Daikin FTK15JEVM Service Manual page 12

Removal procedure 1.5/2.0/2.5/3.2/3.5/4.6 kw class 9000/12000 btu/h class
Table of Contents
Removal of Electrical Box / Vertical Blades (Pattern 1)
Step
2
Disconnect the
connector for the fan
motor [S200].
Release the fan motor
harnesses from the
hook.
Remove the screw of
3
the electrical box.
Slide the electrical box
4
to the right first and
detach the horizontal
blade from the electrical
box.
Pull the electrical box.
5
10
Procedure
[S200]
Bottom frame
Hook
Points
(R15844)
(R12048)
(R15845)
There is a hook on the
bottom frame. When
reassembling, fit the rear
side of the electrical box to
the hook.
(R11657)
Removal Procedure
Si041051
Hook
(R14602)
Table of Contents
loading

Table of Contents