ Check tightness of the test nipples. Condens 7000 FP – 6721846699 (2022/12)
▶ Observe all country-specific regulations and standards regarding the prevention of drinking water contamination. ▶ Water should be topped up via WRAS approved filling method. ▶ Vent the heating system via the radiator air vent valves. ▶ Check the operating pressure again. Condens 7000 FP – 6721846699 (2022/12)
Page 40
▶ Remove the hoses on the differential pressure sensor (Fig. 52). Fig. 50 Pull the burner back Mixture manifold ▶ Install the insertion aid. When delivered, the insertion aid is attached on the upper cover plate (Fig. 51). Condens 7000 FP – 6721846699 (2022/12)
Page 41
▶ Remove the 4 screws on the flange of the gas pipe (Fig. 52). ▶ Remove the O-ring on the guide pins of the burner sled (Fig. 52). ▶ Unplug the plug on the fan (Fig. 53). Condens 7000 FP – 6721846699 (2022/12)
Ventilation air collector Temperature switch / burner controller connecting cable Application of lubricating paste on the guide pins facilitates pulling the burner forwards. 0010046217-001 Fig. 55 Undo the plug, hoses and gas supply pipe Condens 7000 FP – 6721846699 (2022/12)
0010012553-001 Fig. 58 Removing the siphon Siphon Condensation catch pan outlet ▶ Remove the screws from the cover of the condensation catch pan. 0010036923-001 Fig. 57 Pull the burner back Mixture manifold Condens 7000 FP – 6721846699 (2022/12)
Page 44
(service side), which depends on whether the boiler is a right or left- hand version. ▶ Remove the clips [1] on the thermal insulation. ▶ Remove the thermal insulation [2] from the heat exchanger. 0010013911-001 Fig. 60 View of condensation catch pan without cover Dirt trap Condens 7000 FP – 6721846699 (2022/12)
Page 45
▶ To avoid injury, wear protective gloves when cleaning the boiler using on in pairs according to the tightening diagram. cleaning blades (accessories). ▶ Clean the heat exchanger hot gas flues horizontally and diagonally using the cleaning blade. Condens 7000 FP – 6721846699 (2022/12)
▶ Replace the electrode. ▶ Check the gaps between the electrodes and compare them with those shown in Fig. 68. 0010012529-001 Fig. 67 Wet cleaning the heat exchanger Condens 7000 FP – 6721846699 (2022/12)
▶ Connect the hose lines as shown in the connection diagram ratio control valve. (Chapterl 17.4.3, page 71). ▶ Remove filter cassette [1] and insert a new one. ▶ Make sure the hose lines are not buckled or trapped. Condens 7000 FP – 6721846699 (2022/12)
▶ Replace components relevant for safety in case of increased wear or when reaching the service life at the latest. ▶ For replacement, use only new and undamaged original spare parts. Condens 7000 FP – 6721846699 (2022/12)
▶ Use only lubricating paste which has been released by the manufacturer of the flue gas system. DANGER Danger to life through escaping gases! ▶ Always replace the electrode block gasket when replacing electrodes. ▶ Generally, replace damaged gaskets or ones that appear aged. Condens 7000 FP – 6721846699 (2022/12)
In doing so, take care that the gasket in the slide is not damaged and check the correct fit in the groove (if necessary, check the correct fit using a torch). ▶ Screw in the screws on the mixture manifold / slide (maximum tightening torque: 15,5±10%). Condens 7000 FP – 6721846699 (2022/12)
In emergency operation, faults can only be cleared via the reset button carrying components. on the burner control unit. Resetting is only possible if a locking fault is present. ▶ Press the reset button to clear the fault. Condens 7000 FP – 6721846699 (2022/12)
Observe corresponding technical documentation for the control unit and user interface. 0010041073-001 Fig. 80 Pressure monitor position; view from the right and left side Pressure switch Combustion chamber test cable (DN8: colour black) Connection line with plug Condens 7000 FP – 6721846699 (2022/12)
Calling up the fault history The fault history is called up in different ways, depending on the control unit used or the user interface installed. Observe corresponding technical documentation for the control unit and user interface. Condens 7000 FP – 6721846699 (2022/12)
The control unit sets the heat – If external blocking is not required, externally via the terminal requirement to the burner a jumper must be fitted to the EV control unit to 0. terminals. Table 16 Operating codes Condens 7000 FP – 6721846699 (2022/12)
(ISTB) for the flow the intelligent high-limit temperature sensor/high-limit safety temperature for safety cut-out. the flow of 140 °C and ▶ Replace ignition/monitoring an ionisation current is electrode. detected or the solenoid valves are open. Condens 7000 FP – 6721846699 (2022/12)
Page 57
