Huawei DBS3900 LTE Installation Manual page 73

Remote radio unit
Hide thumbs Also See for DBS3900 LTE:
Table of Contents
RRU3260
Installation Guide
Figure 8-16 Installing the third RRU onto the third main bracket
Step 4 Install the metal sheet for neighboring RRUs, as shown in
Figure 8-17 Installing the metal sheet
(1) Screw
1.
Issue ()
Use an M6 Phillips screwdriver to loosen the screw on the metal sheet farther from the
handle of the first RRU and remove the screw.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
(2) Metal sheet
8 Installing the RRU
8-17.
65
Table of Contents
loading

This manual is also suitable for:

Dbs3900Rru3260

Table of Contents