Summary of Contents for Fujitsu Airstage UTP-RX01AH
Page 1
INSTALLATION MANUAL RB UNIT For authorized service personnel only. INSTALLATIONSANLEITUNG KÄLTEMITTEL-ABZWEIGUNGS-GERÄT Nur für autorisiertes Fachpersonal. MANUEL D’INSTALLATION UNITÉ DE DÉRIVATION DE RÉFRIGÉRANT Pour le personnel agréé uniquement. MANUAL DE INSTALACIÓN UTP-RX01AH UTP-RX01BH UNIDAD DE DERIVACIÓN DE REFRIGERANTE UTP-RX01CH Únicamente para personal de servicio autorizado. MANUALE DI INSTALLAZIONE UNITÀ...
INSTALLATION MANUAL This mark indicates procedures which, if improperly per- CAUTION formed, might possibly result in personal harm to the user, or PART NO. 9366249047-03 damage to property. VRF system RB unit Read carefully all security information before use or install the air conditioner. Contents Do not attempt to install the air conditioner or a part of the air conditioner by yourself.
2.3. Accessories 2.4. Optional parts Do not discard the accessories required for installation until the installation work is The following optional parts are available. complete. Description Model No. Application Name and shape Q’ty Application For external input UTY-XWZXZ6 (Dry contact terminal / CNA01) Installation Manual This manual External connect kit...
Select the place to install the product after taking into consideration the following condi- Installation limit (Unit: mm) tions, and after obtaining approval from the customer. Install this unit in a location that has strong support and no vibrations. 20 or more ...
(2) If hung on a wall Cover-B Tapping screw A × 4 (Accessories) Control box Control box cover Hanger × 2 (Accessories) Cover-A 5.6. Changing the positioning of the control box Cable clamp 5.6.1. Attaching to the opposite horizontal face (6) Change the control box (11) CAUTION...
5.7.3. Fix the unit (When hanging on the wall) (2) UTP-RX01BH Use the tapping screw B (accessories) to set up this unit. Table 1) RB unit pipe size Suction gas Discharge gas Gas pipe pipe (mm (in)) pipe (mm (in)) (mm (in)) 6.
6.4.1. Piping insulation Thicknesses of Annealed Copper Pipes (R410A) (1) After the sealing test is complete, carry out insulation work. Pipe outside diam- Thickness Material (2) Insulate all pipes and piping connection parts so that there is no gap in it. eter [mm (in)] [mm] *1 (3) Firmly connect the terminal part (a) so that no air comes in or out.
(4) Use an appropriate screwdriver to tighten the terminal screws. CAUTION Do not use a screwdriver that is too small, otherwise, the screw heads may be When handling PC board, static electricity charged in the body may cause damaged and prevent the screws from being properly tightened. malfunction of the PC board.
Page 9
7.3.3. Wiring method The wiring example for RB units ,outdoor units and indoor units is shown in the fi gure. Outdoor unit Transmission Refrigerant piping Refrigerant piping RB unit RB unit Power Power supply supply IN/U IN/U Breaker Breaker Transmission Transmission Transmission Transmission...
7.3.4. Work procedure 8.2. Address setting (1) Remove the control box cover. (1) RB unit address (2) Connect the transmission cable to When connecting multiple RB units to 1 refrigerant system, set the address at RB the transmission cable terminal. AD SW.
Dry contact terminal ([CNA01]) COOLING/HEATING PRIORITY FUNCTION "Edge" input only When a power supply is unnecessary at the input device you want to connect, use the Dry contact terminal ([CNA01]). PC Board Connector Input signal Command *a: Select very low current use OFF →...