7
|
Unit installation
7 Unit installation
In this chapter
7.1 Preparing the installation site
7.1.1 Installation site requirements of the outdoor unit
Installer reference guide
62
7.1
Preparing the installation site ................................................................................................................................................
7.1.1
7.1.2
7.1.3
7.2
Opening and closing the units................................................................................................................................................
7.2.1
About opening the units ........................................................................................................................................
7.2.2
To open the outdoor unit ......................................................................................................................................
7.2.3
7.2.4
7.2.5
To close the outdoor unit.......................................................................................................................................
7.2.6
To open the indoor unit .........................................................................................................................................
7.2.7
7.2.8
To close the indoor unit .........................................................................................................................................
7.3
Mounting the outdoor unit ....................................................................................................................................................
7.3.1
7.3.2
7.3.3
7.3.4
To install the outdoor unit .....................................................................................................................................
7.3.5
To provide drainage ...............................................................................................................................................
7.3.6
To install the discharge grille .................................................................................................................................
7.3.7
7.4
Mounting the indoor unit.......................................................................................................................................................
7.4.1
About mounting the indoor unit............................................................................................................................
7.4.2
7.4.3
To install the indoor unit........................................................................................................................................
7.4.4
Choose an installation location with sufficient space to transport the unit in and
out of the site.
Do NOT install the unit in places often used as work place. In case of construction
works (e.g. grinding works) where a lot of dust is created, the unit MUST be
covered.
WARNING
The appliance shall be stored in a room without continuously operating ignition
sources (example: open flames, an operating gas appliance or an operating electric
heater).
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
Mind the spacing guidelines. See
NOTICE
▪
Do NOT stack the units on each other.
▪
Do NOT hang the unit on a ceiling.
10].
"16.1 Service space: Outdoor
62
62
65
65
66
66
66
67
68
69
69
71
72
72
72
73
73
74
75
76
78
80
80
80
80
81
"2 General safety
4
unit" [
259].
EPRA14~18D + ETVH/X16S18+23E
Daikin Altherma 3 H HT F
4P644737-1A - 2022.03