▶ Reconnect any loose plugs. Check sensor readings against table. temperature sensor. ▶ Replace the temperature sensor, Check the voltage values at the if there are any deviations from sensor against the table. the table. Condens 7000 FP – 6721846699 (2022/12)
Page 58
Check whether the safety chain (terminal 17/18 control unit) has triggered. Condens 7000 FP – 6721846699 (2022/12)
Page 59
Check the 230 V power supply to the ▶ Reset the burner control unit at sequences (power was switched off 5 control unit. the reset button. supply times during the burner ▶ Rectify power supply problem. disconnection start. during burner start). Condens 7000 FP – 6721846699 (2022/12)
Page 60
If it is, replace the filter. ▶ Test the differential pressure switch (Chapter 16, page 65). ▶ Replace the gas filter if necessary. ▶ Replace the air/gas ratio control valve if necessary. Condens 7000 FP – 6721846699 (2022/12)
Page 61
▶ If the connecting lead, contacts circuit in the sensor Check resistance values of and resistance values are all OK, lead. temperature sensor against table. replace the control unit. Temperature sensor is defective Condens 7000 FP – 6721846699 (2022/12)
Page 62
▶ If the connecting lead, contacts and resistance values are all OK, Check resistance values of replace the burner control unit. temperature sensor against table. Burner control unit defective. Condens 7000 FP – 6721846699 (2022/12)
Page 63
Check sensor readings against table. ▶ Replace temperature sensor if there are discrepancies. Burner control unit defective. ▶ If the connecting lead, contacts and resistance values are all OK, replace the burner control unit. Condens 7000 FP – 6721846699 (2022/12)
........................Off The burner control unit is not in operation Table 19 Display of the operating condition of the burner via the lighting of the reset button. Permanently GREEN Condens 7000 FP – 6721846699 (2022/12)
If no value, or a resistance of > 1 ohm, is displayed ( Fig. 87), 200m 200m replace the differential pressure switch. 200K 20K 1K 0010037281-001 Fig. 84 Measure the electrical resistance across the contacts of the temperature switch (temperature switch not ok) Condens 7000 FP – 6721846699 (2022/12)
▶ Following replacement, plug in (PWM signal) [1] plug at fan. > 1 OFF 1000 1000 200m 200m 200m 200m 200K 20K 1K 0010037305-001 Fig. 89 Measure the electrical resistance across the contacts of the differential pressure switch (differential pressure switch not Condens 7000 FP – 6721846699 (2022/12)
Pressure classification to be used for connecting piece in accordance with EN 1443 P1 with additional mechanical impact stability up to 5000 Pa Condensate resistance classification to be used for flue system in accordance with EN 1443 Condens 7000 FP – 6721846699 (2022/12)
Page 68
10.38 kWh/m 9.79 kWh/m 10.69 kWh/m [kW] 31.8 36.9 36.9 36.1 36.3 42.2 42.2 41.3 45.4 52.8 52.7 51.6 Table 21 Gas throughput (relative to 15 °C gas temperature and 1013 mbar air pressure) Condens 7000 FP – 6721846699 (2022/12)
Table 23 Resistance values 2 similar temperature sensors (twin sensors), which are installed in a single sensor casing, are used as boiler water temperature sensors. All temperature sensors in the boiler have the same sensor curve. Condens 7000 FP – 6721846699 (2022/12)
Boiler water temperature sensor [10] Temperature switch [11] Valve check system (closed during operation) [12] Differential pressure switch (closed during operation) [13] Flue gas pressure limiter (always closed) [14] Control unit [15] Burner control unit Condens 7000 FP – 6721846699 (2022/12)
– % from your gas supplier. 2 max If the specified values for CO and CO are listed in the following 2 max table, the corresponding O value can be read off directly from the table. Condens 7000 FP – 6721846699 (2022/12)
Check tightness of gas line. • Venting the gas line. Establish operating pressure on water side. Check air intake and outlet openings and flue gas connection. 28 Check device equipment. Starting up the control unit and the burner. Condens 7000 FP – 6721846699 (2022/12)
(observe the manufacturer's instructions and the details in Concentration:________% Concentration:_________% the operator's log). Check the heating system water pressure. • Pre-charge pressure of the expansion vessel ( expansion vessel installation instructions) Condens 7000 FP – 6721846699 (2022/12)
Page 74
Check that the control unit is set correctly in – line with demand (see documents for the control unit). Final check of servicing work – Document replacement of components: – Which components were replaced? Condens 7000 FP – 6721846699 (2022/12)
Page 76
Clean the condensation catch pan. Replace the mixture manifold gasket (O-ring). Carry out a function check. Replace components according to the service life. Confirmation that maintenance has been correctly carried out. Company stamp/signature Table 28 Condens 7000 FP – 6721846699 (2022/12)