Installation and operation manual
7.2 Assembly work
For assembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Tools
•
Screwdriver - cross-head size 2.5
mm
Remove the dust cap from the following threads:
1.
•
Inlet and outlet on the filter head
•
Condensate drain on the filter base
2.
Depressurise the pipelines or relevant pipe section.
Heed the filter dimensions and make sure there is sufficient space for assembly.
3.
See "6. Dimensions" on Page 24.
4.
Pipes must be able to bear the additional weight of the filter. Additional fixings must be mounted if necessary.
Pipes must be free of contamination and corrosion. Check pipe thread for damage. Defective pipes must be
5.
replaced immediately.
Pipes must be free of mechanical stress and corrosion. Compensate any vibrations which occur by using
6.
vibration dampers.
Only use fittings which are suitable for this pressure and temperature range. The pipe threads must match
7.
those of the filter head.
Execute the condensate drain in such a way that no compressed gas or condensate can escape to the
8.
surrounding of the filter. The condensate to be discharged should be routed to a processing system conforming
to law (e.g. ÖWAMAT
Prerequisites
•
Additional installation and
operation manual for the
accessories used
•
Sealing materials such as e.g. PTFE
tape (EN 837-2)
Preparatory tasks
or BEKOSPLIT
).
®
®
CLEARPOINT
Material
•
•
•
•
•
3eco
coalescence filter
®
Protective equipment
Protective gloves (fluid-
resistant)
Safety goggles with side shields
Hearing protection
Respiratory protection,
protection class FFP 3
Safety footwear
27 | 56